User manual
User manual
greenpin.com
Recommended products for use with Green Pin Tycan
®
Lifting Chain
•
A limited twist of 0.50 turns per meter (per 3.28 feet) is
allowed.
• Keep Green Pin Tycan
®
Lifting Chain away from any sharp
particles, such as metal shavings, and any foreign particle
that may disturb the chain’s geometry during operation. If
such particles are present on the chain, inspect the chain and
remove such particles gently before any use of the chain.
• Green Pin Tycan
®
Lifting Chain is generally resistant to
chemicals, except oxidizing chemicals, avoid contact from
damaging chemicals and/ or consult with a Qualified Person.
• Green Pin Tycan
®
Lifting Chain should be kept away from
direct heat sources.
• In case a dynamic loading situation is to be expected, the load
or WLL should be adjusted accordingly local regulations.
Other remarks
2.6t WLL
4t WLL
Master
links
UMS18
UMTS22
UMS22
UMTS28
Connecting
links
GPUMJT15
GPUMJT20
Shorteners
GPUCRCT15
GPUCRCT20
Chain
FCHLIFT1115
FCHLIFT1120
Hooks
GPUCSCT15
GPUCSCT20
UMS
UMTS
FCHLIFT
UMJT
UMJ
UCSCT
UCRCT
5t WLL
6.8t WLL
UMS22
UMTS28
UMS25
UMTS36
UMJ13
GPUMJT30
GPUCRCT25
GPUCRCT30
FCHLIFT1525
FCHLIFT1330
GPUCSCT25
GPUCSCT30
• Green Pin Tycan
®
Lifting Chain must be inspected before each use
and if any damage is detected removed from service. See Inspection
and Removal from Service Criteria.
• Ensure that Green Pin Tycan
®
Lifting Chain is rigged
according to the load, the planned lift and according to the boundary
conditions set forth in the user manual.
• Ensure load reduction factors are calculated and planned for
according to charts and tables further in this manual.
• Use Green Pin Tycan
®
Lifting Chain only with a minimum
number of 5 load bearing links per sling leg.
Always take into
account; the maximum
load of the
configuration is limited
by the component with
the lowest WLL. The
recommended
components in
combination with Green
Pin Tycan
®
Lifting Chain
are approved to use up
to the chain WLL.