Valor H5 1100MN Скачать руководство пользователя страница 26

26

Planning

 Wall Finish

 Plan the Wall Finish

Non-Combustible Materials Specifications

Non-combustible materials are those which will not 

ignite and burn. Such materials are those consisting 

entirely of steel, iron, brick, tile, concrete, slate, glass 

or plasters, or any combination thereof.
Materials that are reported as passing ASTM E 136, 

Standard Test Method for Behavior of Materials in a 

Vertical Tube Furnace

 at 750 °C shall be considered 

non-combustible materials.

Combustible Materials Specifications

Materials made of or surfaced with wood, compressed 

paper, plant 

fi

 bers, plastics, or other material that 

can ignite and burn, whether 

fl

 ame proofed or not, 

or plastered or unplastered shall be considered 

combustible materials.

Non-Combustible Cement Board

The H5 

fi

 replace requires a 1/2” (13 mm) thick non-

combustible cement board or equivalent, to be used 

as a wall surface immediately above the unit—see 

diagram for minimum coverage.
Extending the cement board well beyond the 

minimum shown will help avoid cracking due to 

di

 erential expansion of materials. 

Pre-drill cement board with oversized holes and do 

not over-tighten screws to avoid cracking due to heat 

expansion. 
Standard gypsum wall board may be used beyond 

the perimeter of the cement board although it is 

preferable not to change materials to help avoid 

cracking. 

Finishing Around Trims

Additional non-combustible material such as tile, etc., 

may be applied over top of the wall surface or you 

may choose to leave it 

fi

 nished clean with no tile.

Be aware that a trim is always required and that the 

wall 

fi

 nish thickness must be taken into account for all 

installations other than the 1130FFK—Fixed Framing 

Kit and the 1130CIK—Clean Install Kit.
All the other trims, 1135, 1140v2 and 1184 will 

accept wall 

fi

 nish tucked under their edge up to 

approximately 2” thick.

Minimum cement board dimensions

Min. 39½” [1003 mm]

Min. 12”

[305 mm]

Non-combustible

board required 

thickness: 

½ inch [13 mm]

1130FFK

Fixed Framing Kit

1184EC Edgemont 

Craftsman Trims

1135TSB 

3-Sided Trims

1140FSBv2 

4-Sided Trims

1130CIK

Clean Install Kit

Содержание H5 1100MN

Страница 1: ...s instructions If you cannot reach your gas supplier call the fire department Installation and service must be performed by a qualified installer service agency or the gas supplier Hot glass will caus...

Страница 2: ...s reserved Designed and manufactured for Miles Industries Ltd Valor Fireplaces 190 2255 Dollarton Highway North Vancouver BC Canada V7H 3B1 T 604 984 3496 F 604 984 0246 valorfireplaces com This appli...

Страница 3: ...t Termination Location 33 Vertical Vent Termination 34 Co linear Conversion 35 Applications 35 Installing Into an Existing Fireplace 36 Partial Installation Into an Existing Fireplace 37 Installation...

Страница 4: ...educed when barrier screen is installed Solid wood flooring in front of the fireplace if al lowed may shrink during the heating season due to heat Some materials or items although safe may discolor sh...

Страница 5: ...ed to a chimney serving a separate solid fuel burning ap pliance Each gas appliance must use a separate vent system Common vent systems are prohibited Intended use This appliance is designed and appro...

Страница 6: ...Pressure in w c 10 14 Main Burner Injector Marking 36 DMS 51 DMS PSE Pilot Injector Marking BL22N BL14LP Min Rate By Pass Screw 185 125 Supply Gas Heater engines 1100MN is used with natural gas Heate...

Страница 7: ...Sided Trim Black 1140FS 2 Four Sided Trims 4006326 1184EC Edgemont Craftsman Trims 4008798 Gas Conversion Kits 1100MPGK Conversion to propane gas 1100MNGK Conversion to natural gas Other Accessories...

Страница 8: ...required and may be reduced if positioning the unit forward of the framing to accomodate thickness of non combustible material over top of non combustible board 1 5 8 4 3 8 3 16 1 2 to front of stud...

Страница 9: ...ting configuration 2 Unpack the appliance removing all items packed inside and around it Recycle packaging 3 Check that you have everything required for the in stallation using the Pack Content sheet...

Страница 10: ...they conform to chart on page 11 Non combustible hearth see Framing on pages 14 16 Combustible floor 1 2 Micore supplied with appliance Use as a thermal break between non combustible hearth material a...

