Valor 1500INO (NG) Скачать руководство пользователя страница 35

35

Section Views

Window frame

Bottom railing

Remove Window

The window is held in place by a spring-loaded lever on 
each side. 
1.  To remove the window, locate the levers on each 

side of the window towards the top. Using your 

fi

 nger, pull the lever towards you and unhook it from 

the window frame bracket.

2.  Gently pull the top of the window outward.
3.  Lift the window out of its bottom railing and set it 

aside in a safe place to avoid damage.

Installation

 Cracking wall 

fi

 nishes

If a clean 

fi

 nish with no tile, etc. is desired, joints in 

the cement board and the transition to gypsum board 
will require special attention if future cracking is to be 
controlled. Be aware that temperatures on the non-
combustible wall surface above the appliance can 
exceed 250°F. 
Below are some tips on how to best avoid any cracking:
•  Allow materials to dry thoroughly before 

fi

 nishing 

the wall. Cement board has the ability to absorb up 
to 30 percent of its weight in water and may shrink 
as much as 1/8” over a 48” length when drying from 
a saturated condition. Running the 

fi

 replace before 

fi

 nal 

fi

 nishing will help drive out moisture.

•  Always pre-drill screw holes through cement board 

and use screws with self-milling head.

•  Always use tape over joints.
•  Behind joints, double up studs or use studs “on the 

fl

 at” to add extra support to the joint. Adhesive on 

the backside of wall board behind any joints can 
help control differential movement.

•  Use multiple, thinner coats of joint compound and 

allow to dry thoroughly between coats.

•  Ensure framing materials are dry.
• After 

fi

 nishing the wall, introduce heat gradually to 

slowly dry any excess moisture rather than drying 
too fast.

•  Avoid notching cement board or tiles around corners 

of window opening and instead provide a joint that 
intersects the corner.

QUALIFIED 
INSTALLER

Содержание 1500INO (NG)

Страница 1: ...the type of gas indicated on the rating plate This appliance is not convertible for use with other gases unless a certified kit is used HOT GLASS WILL CAUSE BURNS DO NOT TOUCH GLASS UNTIL COOLED NEVER...

Страница 2: ...our Fireplace 9 Operating Your Fireplace 9 How to Turn Your Fireplace OFF including pilot 10 How to Ensure Your Fireplace Cannot Be Turned ON Inadvertently 10 Decommission During Off Season 11 Options...

Страница 3: ...BE PLACED on or near the appliance This unit MUST be used with a vent system as described in this installation manual NO OTHER vent system or components MAY BE USED This gas fireplace and vent assemb...

Страница 4: ...esponse reflexes to withdraw in the event of accidental contact with a hot surface A physical barrier is strongly recommended if there are young children or at risk individuals in the house Install an...

Страница 5: ...r new radiant gas heater is a technical appliance that must be installed by a qualified dealer Each Valor fireplace is fully tested during the production process for your safety and comfort Your unit...

Страница 6: ...ed under warranty Clean the glass regularly as soon as you notice the buildup white film If the film is left for a longer period of time it will etch into the glass It is then much harder if not impos...

Страница 7: ...rom the burner using a soft brush after removing the ceramic logs When cleaning make sure that no par ticles are brushed into the slots of the burner To refit the window 1 Place the window in its bott...

Страница 8: ...for its battery box Batteries should last one to two seasons depending on usage Removing the batteries in the off season will extend the battery life Owner s Information 5 If the Hot Glass Warning pla...

Страница 9: ...ote the part number and description when requesting spare parts Operating Your Fireplace Your fireplace is controlled by the Wall Switch The Wall Switch can be used to turn on off and to increase or d...

Страница 10: ...the two following methods to ensure that your fireplace will not turn on when you don t want it on First ensure your fireplace is turned off including the pilot and cold BEFORE going ahead Turn the di...

Страница 11: ...Gate Hearth gates such as Cardinal s VersaGates are available at retail stores carrying safety products for children Information accurate at the time of printing and subject to change without notice...

Страница 12: ...then smell for gas including near the floor If you smell gas STOP Follow B in the safety information above on this label If you don t smell gas go to the next step 3 AUTOMATIC IGNITION MAN knob 2 in O...

Страница 13: ...d a battery operated carbon monoxide detector with an alarm shall be installed 2 APPROVED CARBON MONOXIDE DETECTORS Each carbon monoxide detector as required in accordance with the above provisions sh...

Страница 14: ...ded with the appliance or equipment installation instructions and 2 The special venting systems shall be Product Approved by the Board and the instructions for that system shall include a parts list a...

Страница 15: ...trained personnel should install this appliance This appliance must be electrically grounded in accordance with local codes or in the absence of local codes with the National Electrical Code ANSI NFP...

Страница 16: ...i i ini i i ish h h Any y wall finishes applied ove er cement board must be non combustible Combustible mantel are ok provided they conform to chart s ee p p 20 Combustible Framing Allowed Beneath Fi...

Страница 17: ...lications 46 1168 mm 18 457 mm 15 1 16 383 mm 15 1 16 15 3 mm 383 18 1 2 469 mm 3 3 4 95 mm 4 102 mm 19 7 8 505 mm 32 3 8 822 mm 33 1 8 841 mm 14 1 2 369 mm 9 3 8 238 mm 42 1067 mm 39 11 16 1009 mm Ze...

Страница 18: ...er membrane The fireplace must be permanently situated and connected to a fixed piping system it is not portable Weather Protection Moisture Resistance This outdoor fireplace will tolerate moderate am...

Страница 19: ...eatherproof enclosure Continuous insulated building envelope and weatherproof membrane is NOT interrupted by fireplace installation INSIDE INSIDE OUTSIDE Min weatherproof overhang in front and at side...

Страница 20: ...oof overhang Allowable combustible projection Combustible Mantel Projection from Face of Cement Board Combustible Mantel Height from Bottom of appliance Fireplace Opening Combustible Ceiling 60 Min to...

Страница 21: ...21 39 11 16 Fireplace Opening Wall Min 4 to wall or combustible mantel leg Face of Finished Wall FIREPLACE Combustible Sidewall Mantel Leg Top View Mantel Hearth Clearances QUALIFIED INSTALLER...

Страница 22: ...LEMENT CONSULTEZ LE GUIDE D INSTALLATION NON COMBUSTIBLE MATERIALS ONLY READ I READ INSTRUC NSTRUCTIONS TIONS MAT RI MAT RIAUX IN AUX INCOMBUS COMBUSTIBLES TIBLES SEULE SEULEMENT MENT CONSUL CONSULTEZ...

Страница 23: ...ox 10 3 4 274 mm from back surface of wall finish to front surface of appliance case w no vent offset 15 1 16 383 mm 14 1 2 369 mm 9 3 8 238 mm 19 1 4 489 mm Fireplace Opening PARTIAL SHELF top outlet...

Страница 24: ...al pipe is used otherwise elbow requires 3 77 mm top clearance Approx 10 3 4 274 mm from back surface of wall finish to front surface of appliance case w no vent offset 15 1 16 383 mm 14 1 2 369 mm 9...

Страница 25: ...case For venting clearances see Venting Chart section 43 1093 mm to underside of combustible cavity 14 1 2 369 mm 9 3 8 238 mm 19 1 4 489 mm Fireplace opening FULL SHELF rear outlet 1 2 thick non com...

Страница 26: ...pe allowed for the particular installation Framing Vent in Combustible Walls Ceilings When penetrating through combustible walls and ceilings frame a minimum of 10 in x 10 in opening and ensure that t...

Страница 27: ...PIECE WALL THIMBLE PIPE LENGTH PIPE LENGTH PIPE LENGTH PIPE LENGTH 90 ELBOW CEILING FIRESTOP ATTIC FIRESTOP ATTIC INSULATION SHIELD FLASHING STORM COLLAR VERTICAL TERMINATION Co axial Venting Typical...

Страница 28: ...within the allowable limits shown on the chart below 4 A maximum of 4 x 90 degrees elbows or equivalent 2 x 45 degrees 90 degrees can be used Excludes the 45 degrees take off elbow shipped with the a...

Страница 29: ...no vertical rise The level of restriction required depends on the vertical rise in the venting system and to a lesser degree the horizontal run and number of elbows The amount of restriction is based...

Страница 30: ...inimum of 2 sides beneath the floor 12 30 Note Local codes and regulations may require different clearances Co axial Venting This direct vent appliance is designed to operate when an undisturbed airfl...

Страница 31: ...o 11 12 3 25 Over 11 12 to 12 12 4 Over 12 12 to 14 12 5 Overhang should not extend beyond vent if within 48 of termination cap Horizontal overhang Vertical wall Min 24 unvented soffit Min 36 vented s...

Страница 32: ...ype of the wall finish around the firebox opening What accessories trim etc will be installed with this fireplace The venting configuration 2 Unpack the appliance removing all items packed inside and...

Страница 33: ...indicated 1 Remove the top outlet collar 6 screws 2 Swivel the collar and install as a rear outlet 6 screws 3 Reinstall the heat shield to the top of the appliance case 3 screws Fit Appliance into Fra...

Страница 34: ...r fireplace requires a 1 2 13 mm thick non combustible cement board to be used as a wall surface immediately surrounding the unit on each side see diagram for minimum coverage Extending the cement boa...

Страница 35: ...any cracking Allow materials to dry thoroughly before finishing the wall Cement board has the ability to absorb up to 30 percent of its weight in water and may shrink as much as 1 8 over a 48 length w...

Страница 36: ...ng its individual manual shut off valve during any pressure testing of the gas supply pip ing system at test pressures equal to or less than 1 2 psig 3 5 kPa Failure to either disconnect or isolate th...

Страница 37: ...rebox The panel sits on the ledge behind the tabs 4 Place the left panel against the left wall of the firebox 5 Place the right panel against the right wall of the firebox 6 Tighten the side panel anc...

Страница 38: ...ssible to maximize the air gap behind the burner 2 Fill a small container with the equivalent of approximately 3 cups 750 ml of vermiculite from the bag supplied 3 Carefully spread the vermiculite on...

Страница 39: ...log Place the log s left peg in the front hole for natural gas NG fire Place the log s left peg in the rear hole for propane gas LPG fires 2 Place the rear left log as indicated NG NG LPG LPG 3 Place...

Страница 40: ...ed Murano Glass Fire Kit which contains 1 bag of blue azura fireglass 1 bag of black fireglass 1 glass platform Installation Carefully unpack the kit 1 Install the steel platform around the burner as...

Страница 41: ...air gap behind the burner 3 Mix the black and blue fireglass together 4 Fill a small container with approximately 3 cups 750 ml of mixed fireglass 5 Carefully spread the fireglass on the surface of bu...

Страница 42: ...an Fireglass or firegear The use of any other fireglass products may void your fireplace warranty Installation Carefully unpack the kit 1 Install both platform brackets in front of and behind the burn...

Страница 43: ...three rocks on the burner one at each end and one in the middle as indicated The rocks should not sit on top of the burner ports but can overhang slightly Note Although these rocks can be installed af...

Страница 44: ...rhang slightly over the burner edge 4 Add the twigs to the rocks placing them as shown Note The position of the twigs are specific to obtain the best flame pattern Note The acceptable variations are o...

Страница 45: ...of the window and release it to insure the springs return it Also double check that the bottom of the window frame is correctly installed in its the bottom railing Failure to install window correctly...

Страница 46: ...an electrical outlet box or mud ring as required not supplied to house the switch controls Fasten the wiring to framing using insulated staples not supplied 2 Thread the switch wire through an access...

Страница 47: ...attery box 11 Reconnect the battery box and place it back in its po sition to the right at the bottom of the appliance case 12 Test the operation of the wall switch see page 9 13 Fix the wall cover pl...

Страница 48: ...for 10 15 minutes to evaluate the flame picture The burner is equipped with an adjustable shutter to control primary aeration NG only The shutter is factory set to an aeration gap which will give opti...

Страница 49: ...49 Wiring Diagram Wall Switch Kit Connector GV60 Wiring Diagram Remote Battery Box 4 AA Batteries QUALIFIED INSTALLER...

Страница 50: ...4DT ST14 TM 4ST14 4D14S 94040614 Snorkel 36 Rise 46DVA SNK36 4DT ST36 TM 4ST36 4D36S 94040636 Adjustable Pipe Length 4 x 6 5 8 4 to 10 Galvanized 4DT ADJ 4D7A or 4D7AB 3 to 5 94610608 4 to 8 1 2 Blac...

Страница 51: ...6012 Roof Flashing 7 12 12 12 46DVA F12 4DT AF12 TF 4FB SV4B 4DF12 6 12 12 12 949606712 Flat Roof Flashing 46DVA FF TF 4F SV4F 559FSK 949606001 Masonry Flashing TF 4MF Various Venting System Parts Wal...

Страница 52: ...tal conditions ii Inadequate ventilation in the area or competition for air from other household equipment or appliances iii Damage due to chemicals dampness condensation or sulphur in the fuel supply...

Страница 53: ...3000399 34 Pilot sealing plate 4002910 35 Valve to elbow pipe assembly 4002904 36a GV60 valve assembly NG 4003106 36b GV60 valve assembly LPG 4003118 37 Thermocouple interrupter 4001037 38 Pipe s s fl...

Страница 54: ...828 79 Grey Rock S4 A 6 4002338 80 Dark Grey Rock S4 A 4 4002339 81 Grey Rock S4 B 4 4002340 82 Dark Grey Rock S4 B 6 4002341 83 No 7 Grey 5 Matte pitted rock 4002650 84 No 9 Grey 5 Matte rock 2 40026...

Страница 55: ...55 Spare Parts 1 2 3 4 7 9 10 11 8 52 50 49 51 12 13 14a 14b 48 15 17 18 19 23 24 25 26 27a 27b 28 29 30 31 32 33 34 36a 36b 35 38 37 6 5 41 42 47 45 46 43 44 74 OWNER S INFORMATION...

Страница 56: ......

Страница 57: ...ion provided will be used for customer records only Online Warranty registration at www valorfireplaces com Cut out page fill information and mail to Miles Industries Ltd Fireplace Information Model N...

Страница 58: ...hut Thank you for choosing a Valor Product Postage needed Miles Industries Ltd 190 2255 Dollarton Highway North Vancouver BC V7H 3B1 Canada Fold here Online Warranty registration at www valorfireplace...

Отзывы: