Ordered separately:
• Service cable kit
Needed configuration depends on your
system. Follow the instructions on the next
page or see
AQT530 Configuration Guide
for more information about the available
commands.
AQT530 needs regular maintenance and
typical maintenance interval is 2 years. For
more information about maintenance, see
AQT530 Maintenance Guide
.
Find guides online:
www.vaisala.com/aqt530
Other needed tools and equipment:
• Power supply unit
Output voltage: 10 ... 25 V DC
Minimum 8 W
• Terminal block
• Weatherproof enclosure
• Electrician screwdriver
• 5 mm Allen key
In pole mast installation:
• 7 mm socket wrench or
slotted screwdriver
• 10 mm wrench
In sensor support arm installation:
• Two M6x19 mm screws and washers
In wall installation:
• Two screws and wall plugs suitable for
the wall material
• Drilling tools
In product package:
• Air quality transmitter AQT530
• Open-ended M12 cable
• Mounting bracket with two steel bands
Save the container and the
packaging materials for future
transportation or shipping.
Needed for setup
Configuration and maintenance
If AQT530 is installed to Vaisala Beacon
Station BWS500, follow the instructions
in
BWS500 Setup Guide for Mast
Installation
.
Find guide online:
www.vaisala.com/bws500-support
Installing AQT530 to BWS500