
IP BOLD
- installation and operating instructions
45
Security code for output
– relay output is close/open in default. This static
status is dangerous in case of unauthorised enter for example by
door entry demaged and short circuit wires of power supply and
electrical lock. Defence is using module COSW which you connect to
electrical lock wires
– closest to electrical lock. For relay closing is
sends in such connection pulses set and when setup code at COSW
match with code of this parametr relay is closed.
Caution
–
do not fill code when electrical lock without COSW is
connected. It can demage relay in door entry IP BOLD!
Button for closing
– when you fill up button number then this number will work
as
departure button
only. Eventually might be used relay output for
control of mechanical bell. During button press is relay activated in
monostable mode for closing time.
Command for external relay
– close
– Enable setup command sends to
external device (for example WEB relay) during relay closing.
Command is sending by protokol HTTP (GET request). The
command must be in format http://ip_adresa/cesta. For example
http://192.168.1.249/relay1=on
.
Command for external relay
– open
– Enable setup command sends to
external device (for example WEB relay) during relay opening.
Command is sending by protocol HTTP (GET request).
The command must be in format http://ip_adresa/cesta.For example
http://192.168.1.249/relay1=off
Codes for relay control
– her eis 10 basic central codes for relay. Moreover
every subscriber in phone book
has his own priváte cod efor relay
control ( code keylock from buttons). Those 10 codes might be
assigned as codes from buttons (code keylock) or by phone (DTMF).
Further is possible assign feature relay closing/opening (ON/OFF).
The Code validity is discriminated by time according selected time
plan.
Содержание IP bold series
Страница 2: ......
Страница 9: ...IP BOLD installation and operating instructions 9 IP BOLD TK1C IP BOLD TK4C...
Страница 12: ...IP BOLD installation and operating instructions 12...
Страница 14: ...IP BOLD installation and operating instructions 14 Possibilities of relays connection are at following pictures...
Страница 15: ...IP BOLD installation and operating instructions 15...
Страница 19: ...IP BOLD installation and operating instructions 19 1 5 2 Montage dimension...
Страница 77: ......
Страница 79: ...Alphatech spol s r o 2014 2015 version V1 2...