Installation and maintenance instructions for uniSTOR 0020111105_00
23
Gas-fired wall-hung
boiler
Wiring via
Control system
of the heating circuits
Regulation of cylinder
reheating
Hydraulic
plan
Connection
wiring
diagram
Vaillant ecoTEC,
eBUS-compatible
VR 65
Vaillant dual-channel
eBUS controller
Vaillant dual-channel eBUS
controller with VR 65
S plan
1 ¬ fig. 5.10
Vaillant ecoTEC,
eBUS-compatible
VR 65
Vaillant dual-channel
eBUS controller
Vaillant dual-channel eBUS
controller with VR 65
Y plan
2 ¬ fig. 5.11
Non-eBUS-compati-
ble boiler from a
third-party manufac-
turer
Standard
cabling box
Programmable timer
and room thermostat
Timer
S or Y plan
6 ¬ fig. 5.12
Tab. 5.2 Options for combining control components
Installation 5
Содержание uniSTOR
Страница 13: ...i The heat up time is based on a flow rate of 1400 l h at 80ºC Temperature rise from 15ºC to 60ºC ...
Страница 14: ......
Страница 15: ......
Страница 16: ...0020111106_00 GBIE 062011 Subject to change Manufacturer Supplier ...
Страница 53: ...Commissioning checklist and service record ...
Страница 56: ...0020111105_00 GBIE 062011 Subject to change Manufacturer Supplier ...