background image

PAGE 7

4.5  ADDITION OF DESICCANT

WARNING

DO NOT REMOVE, REPAIR, OR REPLACE ANY ITEM ON

THE DRYER WHILE IT IS UNDER PRESSURE.

DEPRESSURIZE THE DRYER COMPLETELY BEFORE

STARTING INSTALLATION AND/OR MAINTENANCE

PROCEDURES.    SERIOUS PERSONAL INJURY MAY

RESULT IF THESE SAFETY RULES ARE NOT FOLLOWED.

DO NOT REMOVE THE HATCH COVER UNTIL ALL AIR

PRESSURE IS OUT OF THE VESSEL.  PUSH ON THE

HATCH COVER BY HAND TO FIND OUT IF THE VESSEL

PRESSURE IS REDUCED TO ZERO.

DO NOT TRY TO TIGHTEN THE HATCH COVER IF YOU

HEAR OR FEEL A LEAK.  IMMEDIATELY SHUT OFF THE

AIR OR GAS SUPPLY TO THE VESSEL AND REDUCE THE

DRYER PRESSURE TO ZERO.

ALWAYS INSTALL A NEW GASKET EVERY TIME THE

HATCH COVER IS REMOVED, OR AT LEAST ONCE PER

YEAR.  REPLACE THE HATCH COVER EVERY FIVE

YEARS REGARDLESS OF CONDITION.  USE VAN AIR

AUTHORIZED PARTS ONLY.

DO NOT USE POWER TOOLS OR CHEATER BARS TO

TIGHTEN THE NUT ON THE COVER.  TOO MUCH FORCE

CAN DISTORT THE COVER AND/OR THE GASKET.  IF

DAMAGED BY OVERTIGHTENING, THE COVER CAN

BLOW OUT AND CAUSE SERIOUS INJURY.  (Note:

Tighten the nut until it is snug only.  When pressure is in

the vessel, the seal will be complete.)

INSPECT THE COVER AND SEALING SURFACE EVERY

TIME THE COVER IS REMOVED, OR AT LEAST ONCE A

YEAR, FOR DAMAGE SUCH AS CORROSION, CRACKS,

OR DISTORTION.  IF THERE IS ANY DAMAGE, INSTALL A

NEW COVER AND GASKET.  USE VAN AIR AUTHORIZED

PARTS ONLY.

Open the bypass valve.  Close the dryer inlet and outlet isolation

valves.  If the bypass and inlet and outlet isolation valves were not

installed, shut down the air system.

Open the drain valve and allow the dryer to depressurize completely.

Loosen the wing nut on the hatch cover.  Do not remove the nut, or

the cover will fall into the vessel.

Push on the hatch cover.  If the vessel is depressurized, the cover will

unseal.  Once the seal is broken, slide the handle so that it is parallel

with the centerline of the long side of the opening.  Tilt the hatch cover

and remove it from the dryer.

Add the amount of desiccant tablets required to raise the supply to

the normal operating level or to maximum level (see FIGURE 5); then

level off the tablet bed.

CAUTION

Make sure that the desiccant does not cover the screen

on the outlet pipe.

Do NOT overfill the vessel.  Adequate space must be left

to allow the hatch cover to be installed.

Check the condition of the hatch covet.  If is damaged, it must be

replaced.  The gasket should be replaced every time.

Check the sealing surface of the opening.  If it is contaminated with

dirt or rust, it must be cleaned before installing the hatch cover.  A

contaminated  surface may prevent the gasket from properly sealing.

Install the filler hatch cover and gasket.  Finger tighten the wing nut

on the hatch cover.  Overtightening will cause damage to the nut.  The

cover will seal when the vessel is pressurized.

Start the dryer following the start up procedures in Section 3.1

4.5-B  DESICCANT USAGE GUIDE

The chemical and physical characteristics of Van Air desiccant

contribute to its effectiveness and economy.

The DESICCANT CONSUMPTION RATE should be used as a

guide  to  estimate  the  usage  of  desiccant  your  installation  will

require.  The formula is based on an annual usage rate of one shift

per  day,  5  days  per  week  and  50  weeks  per  year  or  2,000

operating hours per year.  The figure is an average and may vary

depending upon your actual conditions (i.e. 24 hour operation,

higher inlet temperature, excessive liquid water content and/or

contaminants.)

DESICCANT CONSUMPTION

(Based upon 1 shift for a one year period @ 100 psig inlet pressure

and 75

o

F inlet temperature, 100% RH.)