Страница 11: ...83 101 Combustible Mantel Left Side View Bottom of Unit 0 2 1 4 6 8 10 12 Do not put furniture or objects within 36 914 mm of front of appliance Mantel Projection from Face of Cement Board Mantel Heig...

Страница 12: ...shed Wall above unit Shading denotes allowable location for combustible mantel legs Note Right Side clearances are the same FIREPLACE Depth 1 2 3 4 5 6 or greater Clearance 3 4 5 6 7 8 Combustible Sid...

Страница 13: ...LQH QRW VXSSOLHG 6HH SDJH Q VXUIDFH GLUHFWO LQ IURQW RI WKH XQLW ZKLFK LV DW D KHLJKW RI OHVV WKDQ IURP WKH ERWWRP RI WKH XQLW PXVW EH QRQ FRPEXVWLEOH Rear Vent 16 1 2 Top Vent 17 1 2 NOTE This unit r...

Страница 14: ...eting tile or other combustible material other than wood flooring the appliance shall be installed on a metal or wood panel extending the full width and depth of the appliance Hearth WARNING The H5 is...

Страница 15: ...ce of com bustible floor or carpet and the distance between the hearth and the bottom of the fireplace 3 Combustible baseboards 1 inch thick or less located on the wall are acceptable provided they ar...

Страница 16: ...r should be set back 1 2 behind front face of framing otherwise topface of shims may be visible Surface of Combustible Floor or Carpet Bottom of fireplace ood is Allowed directly below fireplace ny sh...

Страница 17: ...s around vertical vent pipe Approx 9 1 4 35 mm from back surface RI ZDOO QLVK WR front surface of appliance case Z QR YHQW R VHW PARTIAL SHELF top outlet 1 2 13 mm WKLFN non combustible board 6WDQG R...

Страница 18: ...Takeo Horizontal Takeo Venting Considerations Notes ALL venting considerations Dimensions of venting are based on using Dura Vent elbows Elbow curve radius dimensions will vary when using other brand...

Страница 19: ...ustible and combustible material underneath Appliance Depth in Framing 1130FFK Fixed Framing Kit and 1130CIK Clean Install Kit install at framing stage and the appliance position is fixed in the frami...

Страница 20: ...in front of the appliance if within 4 vertically of the bottom of the appliance See Framing on pages 13 16 of this manual for hearth requirements details The non combustible hearth in front of the app...

Страница 21: ...hen applied over top of the flanges and butted up to the frame of the 1130 1130 Fixed Framing Kit fixed position side brackets supplied with appliance not required appliance positioning brackets suppl...

Страница 22: ...g on pages 13 16 of this manual for hearth requirements details The non combustible hearth in front of the appliance if within 4 of the bottom of the appliance must include the 1 2 Micore insulation b...

Страница 23: ...er top of the flanges and butted up to the frame of the 1130CIK 1130CIK Clean Install Kit fixed position side stud brackets supplied with appliance not required appliance positioning brackets supplied...

Страница 24: ...s no hearth the bottom of the appliance must be raised at least 4 inches above any combustible floor in front With hearth The bottom of the appliance must be installed level with the top of the hearth...

Страница 25: ...h thickness tucked behind the trim Appliance Depth in Framing with 3 and 4 Sided Trims 3 and 4 Sided Trims adjustable position wall finish thickness up to 3 4 1 2 non combustible board trim s depth on...

Страница 26: ...tending the cement board well beyond the minimum shown will help avoid cracking due to di erential expansion of materials Pre drill cement board with oversized holes and do not over tighten screws to...

Страница 27: ...a satu rated condition Running the fireplace for an extended period before final finishing will help drive out mois ture Always pre drill screw holes through cement board and use screws with self mil...

Страница 28: ...hes in thickness A non combustible wall can be of any thickness up to the maximum horizontal run of vent pipe allowed for the particular installation Tape all joints including all elbow joints Framing...

Страница 29: ...MBLE PIPE LENGTH PIPE LENGTH MIN 12 PIPE LENGTH MIN 12 PIPE LENGTH 2 2 CEILING FIRESTOP ATTIC FIRESTOP ATTIC INSULATION SHIELD FLASHING STORM COLLAR VERTICAL TERMINATION Venting Typical Co axial Venti...

Страница 30: ...ent to 18 inches horizontal pipe 7 All horizontal pipe runs must be graded 1 4 inch per foot upwards in the direction of the exhaust flow The final pipe length when terminating through the wall may be...

Страница 31: ...2 vertical pipe rise NO straight out rear r HOERZ WDNH R supplied with unit 1 min all around vertical pipe 3 min above top of horizontal pipe 1 min around bottom sides of horizontal pipe Use an approv...

Страница 32: ...run and number of elbows The amount of restriction is based on laboratory tests The ideal restrictor position may vary slightly especially when the vent pipe length is near the limits of the acceptab...

Страница 33: ...n 15 feet 4 6bm below the terminal 36 90 I Clearance to service regulator vent outlet 36 90 J Clearance to non mechanical air supply inlet to the building or the combustion air inlet to any other appl...

Страница 34: ...24 unvented soffit Min 36 vented soffit Termination cap Min 18 Storm collar Roof flashing H Vertical Vent Termination Venting Co axial Roof Pitch Minimum H feet Flat to 7 12 1 Over 7 12 to 8 12 1 5 O...

Страница 35: ...an adjacent chimney See the following pages for each installation details Rules for Co Linear Venting Maximum 40 feet vertical pipe Minimum 10 feet vertical Maximum o set 8 feet with liners at minimu...

Страница 36: ...r air inlet and 1 x 4 inch diameter for exhaust Co linear termination kit 3 x 4 and flashing or co linear to co axial adapter and either high wind vertical vent terminal cap or a low profile vertical...

Страница 37: ...ccessories Co axial to co linear adapter at appliance Valor 1156CLA 46DVA GCL34 or equivalent 2 lengths of 2 ply flexible chimney liner approved for venting gas appliances 1 x 3 inch diameter for air...

Страница 38: ...quired accessories Co axial to co linear adapter at appliance 46DVA 34CLAA 46DVA GCL34 or equivalent 2 lengths of 2 ply flexible chimney liner approved for venting gas appliances 1 x 3 inch diameter f...

Страница 39: ...al Cap Co Linear to Co Axial Adapter Flashing With Alternate Co linear to Co axial Conversion at Terminal 46DVA GCL34 46DVA 34CLAA Co linear Kits Typical Co linear Venting Components Flashing Kit Co L...

Страница 40: ...oard liners and fuel beds packed separately trim kit with barrier screen venting components and accessories HeatShift System components if used electrical components if necessary Install Stando s The...

Страница 41: ...Convert Vent Outlet if required This unit is supplied with a top vent outlet which can be field converted to a rear vent outlet Please note that the rear outlet requires the installation of the heat s...

Страница 42: ...e the four latches around the window frame 2 For each of the four latches pull the latch with your finger towards you and unhook it from the window frame bracket 3 Carefully lift up the window and pul...

Страница 43: ...ce by 3 screws located right behind the upper edge of the fireplace opening Recycle this panel as it is no longer needed Appliance Preparation Optional HeatShift Install HeatShift Take O Collars 1 Rem...

Страница 44: ...you have all the pieces on hand 2 On top of appliance s case in front of the stand o s remove positioning brackets 2 screws each On top each side of the win dow remove the convection brackets 1 nut s...

Страница 45: ...the framing and secure it to the studs on each side 6 fixing points per side 7 Set aside the side doors removable panel and bar rier screen to install later when the appliance s set up and wall finis...

Страница 46: ...top each side of the window remove the con vection brackets 1 nut side 1130CIK Kit Content RH side panel LH side panel Top panel LH side door RH side door Removable panel Barrier screen Lower panel U...

Страница 47: ...rip over the ba e s tabs then secure the strip and ba e together with 3 countersunk screws supplied ONLY with HeatShift Remove the 3 screws retain ing the removable convection ba e remove the ba e the...

Страница 48: ...ming and secure it to the studs on each side 5 fixing points per side Use wood screws not supplied 7 Set aside the side doors removable panel and bar rier screen to install later when the appliance s...

Страница 49: ...fram ing Ensure that unit is at the right height with consider ation to the height of hearth or combustible flooring When setting the position of the appliance within the framing the front surface of...

Страница 50: ...nal accessories have not been purchased It is much easier to wire before wall finish is applied Wiring within the receptacle enclosure must have a minimum 90 C temperature range Wire nuts not included...

Страница 51: ...m de mand of the appliance without undue loss of pressure Sealant used must be resistant to the action of all gas constituents including propane gas Sealant should be applied lightly to male threads t...

Страница 52: ...ation or servicing All leaks must be corrected immediately When testing for leaks Make sure that the appliance is turned o Open the manual shut o valve Test for leaks by applying a liquid detergent or...

Страница 53: ...place 3 Place the rear panel against the back of the firebox behind the rail retainers at the bottom and behind the side panel already installed Note If you are installing the optional 1105RGL Re flec...

Страница 54: ...amic Plaque 1 Place the front left and right ceramic pieces of the plaque on the burner cover as shown 2 Place the rear right ceramic piece 3 Place the rear left ceramic piece Logs 1 Place ember bed H...

Страница 55: ...n the right flat knob on H53 5 Place log H52 resting its end in the recess in the plaque and its other end on top of H50 6 Place log H51 resting its forked end in the recess in the plaque and its othe...

Страница 56: ...ts forked end on the center log H53 on a horizontal plane its other end on H55 H57 H55 H57 installed top view H57 H53 H55 H56 H50 1100BLK installed H54 H51 H53 H50 H52 H55 H57 H56 NOTE Logs H56 H55 an...

Страница 57: ...lied Installation Carefully unpack the kit Each log is stamped at the bottom with an alpha numeric code to help identify it Ceramic Plaque 1 Place the front left ceramic piece of the plaque on the bur...

Страница 58: ...on the right side of the plaque resting it into depressions as shown 3 Install log H35 on the left side of the plaque resting it into depressions as shown 4 Install log H38 resting it on the knot on t...

Страница 59: ...59 Fuel Beds Installation 5 Add pebbles on the ceramic plaque only as desired Logs installed H35 H36 H37 H38 H38...

Страница 60: ...tify it Ceramic Plaque 1 Place the front left and right ceramic pieces of the plaque on the burner cover 2 Place the rear right ceramic piece 3 Place the rear left ceramic piece Logs 1 Place ember bed...

Страница 61: ...e in the recess in the plaque and its other end on top of H41 6 Place log H42 resting its base in the recess in the plaque and its other end on top of H41 7 Place the bigger Y shaped log H46 resting i...

Страница 62: ...g its forked end on ember bed H53 on a horizontal plane its other end on H45 H47 installed top view H47 H53 H45 H46 H41 1100LSK installed H44 H42 H53 H41 H43 H45 H47 H46 H47 H45 NOTE Logs H46 H45 and...

Страница 63: ...not covered by the Valor Warranty Hot Glass Warning Plate Installation Window Re Installation Reinstall and Check Window To reinstall the window 1 Place the top window frame tabs above the firebox and...

Страница 64: ...xtra har ness at fireplace end 3 Connect white connector to auxillary 5 pin junction and power connection to jack 4 Run harness assembly to mounted position of junc tion box securing harness to framin...

Страница 65: ...or battery snap connection 13 Make the snap connection load 4 AA alkaline bat teries into holder included with fireplace then feed back into junction box assembly Note Do not put batteries in the rece...

Страница 66: ...l hear two short beeps confirming the pairing is done If you hear one long beep the pairing sequence has failed or the wiring is incorrect This is a one time pairing only and is not required when chan...

Страница 67: ...etting for ALL installations Increasing aeration air shutter open will cause the flames to appear more transparent and blue showing more ceramic e ects glow Decreasing aeration air shutter close will...

Страница 68: ...stall as well the barrier screen which is provided with the trim Show the customer how to remove the barrier screen to access the controls Follow the instructions provided with the trim and leave thos...

Страница 69: ...POWER V Module optional 120V Low voltage Fan optional FAN AC Power MAN Knob Combination Control Valve Main Valve Knob PANEL red yellow Receiver Antenna RESET Button RBWSK Connector Battery Holder Bat...

Страница 70: ...34CLTA ADT CTB TM 4CTA 4DCAT33 DV to B Vent Adapter DVA5BV6 Aluminum Flexible Liner 3 or 4 diameter NOTE 2 ply liner approved to CAN ULC S635 suitable for venting gas appliances As manufactured by Z...

Страница 71: ...F 4F SV4F 949606001 Masonry Flashing TF 4MF 559FSK New Siding Flashing 658NSFK Various Venting System Parts Wall Thimble 46DVA WT 4DT WT TM 4WT SV4RSM 4DWT 949064U Storm Collar 46DVA SC 4DT SC TM SC S...

Страница 72: ...d however that during said thirty 30 day period a battery operated carbon monoxide detector with an alarm shall be installed 2 APPROVED CARBON MONOXIDE DETECTORS Each carbon monoxide detector as requi...

Страница 73: ...ial venting system instructions shall be included with the appliance or equipment installation instructions and 2 The special venting systems shall be Product Approved by the Board and the instruction...

Страница 74: ...cess is in progress When the pilot is lit the Flame Adjustment knob 3 will automatically rotate to the highest setting Press the button on the remote control handset to reduce the flame height On the...

Страница 75: ...Battery Status Eco Mode F or C To Turn On Fire One Button lighting default Two Button lighting simultaneously Press and hold for 4 seconds until 8 short beeps and a blinking series of lines con rms th...

Страница 76: ...untdown Timer AM AM To deactivate functions 1 Install batteries All icons are displayed and ashing 2 While the icons are ashing press the relevant func tion button and hold for 10 seconds 3 The functi...

Страница 77: ...only works in Manual Thermostatic and Eco modes Maximum countdown time is 9 hours and 50 minutes Light Dimmer Operation On Press is displayed Light is on at preset level Off Press disappears Light tur...

Страница 78: ...WiFi the handset will display APP Manual Mode The on o status of the replace as well as ame height are manually controlled by the user PM ON OFF PM PM Thermostatic Mode On Press is displayed Preset t...

Страница 79: ...To con rm press ON ON Off Time Setting PROGRAM 1 1 1 OFF are displayed ALL is displayed brie y Hour ashes 2 To select hour press or 3 To con rm press 1 OFF are displayed ALL displayed brie y Minutes...

Страница 80: ...imum countdown time is 9 hours and 50 minutes CAUTION Do not use a screwdriver or other metallic object to remove the batteries from the battery holder or the handset This could cause a short circuit...

Страница 81: ...no pilot ame No gas supply Air in pilot supply line No spark Reversed polarity in thermocouple wiring Incorrect pilot ori ce if valve has been converted from LPG to NG or vice versa F07 Low battery s...

Страница 82: ...adually increase flame height Press and hold small flame button to gradually decrease flame height The Wall Switch can be used to control your fireplace You can turn the pilot on or o and you can incr...

Страница 83: ...tallation H5 H6 with HeatShift Instructions for use with following Valor Heater Models 1100J M 1150J 1400J K and M Incompatible with earlier models 1100I 1150I and 1400I WARNING DO NOT cover or place...

Страница 84: ...n Plates 2 for wall valance discharge ONLY LDK9 30 Plenum 7 3 4 197 mm LDK1 48 x 2 LDK4 38 x 2 LDK3 2 14 x 6 2 14 x 6 grilles included white 4 take off collars included 4 take off collars included 4 t...

Страница 85: ...um 2 ply Flex Kit 2 x 10 0 lengths may be cut to required length LDK10 30 Finishing Frame to use with LDK9 3 5 8 92 mm 3 5 8 92 mm LDK6 2 10 x 5 aluminum ex LDK5 supplied separately 38 frame white LDK...

Страница 86: ...D K 4 Min 51 5 8 LDK1 Min 44 1 2 LDK4 M i n 7 3 u s i n g 4 8 L D K 1 M i n 6 3 u s i n g 3 8 L D K 4 Note LDK Plenum may require larger minimum corner cavity than heater minimum corner cavity plan a...

Страница 87: ...3 LDK4 and LDK9 kits Flexible or rigid 5 diameter UL 181 Class 1 Air Duct 4 use LDK6 kit or equivalent Min 2 1 2 clearance to ceiling Min 30 Max 12 0 See table for offsets H5 29 H6 34 1 2 H5 19 1 4 H6...

Страница 88: ...n 14 Flexible or rigid 5 diameter UL 181 Class 1 Air Duct 4 use LDK6 kit or equivalent Min 30 Max 12 0 6HH WDEOH IRU R VHWV H5 29 H6 34 1 2 H5 19 1 4 H6 25 1 2 Ceiling Min 1 clearance to combustibles...

Страница 89: ...2 0 Maximum allowable Horizontal Offset X offset for take off that s furthest away Ceiling LDK 1 LDK 3 or LDK 4 Min bend radius Top of fireplace Min 1 clearance to combustibles around pipes Support ho...

Страница 90: ...g bracket and 1 1 2 standoff mounting bracket and 1 2 standoff 3 1 2 standoff 3 5 8 7 7 8 11 1 2 Top View Front View Right Side View LDK 4 38 LDK 4 5 dia collars 4 C L 8 14 8 4 4 3 3 5 8 7 7 8 11 1 2...

Страница 91: ...6 9 1 2 6 4 1 2 wallboard mounting bracket and 1 1 2 standoff mounting bracket and 1 2 standoff Right Side View 6 1 2 3 Plenum Dimensions cont d LDK 3 14 C L 7 6 5 dia collars 2 3 mounting bracket an...

