7.12   Installation Sequence

The  following  written  instructions  should  be  read  in 
conjunction with Valmont Highway’s drawings.

A  generic  Safe Work  Method  Statement  is  available  from 
Valmont  Highway  to  assist  in  the  safe  installation  of  Ezy-
Guard HC.

Only items purchased from Valmont Highway shall be used 
for the construction of Ezy-Guard HC.
1.   Ensure  the  area  has  been  inspected  for  underground 

hazards and that suitable traffic control is in place. 

2.   Post  locations  are  marked  ensuring  any  fixed  object 

hazard to be protected is located outside the expected 
dynamic deflection of the barrier.

3.   The post in relation to the direction of traffic is orientated 

as per Figure 10 and 11.

4.   Posts  are  driven  directly  into  the  ground  and  should 

be  vertical.  The  post  installation  process  shall  not 
cause  damage  to  the  post,  such  that  it  reduces  the 
effective  operation  of  the  safety  barrier  or  its  design 
life, or introduces sharp tearing edges, nor shall it cause 
damage  to  pavement.  If  the  Ezy-HC-Carriage  cannot 
freely  move  as  it  is  attached  to  the  post  as  a    result 
of  deformation  of  the  post  during  installation,  then 
the post shall be replaced.  The use of a vibrating post 
hammer will reduce deformation to the top of the post 
and install the post at a controlled rate.

5.  Alternate to driving the posts, a minimum 200-300mm 

hole can be augured and the post placed in the hole. 
The  posthole  is  then  backfilled  with  the  material  that 
was excavated. If installing in soil, the material should 
be placed in layers of 150mm and suitably compacted to 
not less than the density of the surrounding layers.

6.   Posts are spaced at 2m – 1,905mm spacings are required 

on  transitions  to  w-beam  -  and  reduced  spacings  are 
required where requested by engineer.

7.   The height of the Z-post above ground level is 970mm.

8.   The Ezy-HC-Carriage is attached to the face of the post. 

The Ezy-HC-Carriage will come to rest on the positioning 
lug fabricated on the Z-post.

Figure 10: Z-Post Orientation

Figure 11: Ezy-Carriage Orientation

Figure 12: Attachment of Carriage to Z-Post

TRAFFIC FLOW

Carriage resting 
on lugs

TRAFFIC FLOW

Содержание Ezy-Guard HC

Страница 1: ...HIGHWAY High Containment Roadside Safety Barrier Product Manual EZY GUARD HC High Containment Roadside Safety Barrrier www valmonthighway com MASHTL4 COMPLIANT MASHTL3 COMPLIANT Release 08 21...

Страница 2: ...and rail stiffening plates This unique connection provides a soft ride down for the occupants and smooth vehicle containment and redirection 2 0 Specifications Ezy Guard HC Z Post Length 2 000mm Ezy G...

Страница 3: ...parture Transition Rail 1905mm 10001811 W Beam 4000mm NLL 10000977 Thriebeam 4000mm NLL 10000837 Ezy Guard HC Post 2000mm 10005540 Ezy Guard 4 Post 1650mm 10007390 HD Carriage 10004116 Smart Carriage...

Страница 4: ...In the revised standard AS NZS 3845 1 2015 MASH has been nominated as the basis of testing procedures for road safety barrier systems The MASH TL4 crash test matrix requires the following impacts 1 10...

Страница 5: ...ts The Z posts are designed to yield by bending near ground level This bending action absorbs impact energy reducing the potential for post fracturing A fractured or split guardrail post presents a si...

Страница 6: ...design uses fewer components and features 2 000mm Z posts that are rapidly driven into the ground The Z post embedment depth is just 1 030mm a significant reduction when compared to other Thrie beam...

Страница 7: ...s than the public domain guardrail systems Z posts weighing just 19 5kg are lighter than traditional Thrie beam C posts The lightweight Z post reduces manual lifting by installation crews The rounded...

Страница 8: ...nd working widths for the MASH TL4 10 000kg truck with various post spacings 6 2 Slopes The maximum cross fall for an installation of Ezy Guard HC is 10H 1V 10 Proximity to a batter slope will depend...