FLOW

SCFM

100

1,000

10,000

DRY-O-LITE

LBS/YEAR

132

1,320

13,200

SP

LBS/YEAR

665

6,650

66,500

10 BF

LBS/YEAR

576

5,760

57,600

To use the chart, first determine the SCFM that is being

processed through the dryer.  Locate the nearest flow rate listed

on the chart and interpolate as necessary.

The consumption rate is proportional to the moisture loading.

Each 20

o

F change in inlet temperature changes the moisture

loading by a factor of nearly 2:1.

The quantity shown in the consumption rate chart is NOT the

quantity that must be added to the dryer at one time.  The bed

level should be maintained at least to the minimum level at all

times to ensure optimum drying capabilities. 

 The consumption

rate is an approximation of how much desiccant will be

added over a period of one year.

4.5-A  BED LEVEL GUIDE

To determine the supply of desiccant in the dryer, insert a

measuring stick through the filler hatch until it reaches the top

of the desiccant bed; dimensions in FIGURE 5 are calculated

from the filler hatch to levels indicated on the drawing. (NOTE:

Dimensions are approximate and are intended as a general

guide only.)

SECTION 4

MAINTENANCE

Содержание D-42

Страница 1: ...AIR AUTHORIZED PARTS ONLY DO NOT REMOVE REPAIR OR REPLACE ANY ITEM ON THE DRYER WHILE IT IS UNDER PRESSURE DEPRESSURIZE THE DRYERCOMPLETELYBEFORESTARTINGINSTALLATIONAND OR MAINTENANCE PROCEDURES SERI...

Страница 2: ...rges through the dryer If the ambient temperature around the receiver is higher than the outlet air temperature from the aftercooler locate the dryer between the aftercooler and the receiver 2 1 F SPE...

Страница 3: ...49 2000 3398 2500 4248 3000 5097 3500 5947 4000 6796 4500 7646 125 PSIG 8 6 Bar 1522 2587 1827 3104 2436 4139 3045 5173 3654 6208 4263 7243 4872 8277 5481 9312 150 PSIG 10 3 Bar 1795 3050 2154 3659 28...

Страница 4: ...PES OF DRAINS TO FAIL THUS RESULTING IN FLOODING OF THE DRYER The drain of the dryer can be remotely piped away from the dryer DO NOT connect the drain line to a pressurized line Make sure that the li...

Страница 5: ...9mm 18 7 16 468 3mm 20 11 16 525 5mm 20 11 16 525 5mm E 27 13 16 706 4mm 31 7 8 809 6mm 34 3 8 873 1mm 35 5 16 896 9mm 36 3 8 923 9mm 36 15 16 938 2mm 41 1 2 1054 1mm 41 1 2 1054 1mm F 1 NPT 1 NPT 1 N...

Страница 6: ...he air supply lines 3 2 OPERATING THE DRYER The simple design of the single tower dryer allows for easy operation The dryer requires two procedures to ensure peak performance On a new installation con...

Страница 7: ...he hatch cover to be installed Check the condition of the hatch covet If is damaged it must be replaced The gasket should be replaced every time Check the sealing surface of the opening If it is conta...

Страница 8: ...2391 1085 2789 1265 Lbs In of bed 52 7 23 9 68 3 31 0 86 5 39 2 106 6 48 4 128 7 58 4 153 4 69 6 179 4 81 4 209 3 94 9 MIN Level 949 430 1229 557 1557 706 1919 870 2317 1051 2761 1252 3229 1465 3767 1...

Страница 9: ...freezing the drain line and valve s may freeze If ambient temperatures fall below freezing the drain line can be wrapped with heat tracing and or insulation to prevent freezing If maintaining the req...

Страница 10: ...TOP RING SECTION D 54 TOP RING SECTION D 60 TOP RING SECTION D 66 TOP RING SECTION D 72 TOP RING SECTION D 78 TOP RING SECTION D 84 TOP RING SECTION D 42 GRID TUBES D 48 GRID TUBES D 54 GRID TUBES D...

Страница 11: ...PAGE 11 SECTION 6 REPLACEMENT PARTS...

Страница 12: ...ake City PA 16423 2095 Phone 814 774 2631 Fax 814 774 3482 YOUR VAN AIR REPRESENTATIVE IS NAME COMPANY ADDRESS CITY STATE ZIP PHONE FAX ATTACH BUSINESS CARD HERE Air Vacuum Process Inc 14090 FM 2920 S...

Отзывы: