![VALTIR EURO-ET END TERMINAL Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/valtir/euro-et-end-terminal/euro-et-end-terminal_product-description-assembly-manual_3278371022.webp)
Valtir.com
21
Revision D February 2023
Assembly Checklist
COUNTRY:
DATE:
PROJECT:
LOCATION:
□
The rail height is in accordance with the plans (generally 700 mm to 750 mm) above the edge
of the shoulder of the ground line.
□
The 19 mm hex head bolts that connect the HBA Bottom Posts to the HBA Top Posts are at
ground level and HBA Bottom Posts do not protrude more than 100 mm above the ground line
(measured by the AASHTO 1.5 m cord method). Site grading may be necessary to meet this
requirement.
□
The 19 mm hex head bolts that connect the HBA Bottom Posts to the HBA Top Posts are
tightened to a snug position.
□
The end of the Anchor Guardrail is fully inserted into the Guardrail Extruder Head and butted
up to the beginning of the bending slot inside the Guardrail Extruder Head.
□
The HBA Top Post 1 is the only post with holes for attaching the Guardrail Extruder Head and
has connecting plates cut at a 45 degree angle.
□
The 203 mm x 203 mm Bearing Plate at post 1 is correctly positioned, with the tabs resting on
the post plates (ears) of the HBA top post, and the Cable Assembly is taut and correctly
assembled (it should be rechecked after assembly to be sure it has not relaxed).
□
Any grout, backfill, or other materials (such as concrete, asphalt, or soil) must be low enough
so as not to obstruct, constrain, or otherwise engage the bearing plate.
□
The backfill material around the posts is properly compacted.
□
Each HBA Post has two bolts on either side of the post and should be oriented so that the
larger bolt is downstream of the smaller bolt.
□
The Anchor Guardrail and Standard Guardrails are
not
attached to the posts at post
locations 1, 3, 5 and 7.
□
The object marker (if required) is correctly positioned on the Guardrail Extruder Head
Face.
□
The Tether Cable attaches HBA
®
Top Post 2 to the Cable Assembly. It is secured to both
points by a Thimble and two (2) Cable Clips.
SIGNATURE:
Содержание EURO-ET END TERMINAL
Страница 1: ...PN 619489 REVISION D FEBRUARY 2023 EURO ETTM END TERMINAL PRODUCT DESCRIPTION ASSEMBLY MANUAL...
Страница 24: ...Valtir com 23 Revision D February 2023 EURO ET Drawing...
Страница 25: ...Valtir com 24 Revision D February 2023 Notes...
Страница 26: ...Valtir com 25 Revision D February 2023 Notes...
Страница 27: ...Valtir com 26 Revision D February 2023 Notes...