Страница 9: ...350 terminal refer to installation drawings Terminals should be installed in accordance with the proprietor s drawings and specifications Z posts are not to be used in the terminals unless approved b...

Страница 10: ...unless verified by Valmont Highway Flame cutting of rails or posts is not permitted Saw cutting and drilling is permitted in the event that a post is to be installed at an irregular spacing and or ro...

Страница 11: ...gh bending near ground level This means that typical recommendations for the installation of a traditional guardrail post in rock are not applicable to the Z post When rock is encountered the installa...

Страница 12: ...ter hole to a depth of 500mm install the post in the hole and backfill Rock is encountered within 450mm of the surface Drill a 160 300mm diameter hole 500mm into the rock or to a minimum total post em...

Страница 13: ...0mm into the rock or to a minimum total post embedment depth of 700mm whichever comes first install the post and backfill Rock is encountered 650mm to 1000mm below ground Drill a 160 300mm diameter ho...

Страница 14: ...4m to 45m Convex Ezy Guard HC for Concave Curves can be used from 2 4m to 45m Curves in excess of 45m do not require shop curving as the rail can be field installed to suit Guardrail may be curved ei...

Страница 15: ...uces sharp tearing edges nor shall it cause damage to pavement If the Ezy HC Carriage cannot freely move as it is attached to the post as a result of deformation of the post during installation then t...

Страница 16: ...pavement or material around a post shall be left dense tight and smooth so that resistance to water penetration is similar to that of the adjacent surface 7 13 Installation Tolerances The tolerance on...

Страница 17: ...side Safety Barrier 17 HIGHWAY Figure 16 Ezy Guard HC Installation Tolerances Plan View Side View Front View 20mm 20mm Height 20mm 25mm post spacing tolerance measured at top of post 20mm lateral tole...

Страница 18: ...transition rails then anchored with approved terminals Yes No Are the cables in the terminals tensioned to their nominated torque taut Yes No Has any minor damage been repaired using two coats of an...

Страница 19: ...actors such as flame duration and intensity Typical bushfire conditions may expose steel structures to an air temperature of 800 C for periods of up to 120 seconds however zinc coatings are generally...

Страница 20: ...Release 08 21 20 HIGHWAY...

Страница 21: ...Release 08 21 21 HIGHWAY...

Страница 22: ...DATE CHECKED ISSUE FOR C I V I L P R O D U C T S COMPANY valmont A EZY GUARD HIGH CONTAINMENT TRANSITION DETAIL EZY GUARD HC TO 790MM W BEAM EZY HC 002 0 N T S A3 J SALES MARKETING DRAWINGS EZY GUARD...

Страница 23: ...Release 08 21 23 HIGHWAY...

Страница 24: ...Release 08 21 24 HIGHWAY...

Страница 25: ...nt Level Deflection Permanent Deflection Ezy Guard HC MASH TL4 1 77m 1 30m MASH TL3 1 16m 0 70m NCHRP 350 TL4 1 0m 0 60m APPROVED DRAWN SCALE Rev NAME DATE CHECKED ISSUE FOR INFORMATION ONLY C I V I L...

Страница 26: ...E CHECKED ISSUE FOR C I V I L P R O D U C T S COMPANY valmont A EZY GUARD HIGH CONTAINMENT POST ON BASE PLATE ASSEMBLY DETAIL EXPLODED VIEW EZY HC 005 0 N T S A3 J SALES MARKETING DRAWINGS EZY GUARD H...

Страница 27: ...COMPANY valmont A EZY GUARD HIGH CONTAINMENT POST ON BASE PLATE CONFIGURATION DETAIL EZY HC 006 1 N T S A3 04 10 2016 MC LG 04 10 2016 LG 04 10 2016 J SALES MARKETING DRAWINGS EZY GUARD HC EZY HC 006...

Страница 28: ...HIGHWAY 57 65 Airds Road Minto NSW 2566 Ph 612 9827 3353 info valmonthighway com www valmonthighway com www valmonthighway com Design and Development of Highway Safety Innovations...

Отзывы: