background image

Installation 5

uniSTOR GB

17

All internal wiring is factory mounted.
The thermostat which controls the DHW temperature (1,
fig. 10) is adjustable between 20 and 65 °C. The built in
safety thermal cut out operates at 90 °C. Should the
thermal cut out be brought into operation, the
motorized 2 port valve will be operated and shut the
primary flow to the cylinder. Press the reset button (2,
fig. 10) to reset thermal cut out and motorised valve.

Important:
Before resetting the thermal cutout or changing
the temperatur setting of the thermostat, switch

off the electrical supply.

Connections to wiring box

Provide a wiring box adjacent to the cylinder to make
the electrical connections.

Connect the boiler terminals to the corresponding
terminals of the wiring box.

Connect the uniSTOR cylinder controls to the wiring
box as shown in figure 10.

Connect the 2 port valve flying lead to the terminals
of the wiring box.

Connect the terminals of the programmer and room
thermostat to the terminals of the wiring box.

Connect a 3 amp fused mains supply to the terminals
of the wiring box.

Note:
All wiring must be carried out in accordance with
BS 7671: Requirements for electrical installations
(IEE Wiring Regulations, 16th edition).

Check that the sensors from the immersion heater
and the cylinder are positioned correctly in the tubes.

Note:
A special accessory is offered for the electrical
connections between the uniSTOR and an
ecoEURO appliance (No. 307 215).

5.4.5.3 Connection details for control systems utilising 2 x 2 port motorised valves via external

wiring box

Fig. 11  Connection details for control systems utilising 2 port motorised valve

Diagram only applies to the specific controls mentioned

L

N

L

N

3

4

5

N

L

CENTRAL
HEATING
ON

HOT
WATER
ON

3 amp fused
main supply

ecoTEC

terminal strip

Programmer
for programmer connections see fig. 12

L

N

L

N

3

4

5

N

L

6

7

External wiring box

3

4

5

6

7

8

9

10

N

N

L

L

(Do not use pre-wired printed circuit board type)

not used

EARTH

BLUE

BROWN

GREY

ORANGE

Hot water 2 port motorised valve

4

E

N

3

10

N

4

N

4

2

4

4

3

3

3

3

3

2

2

2

2

1

1

L

2

1

L

1

1

1

1

3

C

B

E

E

E

E

ACL Drayton Digistat 2, 3, 4

ACL Drayton RTS 1, 2

Danfoss Randall RX-1

Danfoss Randall RMT 230

Danfoss Randall RET 230

Tower SS

Honeywell T6360

Horstmann HRT 1

Siemens-Landys & Staefa RAD 1

Sunvic TLX 2000 series

5

9

6

L

N

E

Room thermostat

Vaillant Room
Thermostat VRT 30

9

6

N

2

3

1

10

7

uniSTOR Cylinder

E

EARTH

BLUE

BROWN

GREY

ORANGE

Central heating 2 port motorised valve

4

E

N

3

9

L in

N

L out

0020005468_02_GB_042008.qxd  16.04.2008  14:17 Uhr  Seite 17

Содержание uniSTOR VIH GB SERIES

Страница 1: ...Instructions for Installation and Use uniSTOR Unvented hot water storage cylinder VIH GB 125 S VIH GB 155 S VIH GB 180 S VIH GB 210 S VIH GB 260 S VIH GB 310 S GB...

Страница 2: ...y System 8 4 2 Secondary Return 8 5 Installation 9 5 1 Installation requirements 9 5 1 1 Siting 9 5 1 2 Mains Water Pressure 9 5 1 3 Pipework Primary Circuit 9 5 1 4 Discharge Pipework 9 5 1 4 1 High...

Страница 3: ...ting is controlled by a separatly fitted 2 port valve in conjunction with suitable external controls such as a programmer room thermostat or thermostatic radiator valves 1 3 Immersion Heater uniSTOR c...

Страница 4: ...28 30 33 39 44 49 kg Weight full 145 175 205 245 310 340 kg Height 969 1179 1339 1499 1789 2109 mm Cylinder connections Cold mains inlet 22 mm compression DHW outlet 22 mm compression Balanced pressu...

Страница 5: ...ate cylinder heat up time 15 C to 65 C minutes Reheat time for 70 of cylinder contents minutes 50 40 10 20 30 40 60 50 30 20 12 Heat input to cylinder kW Cylinder Heat Up Times 15 20 25 30 38 35 VIH G...

Страница 6: ...d be completed by the installer and or commissioning engineer and handed to the user All CORGI registered installers carry a CORGI ID card and have a registration number Both should be recorded in you...

Страница 7: ...y will become invalid if the damage is due to frost or freezing transient voltages lightning strikes or any act of vandalism or misuse 2 The proof of purchase must be produced in the event of any warr...

Страница 8: ...aws of the local Water Undertaking The installation is subject to Building Regulation approval notify the Local Authority of intention to install In the event of parts replacement use only genuine spa...

Страница 9: ...uniSTOR unvented storage cylinder should not be installed Contact Vaillant Ltd for details on alternative hot water supply systems In order to minimise frictional losses minimum 22 mm bore is recomme...

Страница 10: ...g temperature relief valve 500 mm maximum 300 mm minimum providing that where children may play or otherwise come into contact with discharges a wire cage or similar guard is positioned to prevent co...

Страница 11: ...84 314 589 903 VIH GB 180 S 1308 1339 454 384 314 589 1038 VIH GB 210 S 1468 1499 454 384 314 589 1118 VIH GB 260 S 1758 1789 454 384 314 589 1408 1376 VIH GB 310 S 2078 2109 454 384 314 589 1648 1376...

Страница 12: ...niSTOR GB 12 1 Boiler 2 uniSTOR cylinder 3 2 port motorised valve provided with the boiler 4 Immersion heater 5 2 port motorised valve A Boiler flow B Boiler return Fig 5 1 A B 2 4 3 5 M M DHW 5 3 Fun...

Страница 13: ...f valve 2 Expansion relief valve 3 Pressure limiting valve combined with strainer 4 Connection to expansion vessel 5 Balanced pressure cold water outlet 6 Cold water mains inlet 7 DHW outlet 8 Tundish...

Страница 14: ...ns supply to the uniSTOR To ensure optimum performance from the uniSTOR and particularly in installations where the balanced pressure cold water outlet 5 fig 8 is to be used the pipework provided from...

Страница 15: ...pe runs are of excessive length or there are several terminal fittings supplied extend the length of pipework in 22 mm Connect the secondary return if required as shown in 4 2 Secondary Return 5 4 3 S...

Страница 16: ...ls 1 Thermostat adjustable b Immersion heater 2 Thermal cut out with Reset button 3 Sensor 2 1 2 a b 1 3 230 V AC 3 kW 1 2 3 N L Important The immersion heater incorporates an energy cut off device an...

Страница 17: ...for electrical installations IEE Wiring Regulations 16th edition Check that the sensors from the immersion heater and the cylinder are positioned correctly in the tubes Note A special accessory is off...

Страница 18: ...Note Earth not required Link L 2 5 Siemens Landis Staefa RWB2 RWB9 Potterton Myson EP 2002 EP 3002 EP 6002 Note Link L 5 Sunvic Select 207 N L 2 3 4 5 3 7 6 1 E N L 2 3 4 1 E N L 2 3 4 5 3 7 6 1 N 3 5...

Страница 19: ...4 5 6 7 8 9 10 SL 1 2 3 uniSTOR VIH GB Central Heating 2 Port Motorised Valve Hot Water 2 Port Motorised Valve Cylinder Stat E BL BR GR OR L N Pump E BL BR GR OR L N HW ON CH ON 2 Channel Programmer...

Страница 20: ...cylinder has reached temperature and all radiators in the system are hot Then once again drain the complete CH system to remove residues from the pipework and refill and vent again as above Reset the...

Страница 21: ...ring frost conditions Advise the user that the immersion heater is provided as a back up means of water heating and is not intended for use at the same time that the boiler is heating the cylinder Fin...

Страница 22: ...g to controls instructions Is 2 port valve in correct position DHW position Does cylinder thermostat operate Replace cylinder thermostat Vent heating coil of air H fig 4 Check replace 2 port valve Is...

Страница 23: ...ansion vessel Does pressure hold Turn off boiler and immersion heater Is discharge still occuring YES NOT OK Is the discharge occuring only when the cylinder is being heated YES NO Is pressure downstr...

Страница 24: ...ty YES Replace TPRV Replace immersion heater NO YES NO Is operation now OK OK Fault remedied NOT OK Check temperature control of boiler Does 2 port valve change to heating position when cylinder reach...

Страница 25: ...limiting valve OK Check pressure limiting valve OK Check sytem for blockage OK Symptoms still persisting YES Check system as for discharge from temperature or expansion relief valve Inform customer t...

Страница 26: ......

Страница 27: ......

Страница 28: ...0020005468_02 GB 042008 Subject to alteration Printed in Germany...

Отзывы: