![Valor 530 Direct Vent Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/valor/530-direct-vent/530-direct-vent_installation-manual_3387418023.webp)
Manufactured by Miles Industries Ltd., British Columbia, Canada
22
8.
APPLIANCE PREPARATION
8.1.
Detach the window
1. Release the top of the window by pulling forward and rotating
outwards the two bars at the top corners. See figure 35.
Figure 35
2. Unscrew the two spring loaded bolts securing the bottom of the
window. See figure 35.
3.
Carefully lift the window. Keep the window and bolts in a safe place.
8.2.
Check ignition spark
The pilot burner and electrode unit is at the left end of the burner.
Push in the lighting knob and turn counter-clockwise through the “IGN”
position to “PILOT”. A spark should flash across from the pilot electrode
to the pilot burner shield. see figure 36.
Figure 36
8.3.
Check flame control motor
1. Fit the four batteries into the battery box (Which is attached to the
switch wires).
2. Temporarily connect the
black
connector pad to the control unit –
See figure 37.
Figure 37
3.
Operate the switch. This should cause the flame control knob to rotate
counter-clockwise. See figure 37.
4.
Disconnect and remove after checking.