11.
Connect the PTO drivline:
a. Raise the input shaft guard.
b. Check that the driveline telescopes eas-
ily and that the shield rotates freely.
c. Attach the driveline to the chipper input
shaft by depressing the lock pin, slide
yoke over the shaft and pushing on the
yoke until the lock pin clicks into posi-
tion.
NOTE
Be sure the yoke with the shear pin
is attached to the machine shaft.
Aligning
d. Lower the guard to cover the input shaft.
Installed
Fig. 8 DRIVELINE (TYPICAL)
12. Depress handle on discharge chute
latch and turn assembly to its desired
position. Turn until latch seats in its
detent.
Fig. 9 DISCHARGE CHUTE
Содержание z9400
Страница 3: ......
Страница 13: ......
Страница 19: ...4 Cut the tie down straps Fig 2 TIE DOWNS 5 Lay out components next to machine BX32 Fig 3 LAY OUT BX62...
Страница 49: ...Annually 1 Clean machine BX32 GFWCX4 Fig 45 MACHINE BX62...
Страница 55: ......
Страница 56: ......
Страница 57: ......