Installation manual 

 

 
 

 

Floor boards should be fixed to every foundation bearer with nails 2,5x50 mm.  For nicer finish we 
suggest to nail the boards from top part of the tongue so the head of the nail will be covered with 
groove of next board. 
 

The final operation is the fitting of the floor beadings to cover the spaces between the floor boards and 
walls. If necessary, cut the floor beadings to the suitable length.  

 

ATTENTION

: Depending on the climate at the house location, the floor boards can either swell or 

diminish. If the floor boards are very dry while the climate is damp, they will easily absorb moisture. In 
this case, the floor boards should not be attached very densely to avoid likely bulging. Leave some 
space (1-2 mm) between the floor boards to allow for swelling. But if your climate is warm and dry, you 
can install the boards densely because they will become drier and spaces may appear between them.  

 

 

 

Walls 

When installing the walls, it is important to remember that: 

¾

  The logs are always assembled with their tongue upwards! 

¾

  If necessary, use the hitting block and hammer! Never directly hit the tongue with the hammer! 

Install the walls in accordance with the appended wall plans (see Technical specifications). 

First of all place half logs of front and back wall at the 
correct location and attach them with screws to the 
foundation joists. Then install the side wall logs. Make sure 
that the first layer of logs extends a bit over the foundation 
joists: the logs must extend over the joists by some 3-5 mm. 
You will thus protect the house from moisture, allowing the 
free flow of rainwater into the ground.  

 

ATTENTION

After the first layer of logs, measure the 

diagonal lengths and, if necessary, re-install the logs. Only if 
the diagonal lengths are completely equal is the base frame 
rectangular and you can mutually attach the logs.  

         

 

            The first layer of logs: 

 

 

Continue the installation of the walls by strongly forcing the wall logs into one another. If necessary, 
use the hitting block and hammer. At the same time, do not forget to begin the installation of the door 
and windows. You should definitely begin the door installation after the 5

th

-6

th

 layer of logs. 

 

 

Содержание IOWA

Страница 1: ...ations techniques au produit Il produttore mantiene il diritto di apportare modifiche tecniche al prodotto Reservado el derecho a modificaciones t cnicas Produsent forbeholder seg retten til endre tek...

Страница 2: ...f the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pai...

Страница 3: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Страница 4: ...der the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs Cast concrete bed Prepare the foundation so that t...

Страница 5: ...CE To ensure protection from wind and storm it is recommended to attach the foundation joists to the foundation for this you can use for instance metal angles anchors etc The corresponding materials a...

Страница 6: ...logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall p...

Страница 7: ...he wall logs until you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the...

Страница 8: ...ll log Now place the details pos 167 and fixate from the top with 4 5x90 mm screws and from the bottom with 4 5x70 mm screw Follow the distances shown on the drawing Install the connecting pieces acco...

Страница 9: ...d adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do no...

Страница 10: ...na las tablas entre uno y otro Deja un intervalo de ca 1mm entre las tablas para que puedan dilatar Despu s de la instalaci n de las tablas de tejado c brelos con la cubierta de tejado no incluido Es...

Страница 11: ...la instalaci n del edificio hay que ajustar las fijaciones para que los elementos de la pared puedan asentarse hacia abajo tambi n Instalaci n de los tableros de acceso Recomendaciones generales Probl...

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ......

Отзывы: