background image

Ordered separately:

• Service cable kit

Needed configuration depends on your 

system. Follow the instructions on the next 

page or see 

AQT530 Configuration Guide

 

for more information about the available 

commands.

AQT530 needs regular maintenance and 

typical maintenance interval is 2 years. For 

more information about maintenance, see 

AQT530 Maintenance Guide

.

Find guides online:

www.vaisala.com/aqt530

Other needed tools and equipment:

• Power supply unit

  Output voltage: 10 ... 25 V DC

  Minimum 8 W

• Terminal block 

• Weatherproof enclosure

• Electrician screwdriver

• 5 mm Allen key

In pole mast installation:

• 7 mm socket wrench or            

  slotted screwdriver

• 10 mm wrench

In sensor support arm installation:

• Two M6x19 mm screws and washers

In wall installation:

• Two screws and wall plugs suitable for   

  the wall material

• Drilling tools

In product package: 

  

• Air quality transmitter AQT530  

• Open-ended M12 cable

• Mounting bracket with two steel bands

 

Save the container and the  

 

 

packaging materials for future    

 

transportation or shipping.

Needed for setup

Configuration and maintenance

If AQT530 is installed to Vaisala Beacon 

Station BWS500, follow the instructions 

in 

BWS500 Setup Guide for Mast 

Installation

.

Find guide online:

www.vaisala.com/bws500-support

Installing AQT530 to BWS500

Отзывы: