gpelectric.com | [page 17]
INSTALLATION
4.9 BATTERY BANK CONFIGURATIONS
5. MAINTENANCE
5.1 INSPECTION
After installing any Go Power! Solar Kit or any other Go Power! products, all modules, electrical and mechanical components
and connections should be inspected annually by a trained Go Power! or dealer representative or other qualified personnel for
safe electrical and mechanical connections and to ensure modules are corrosion-free and vehicle mounting has not affected
connections.
5.2 CLEANING
Although Go Power! Solar Kits are generally maintenance free, significant performance gains can be made with clean solar panels
1. Clean the solar panels monthly. Use water and a soft sponge or cloth. A mild non-abrasive cleanser can be used for more
stubborn residue. Rinse well.
2. Clean solar panels more frequently during drier months, as they may become covered in dust more quickly. A pressure
washer is not recommended.
3. Visual inspection – check the exterior for cracks, missing or broken hardware or other potential problems. Check all roof
penetrations and replace sealant areas as required
5.3 LONG TERM STORAGE - RV
If your RV will be stored in extremely cold climates you may need to remove your batteries to prevent them from freezing. Please
note if your solar panel(s) are covered by snow they will not produce power and can not be depended upon to keep the batteries
topped up. In mild climate storage you can depend upon your solar system to top up your batteries when they are exposed to
sunlight. Make sure that all parasitic draws are removed from the batteries i.e. Propane detector, clock radio, etc to make sure
the solar panel(s) can keep the batteries topped up even with reduced sun exposure.
6.
Ring
Terminal
Legend
Ring
Terminal
Cable
Fuse
Fuse
Fuse
Fuse
6V
200A/hr @ 6V
6V
200A/hr @ 6V
Series: 2 x 6V
System Voltage = 12V
System Capacity =
200A/Hr
Series & Parallel: 4 x 6V
System Voltage = 12V
System Capacity =
400A/Hr
6V
200A/hr @ 6V
6V
200A/hr @ 6V
6V
200A/hr @ 6V
6V
200A/hr @ 6V
Parallel: 4 x 12V
System Voltage = 12V
System Capacity =
400A/Hr
Parallel: 2 x 12V
System Voltage = 12V
System Capacity =
200A/Hr
12V
100A/hr @ 12V
12V
100A/hr @ 12V
12V
100A/hr @ 12V
12V
100A/hr @ 12V
12V
100A/hr @ 12V
12V
100A/hr @ 12V
FIGURE 4-J: TYPICAL BATTERY BANK CONFIGURATIONS
Содержание Go Power! SOLAR FLEX KIT GP-FLEX-100
Страница 2: ......
Страница 9: ...gpelectric com page 9 GENERAL INFORMATION 1 2 3 4 6 5 7 8 9 10 11 12 13 14 15 16 17 18 19 30 10...
Страница 22: ......