Valor APR-100810 Series Скачать руководство пользователя страница 5

Page 5 of 14 

GEN2-V1 10-ft Instructions (Generic) doc:r1 

 
 

If you decide its best to install a Header Board

, we recommend a 2x8” board of spruce or fir material, we do not 

recommend cedar unless you choose to lag through the header and into a solid surface such as brick, as this wood is 
too soft and may not hold fasteners as well as a harder wood.  
Be sure to add shims in the gaps behind the Header Board so it will continue to lay straight on the wall as its 
mounting bolts are tightened. 
You may choose to use pressure treated wood or clad the wood with aluminum or even paint it before mounting your 
awning. For your 

10ft. Awning

 which has a total actual width of 

122.30in. / 3106.4mm

, we recommend you cut your 

header board to 

122.00in./ 3098.8mm

, although your bracket will fit on a 10ft. (120

” )long board to ensure the product 

can be properly mounted. Before mounting your header board you will need to determine the location of the awning.  

Go to “Additional Material / Hardware Requirements” above for fastening options.

 

 
Non-Masonry Surface Installation: 

As the awning is quite heavy and the forces put on the product when opened requires it to be firmly secured to the 
structure. Therefore, for installation on any siding material we recommend a header board be installed. Wood lap 
siding may have the header board installed directly over the siding, provided is shimmed to be kept parallel to the 
wall, and it must be secured directly into the studs; wall sheathing alone is NOT adequate for securing the load.  

Go to 

“Additional Material / Hardware Requirements” above for fastening options.

 

 
Vinyl, Aluminum, or Steel Siding Installation: 

If you’re installing on Vinyl, Aluminum or Steel siding, or any unsupported material, we recommend that the siding be 
cut away, and a header board should be mounting to the studs, the siding can then be trimmed around the header 
boards and sealed with a caulking to ensure that it is water tight.  

Go to “Additional Material / Hardware Requirements” above for fastening options.

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
8.  
 
 
 
 
 
 
 
 
 
 
 

Содержание APR-100810 Series

Страница 1: ...ning section for all assembly and installation instructions set up adjustment and troubleshooting instructions There you will be able to see common problems and how to rectify them usually with a simp...

Страница 2: ...carbide masonry drill bit This will essentially use the header board to provide the level surface for the awning but will use the greater strength of the masonry wall for holding power You may contac...

Страница 3: ...ETRACTABLE AWNING SCHEMATIC DRAWING Size 8 ft Projection X 10 ft Width Diagram Exploded View 12 LEFT BRACKET ASSEMBLY 13 RIGHT BRACKET ASSEMBLY GEAR MECH ROLLER TUBE SUPPORT BRACKET ROLLER TUBE SUPPOR...

Страница 4: ...mbly 1 14 40x40x240mm Torsion Bar w plastic end caps 1 15 Wall Brackets w hardware 2 16 Extension Arm Shoulder Bracket w hardware 1 17 Extension Arm Pivot Mount w hardware 1 18 Wrist Pin Assembly w ha...

Страница 5: ...determine the location of the awning Go to Additional Material Hardware Requirements above for fastening options Non Masonry Surface Installation As the awning is quite heavy and the forces put on th...

Страница 6: ...m of 1 1 2 to 2 38 51mm of unobstructed clearance above this point 9 MOUNTING A HEADER BOARD The Awning Height reference is the upper most point of the Awning Fabric after installed The mounting brack...

Страница 7: ...rk this point on the center plumb line already marked Measure the 51 7in 1313mm from the horizontal centre line to the right a mark this point on the plumb line Header Board Vertical Centre Plumb Line...

Страница 8: ...nted to it from the LEFT WALL BRACKET ASSEMBLY 3 Remove the three Allen bolts that are securing the GEAR MECAHNISM TO the support bracket and move it to the opposite side of the ROLLER SUPPORT BRACKET...

Страница 9: ...e Vertical Centre Plumb Line Set the Intersection point labeled L over the Vertical Line and the Plumb line Align Plumb Line marked on the Wall or Header the Plumb Line on the Template Mark the Centre...

Страница 10: ...llapse and re insert in the hole Using a 5 8 wrench or adjustable wrench tighten each bolt until snug DO NOT OVERTIGHTEN THESE BOLTS On masonry if you find that each bracket is not laying flush on the...

Страница 11: ...r tube carefully slide the fabric into the channel be sure not to damage the fabric on the ends of the aluminum tube ends Centre the fabric on the Roller tube the fabric should be approximately 5cm sh...

Страница 12: ...n Arms Carefully open the box and find the LEFT and the RIGHT Extension Arm Each arm is Labeled LEFT and RIGHT and each or them indicates TOP meaning that top should face upwards when installing the p...

Страница 13: ...tch is set much different on each end it will be difficult to make other adjustments Ensure that the EXTENSION ARM PIVOT Bracket is mounted in the same hole on the LEFT and RIGHT Side Brackets Pivot a...

Страница 14: ...er direction as required within the channel on the bottom of the Valance Tube Be careful to ensure that you maintain even alignment of the end of the Valance Tube and the Roller Tube while making this...

Отзывы: