0020244064_02 Operating and installation instructions
9
3.
Install the three enclosed feet at the bottom of the cyl-
inder.
4.
Use the adjustable feet and a spirit level to align the
product.
5
Installation
5.1
Hydraulics installation
5.1.1
Water-side connection
Caution.
Risk of material damage caused by
residues in the pipelines.
Welding remnants, sealing residues, dirt or
other residues in the pipelines may damage
the product.
▶
Flush the heating installation thoroughly
before installing the product.
Caution.
Risk of damage caused by heat transfer
when soldering.
The heat that is transferred during solder-
ing may lead to damage to the expanded
polypropylene around the product and to the
seals on the connectors.
▶
Protect the product's insulating casing.
▶
Do not solder the connectors if these have
been screwed onto the product.
Caution.
Risk of material damage caused by corro-
sion
Due to non-diffusion-tight plastic pipes in the
heating installation, air gets into the heating
water. Air in the heating water causes corro-
sion in the heat generator circuit and in the
product.
▶
If you use non-diffusion-tight plastic pipes
in the heating installation, ensure that no
air gets into the heat generator circuit.
1.
Attach a draining cock at the lowest point in the install-
ation.
2.
Depending on your installation, connect the circuits in
accordance with the basic diagrams shown below.
Validity:
VPS R 200/1 B
1
▶
Connect a draining cock to the drain connection on the
cylinder.
▶
If you do not connect a draining cock, attach the drain
plug
(1)
in order to guarantee the leak-tightness of the
cylinder.
5.1.2
Basic hydraulic connection diagram
5.1.2.1 Case no. 1
2
1
2
1
3
4
4
3
1
Heat pump
2
Boiler
3
Heating circuit
4
Plug
Содержание VPS R 100/1 M
Страница 2: ...2 en Operating and installation instructions 3 en Country specifics 14...
Страница 18: ......
Страница 19: ......