Operating instructions for uniSTOR 0020111106_00
5
2.2
Intended use
Vaillant cylinders are constructed using state-of-the-art
technology in accordance with recognised safety regula-
tions.
Nevertheless, there is still a risk of injury or danger of
death to the operator or others or of damage to the unit
and other property in the event of improper use or use
for which the unit is not intended.
Vaillant cylinders are not intended for use by persons
(including children) with physical, sensory or mental
impairments or who have inadequate experience and/or
knowledge, unless they are supervised by a person
responsible for their safety or have been given instruc-
tions by this person regarding the operation of the unit.
Children must be supervised to ensure that they do not
play with the unit.
Vaillant uniSTOR VIH GB 120/2 S, VIH GB 155/2 S,
VIH GB 180/2 S, VIH GB 210/2 S, VIH GB 260/2 S, and
VIH GB 310/2 S domestic hot water cylinders are
unvented, indirectly heated domestic hot water cylinders
designed for use with gas-fired wall-hung boilers as per
GB standards for hot water supply systems. The cylin-
ders work with the pressure of the water supply line and
do not need a cold water tank for their supply.
They are exclusively for the provision of hot potable
water to a temperature of 80°C and must be used only
for this purpose. The cylinders can be used in combina-
tion with a downstream gas-fired wall-hung boiler for
hot water production in accordance with GB standards.
Any other use or extended use is considered to be
improper.
The manufacturer/supplier is not liable for any claims
or damage resulting from improper use. The user alone
bears the risk.
Complying with the intended use of the unit also
includes observing the operating and installation
instructions and all other applicable documents and
adhering to the inspection and servicing conditions.
Improper use of any kind is prohibited!
2.3 Basic
safety instructions
Installation, commissioning, and maintenance
Installation and adjustment as well as service, mainte-
nance and repair must be carried out by a competent
person approved at the time by the Health and Safety
Executive and be in accordance with the relevant
requirements of the Local Authority, Building Regula-
tions, Building Regulations (Scotland), Building Regula-
tions (Northern Ireland), and the bye-laws of the local
Water Undertaking.
Cylinder safety information
This product has been assessed and found to comply
with the requirements of the Building Regulations for
unvented hot water storage systems and must not be
altered or modified in any way.
>
In the event of parts replacement, use only genuine
spare parts supplied by Vaillant Ltd.
>
You must also observe the guidelines of the local water
utility companies.
If the water does not meet the requirements of The
Water Supply (Water Quality) Regulations 2000 (Amend-
ment) Regulations 2007, corrosion damage may occur
to the cylinder.
>
Only use the cylinder to heat potable water.
Preventing frost damage
You should not turn the gas-fired wall-hung boiler off
completely so that you can still use all of the safety
functions for your heating system. If you want to take
the unit out of operation for a relatively long period of
time in an unheated room at risk of frost, you must com-
pletely drain the cylinder.
Avoiding damage caused by leaks
If there are leaks in the pipework, close off the cold
water stop valve on the safety assembly and notify a
competent person so that they can rectify the leaks.
Preventing damage due to unauthorised changes
to the unit
Changes to the supply lines, relief valve termination, and
expansion relief valve may only be carried out by a com-
petent person!
>
The installed safety devices must always be used.
Avoiding damage resulting from the closing of the
expansion relief valve
Never shut off the expansion relief valve or relief valve
termination.
Safety instructions 2
Содержание uniSTOR
Страница 13: ...i The heat up time is based on a flow rate of 1400 l h at 80ºC Temperature rise from 15ºC to 60ºC ...
Страница 14: ......
Страница 15: ......
Страница 16: ...0020111106_00 GBIE 062011 Subject to change Manufacturer Supplier ...
Страница 53: ...Commissioning checklist and service record ...
Страница 56: ...0020111105_00 GBIE 062011 Subject to change Manufacturer Supplier ...