Valor APR-100810 Series Скачать руководство пользователя страница 11

Page 11 of 14 

GEN2-V1 10-ft Instructions (Generic) doc:r1 

 

 

11. ASSEMBLY OF ROLLER TUBE & FABRIC: 

Remove the two Roller tubes from the box 
(remove them from their protective plastic wrap), 
each will have open ends. Locate the Roller Tube 
Joiner, and the bag of 8-pcs #6 Philips screws. 
Insert the Joiner into the open end of one of the 
roller tubes, align the holes and insert four 
screws and tighten snug, 

DO NOT 

OVERTIGHTEN.

 

Insert the other Roller tube over the exposed end 
of the Roller Tube Joiner and using the remaining 
#6 Philips Head screws insert the screws and 
tighten snug, 

DO NOT OVERTIGHTEN. 

 

Now take the assembled Roller Tube and orient it such that the Square end of the tube is 
on the same side as your gear mechanism on the wall. 

 

Open the bag / box with your awning fabric, do not cut through the plastic or cardboard as 
you may cut the fabric. Open the fabric up and locate the open ends sewn into the fabric. 
Orient the fabric so the hem is facing down. Locate the 6mm diameter Plastic Spline and 
insert it through the open ends of the Fabric allowing it to hang out each end of the fabric 
evenly. Insert a Spline the same way on the other side of the fabric. With some assistance 
slide the Spline and the fabric into the channels from one end of the Roller tube, carefully 
slide the fabric into the channel, be sure not to damage the fabric on the ends of the 
aluminum tube ends. Centre the fabric on the Roller tube; the fabric should be 
approximately 5cm shorter than the roller tube on each end. Now with assistance rotate the 
roller tube evenly to roll the fabric around the tube over the top until 

it’s almost completely 

rolled around the tube.

  

 

12. ASSEMBLY OF VALANCE TUBE & FABRIC: 

Remove the two Valance tubes from the box (remove them 
from their protective plastic wrap), each will have open 
ends. Orient the tubes such that the drilled holes in the back 
of the Valance tubes are at the joint. Locate the Valance 
Tube Joiner and the bag of 4-pcs #6 Philips screws. Insert 
the Joiner into the open end of one of the Valance Tubes, 
align the holes and insert two screws and tighten snug, 

DO 

NOT OVERTIGHTEN.

  

Insert the other Valance Tube over the exposed end of the 
Valance Tube Joiner and using the remaining #6 Philips Head 
screws insert the screws and tighten snug, 

DO NOT 

OVERTIGHTEN. 

 
In the same manner as you install the fabric in the ROLLER TUBE, repeat 
this process to install the Awning Fabric in the Top Channel of the Valance 
tube as Shown in the photo to the right. 

 

 

Install the Fabric Valance 

Locate the Fabric Valance, and insert a 6mm plastic Spline in its open 
channel, as you did with the main fabric. Insert the Spline and fabric in the 
lower channel on the Valance tube as shown in the photo to the right. 

 

 

 
 
 
 
 
 
 
 
 
 
 

Содержание APR-100810 Series

Страница 1: ...ning section for all assembly and installation instructions set up adjustment and troubleshooting instructions There you will be able to see common problems and how to rectify them usually with a simp...

Страница 2: ...carbide masonry drill bit This will essentially use the header board to provide the level surface for the awning but will use the greater strength of the masonry wall for holding power You may contac...

Страница 3: ...ETRACTABLE AWNING SCHEMATIC DRAWING Size 8 ft Projection X 10 ft Width Diagram Exploded View 12 LEFT BRACKET ASSEMBLY 13 RIGHT BRACKET ASSEMBLY GEAR MECH ROLLER TUBE SUPPORT BRACKET ROLLER TUBE SUPPOR...

Страница 4: ...mbly 1 14 40x40x240mm Torsion Bar w plastic end caps 1 15 Wall Brackets w hardware 2 16 Extension Arm Shoulder Bracket w hardware 1 17 Extension Arm Pivot Mount w hardware 1 18 Wrist Pin Assembly w ha...

Страница 5: ...determine the location of the awning Go to Additional Material Hardware Requirements above for fastening options Non Masonry Surface Installation As the awning is quite heavy and the forces put on th...

Страница 6: ...m of 1 1 2 to 2 38 51mm of unobstructed clearance above this point 9 MOUNTING A HEADER BOARD The Awning Height reference is the upper most point of the Awning Fabric after installed The mounting brack...

Страница 7: ...rk this point on the center plumb line already marked Measure the 51 7in 1313mm from the horizontal centre line to the right a mark this point on the plumb line Header Board Vertical Centre Plumb Line...

Страница 8: ...nted to it from the LEFT WALL BRACKET ASSEMBLY 3 Remove the three Allen bolts that are securing the GEAR MECAHNISM TO the support bracket and move it to the opposite side of the ROLLER SUPPORT BRACKET...

Страница 9: ...e Vertical Centre Plumb Line Set the Intersection point labeled L over the Vertical Line and the Plumb line Align Plumb Line marked on the Wall or Header the Plumb Line on the Template Mark the Centre...

Страница 10: ...llapse and re insert in the hole Using a 5 8 wrench or adjustable wrench tighten each bolt until snug DO NOT OVERTIGHTEN THESE BOLTS On masonry if you find that each bracket is not laying flush on the...

Страница 11: ...r tube carefully slide the fabric into the channel be sure not to damage the fabric on the ends of the aluminum tube ends Centre the fabric on the Roller tube the fabric should be approximately 5cm sh...

Страница 12: ...n Arms Carefully open the box and find the LEFT and the RIGHT Extension Arm Each arm is Labeled LEFT and RIGHT and each or them indicates TOP meaning that top should face upwards when installing the p...

Страница 13: ...tch is set much different on each end it will be difficult to make other adjustments Ensure that the EXTENSION ARM PIVOT Bracket is mounted in the same hole on the LEFT and RIGHT Side Brackets Pivot a...

Страница 14: ...er direction as required within the channel on the bottom of the Valance Tube Be careful to ensure that you maintain even alignment of the end of the Valance Tube and the Roller Tube while making this...

Отзывы: