12 of 19
11.
CERAMIC FUEL BED INSTALLATION
11.1.
Ceramic Walls Installation
1.
Locate the ceramic rear wall on top of the base coal support as shown in fig 12.
2.
Insert the right hand sidewall at approx 30 degree angle between the firebox side and the burner. Swing the top of the
sidewall to the vertical position and locate behind the upper baffle (see fig13).
3.
Repeat step 2 with left hand sidewall (Fig 13)
Fig 12 Back Brick Installation
Fig 13 Side Brick Installation