Страница 92: ...ensions 5 dia collars 4 C L 7 4 1 2 9 3 4 9 3 4 4 1 2 19 1 2 2 1 2 13 1 2 16 19 1 2 9 3 4 9 3 4 Stand offs fold down for shipping Warning Label Stand offs Front View Top View Right Side View Perimeter...

Страница 93: ...ngs LDK9 Minimum 31 4 Min 1 below QLVKHG FHLOLQJ LDK 1 49 LDK 4 39 LDK 1 LDK 4 LDK 3 LDK 3 15 4 5 LDK 1 13 LDK 4 11 UDPLQJ RQ HGJH Top of plenum VXSSRUW UDPLQJ RQ HGJH Min 1 below QLVKHG FHLOLQJ 8 C L...

Страница 94: ...te Min cavity dimensions may be dictated by LDK plenum when installing across corners Min 1 2 clearance to combustibles at ends See detail LDK 1 49 LDK 4 39 LDK 3 15 LDK 9 31 LDK 1 4 LDK 4 4 LDK 3 8 L...

Страница 95: ...intain 1 clearance to pipes Framing on edge 1 1 2 min clearance to combustibles top Ceiling Min 2 1 2 clearance to ceiling 1 2 1 2 min clearance to combustibles rear sides 1 min clearance to combustib...

Страница 96: ...s 2 x 4 on edge to support plates as necessary maintain 1 clearance to pipes DOO QLVK UHTXLUHG to form plenum above duct termination plates LDK 7 Duct Termination Plates 2 for horizontal installation...

Страница 97: ...2 19 1 2 16 13 1 2 4 4 Stand off Non combustible zone above plates Perimeter of plates may be trimmed to suit installation Combustible framing allowed below plates 5 dia pipes maintain 1 clearance to...

Страница 98: ...ppendix of fireplace installation manual Universal take off supplied with 1270RBK kit Can mount to either end of plenum Maximum 1 x 1270RBK kit per plenum NOTE DO NOT CONNECT 1270RBK directly to firep...

Страница 99: ...llation manual SDFNHG ZLWK DSSOLDQFH Combustible PDWHULDOV PXVW EH NHSW EHKLQG WKLV OLQH 45 NOTE 7KHVH 0DQWHO OHDUDQFHV DSSO 21 ZKHQ HDW6KLIW V VWHP LV LQVWDOOHG 0DQWHO HLJKW IURP Bottom of Unit 4 min...

Страница 100: ...edge of the replace opening 3 screws ba e for 1100 s 4 for 1400 s ba e Recycle this panel as it is no longer needed Convection ba e to be removed Convective airflow with baffle removed Take off colla...

Страница 101: ...ach of the collars and secure it with gear clamps provided DO NOT SPLICE DUCTS 5 Attach the top of the pipe sections to the plenum securing them with the gear clamps provided An upward slope must be m...

Страница 102: ...maintain the pipes posi tions Support horizontal sections every 24 inches 6 Continue with the replace installation 2 stand offs per plate Description Part no LDK1 48 Quad Hot Air Plenum Kit 48 x 2 qu...

Страница 103: ...rringbone Liners 1175HBL 64 Rear panel Valor Red Brick 4003264 Ledgestone 4003246 Description Part Number 1 Heat shield stand o s 4008934 2 Heat shield vent 4004460 3 45 degrees flanged elbow 0945JM 4...

Страница 104: ...80 Driftwood plaque LH rear 4008799 81 Driftwood plaque RH rear 4008800 82 Driftwood plaque LH front 4008801 83 Driftwood plaque RH front 4008802 84 Traditional Logs 1100LSK 85 Traditional Logs only...

Страница 105: ...31 32 33 34 36 37 17 18 24 25 29 25 26 28 51 52 53 54 43 44 45 46 47 48 50 49 38 39 40 41 42 55 56 59 60 1 2 3 4 5 5 16 16 6 7 7 8 8 9 9 10 10 13 13 12 11 20 21 23 19 15 15 14 14 22 a b c d e f g h i...

Страница 106: ...ch Logs 99 100 101 102 103 104 105 106 107 108 109 110 111 70 69 112 113 1100DWK Driftwood Kit 71 80 82 81 83 72 73 74 75 brown small grey white black beige 77 79 76 78 84 88 94 85 89 95 86 90 92 96 8...

Отзывы: