39
39
4. The underside of each ceramic rock is identi-
fi
ed by a number and a speci
fi
c protruding
positioning triangle.
Install the six rocks from left to right starting
with rock no. 1.
Note: The ceramic base may need to be slightly
adjusted side-to-side to allow stones to
fi
t within
the platform.
5. Place the glass panel in its cavity formed by the
Front Support and the Ceramic Platform.
6. Place the left twig across the
second and third rocks from the
left
; rest its end on the glass
near the edge of the platform as shown.
Make
sure to leave a gap between the twig and the
fi rst rock to allow fl ame to come up between
the twig and the rock.
7. Place the right twig across the
second and third rocks from the
right
; rest its end on the glass
about 1 cm from the edge of the
platform as shown.
Make sure to leave a gap
between the twig and the fi rst rock to allow
fl ame to come up between the twig and the
rock.
All Rocks Installed
Rock identi
fi
-
cation
Triangular
hole in ce-
ramic base
Installation
A black discoloration may form over time at
the front bottom of the 6-rock original fuel
bed; this deposit can be burned off by running
the
fi
replace on a low to medium setting
fi
re
for 30 to 45 minutes. This discoloration is
unavoidable and will re-form again.
QUALIFIED
INSTALLER
Содержание 650JN
Страница 45: ...45 45 Wiring Diagram Wall Switch Kit Connector GV60 Wiring Diagram QUALIFIED INSTALLER...
Страница 52: ......