manualshive.com logo in svg
background image

2

8¾ to 10¾

4” dia.
collar

Stand-offs

ZC at back

‘B’

‘A’

Installation

1.  Install the 738 or 739 engine as per instructions 

supplied with the engine. Install the RF24XB 
engine and the RA24ZC zero clearance box as per 
instructions supplied with each.

2.  Install the trim to the engine as per instructions 

supplied with engine or trim.

3.  Hook the Contemporary Front with the barrier 

screen attached to the engine trim.

738/739 and RA24ZC Mantel Clearances

29-1/4” (74,3 mm)

23”

 (58,3 mm)

Mantel

‘A’

‘B’

Outer Trim
Supplied
Separately

Mantel 
Projection A

1” 

(25 mm)

1”– 6”

(25–152 mm)

9”

(229 mm)

12”

(305 mm)

Mantel 
Height B*

36” 

(914 mm)

39”

(991 mm)

42”

(1067 mm)

45”

(1143 mm)

‘A’

‘B’

Отзывы: