background image

5 Installation

uniSTOR GB

14

5.4 Installation procedure

Unpack the uniSTOR cylinder and check the contents
(detailed in section 4: notes to installers).

Position the uniSTOR in accordance with section 5.1.1:
Siting

5.4.1 Primary pipework

To prevent the uniSTOR from overheating the 2 port
motorised valve supplied with the boiler must be fitted
to the primary flow to the indirect coil (see figure 5).

Fig. 7

5.4.2 Secondary system Pipework

Connect the two cold water control valves together as
shown in fig. 8, ensuring that the orientation of the
valves, when installed in the cold mains supply, allows
the 15 mm outlet of the expansion relief valve to be
connected to the tundish.

Install the discharge pipe from the expansion relief
valve so that it has a contimous fall to outside in a
safe and visible position where it will be unaffected by
frost.
Never cap or block the outlet of the expansion relief
valve.

Activate the expansion relief valve regularly to prevent
from calcification.

Provide a cold water mains supply to the uniSTOR.
To ensure optimum performance from the uniSTOR,
and particularly in installations where the balanced
pressure cold water outlet (5, fig. 8) is to be used, the
pipework provided from the building mains stop valve
to the uniSTOR cylinder should be minimum 22 mm
copper tube.

´B´ Port

´A´ Port

A

B

Install the drain valve in the cold mains supply
between the uniSTOR cylinder and the cold water
control valves at the lowest point.

Install the assembled cold water control valves (fig. 8)
in the cold mains supply at a convenient position
adjacent to the uniSTOR cylinder, ensuring adequate
space exists for service access and allow for connection
of the discharge pipe from expansion relief valve.

If the discharge pipes are to be tied together the
expansion valve must be within 500 mm of the
temperature and pressure relief valve (fig 6).

Fig. 8

A

Mains Cold water inlet

B

Connection to cylinder

1

Secondary return connection

2

Expansion relief valve

3

Pressure limiting valve combined with strainer

4

Connection to expansion vessel

5

Balanced pressure cold water outlet

Important
No isolation valve shall be installed between the
assembled cold water control valves and the

cylinder.

A

2

B

4

5

3

1

0020005468_02_GB_042008.qxd  16.04.2008  14:17 Uhr  Seite 14

Содержание uniSTOR VIH GB SERIES

Страница 1: ...Instructions for Installation and Use uniSTOR Unvented hot water storage cylinder VIH GB 125 S VIH GB 155 S VIH GB 180 S VIH GB 210 S VIH GB 260 S VIH GB 310 S GB...

Страница 2: ...y System 8 4 2 Secondary Return 8 5 Installation 9 5 1 Installation requirements 9 5 1 1 Siting 9 5 1 2 Mains Water Pressure 9 5 1 3 Pipework Primary Circuit 9 5 1 4 Discharge Pipework 9 5 1 4 1 High...

Страница 3: ...ting is controlled by a separatly fitted 2 port valve in conjunction with suitable external controls such as a programmer room thermostat or thermostatic radiator valves 1 3 Immersion Heater uniSTOR c...

Страница 4: ...28 30 33 39 44 49 kg Weight full 145 175 205 245 310 340 kg Height 969 1179 1339 1499 1789 2109 mm Cylinder connections Cold mains inlet 22 mm compression DHW outlet 22 mm compression Balanced pressu...

Страница 5: ...ate cylinder heat up time 15 C to 65 C minutes Reheat time for 70 of cylinder contents minutes 50 40 10 20 30 40 60 50 30 20 12 Heat input to cylinder kW Cylinder Heat Up Times 15 20 25 30 38 35 VIH G...

Страница 6: ...d be completed by the installer and or commissioning engineer and handed to the user All CORGI registered installers carry a CORGI ID card and have a registration number Both should be recorded in you...

Страница 7: ...y will become invalid if the damage is due to frost or freezing transient voltages lightning strikes or any act of vandalism or misuse 2 The proof of purchase must be produced in the event of any warr...

Страница 8: ...aws of the local Water Undertaking The installation is subject to Building Regulation approval notify the Local Authority of intention to install In the event of parts replacement use only genuine spa...

Страница 9: ...uniSTOR unvented storage cylinder should not be installed Contact Vaillant Ltd for details on alternative hot water supply systems In order to minimise frictional losses minimum 22 mm bore is recomme...

Страница 10: ...g temperature relief valve 500 mm maximum 300 mm minimum providing that where children may play or otherwise come into contact with discharges a wire cage or similar guard is positioned to prevent co...

Страница 11: ...84 314 589 903 VIH GB 180 S 1308 1339 454 384 314 589 1038 VIH GB 210 S 1468 1499 454 384 314 589 1118 VIH GB 260 S 1758 1789 454 384 314 589 1408 1376 VIH GB 310 S 2078 2109 454 384 314 589 1648 1376...

Страница 12: ...niSTOR GB 12 1 Boiler 2 uniSTOR cylinder 3 2 port motorised valve provided with the boiler 4 Immersion heater 5 2 port motorised valve A Boiler flow B Boiler return Fig 5 1 A B 2 4 3 5 M M DHW 5 3 Fun...

Страница 13: ...f valve 2 Expansion relief valve 3 Pressure limiting valve combined with strainer 4 Connection to expansion vessel 5 Balanced pressure cold water outlet 6 Cold water mains inlet 7 DHW outlet 8 Tundish...

Страница 14: ...ns supply to the uniSTOR To ensure optimum performance from the uniSTOR and particularly in installations where the balanced pressure cold water outlet 5 fig 8 is to be used the pipework provided from...

Страница 15: ...pe runs are of excessive length or there are several terminal fittings supplied extend the length of pipework in 22 mm Connect the secondary return if required as shown in 4 2 Secondary Return 5 4 3 S...

Страница 16: ...ls 1 Thermostat adjustable b Immersion heater 2 Thermal cut out with Reset button 3 Sensor 2 1 2 a b 1 3 230 V AC 3 kW 1 2 3 N L Important The immersion heater incorporates an energy cut off device an...

Страница 17: ...for electrical installations IEE Wiring Regulations 16th edition Check that the sensors from the immersion heater and the cylinder are positioned correctly in the tubes Note A special accessory is off...

Страница 18: ...Note Earth not required Link L 2 5 Siemens Landis Staefa RWB2 RWB9 Potterton Myson EP 2002 EP 3002 EP 6002 Note Link L 5 Sunvic Select 207 N L 2 3 4 5 3 7 6 1 E N L 2 3 4 1 E N L 2 3 4 5 3 7 6 1 N 3 5...

Страница 19: ...4 5 6 7 8 9 10 SL 1 2 3 uniSTOR VIH GB Central Heating 2 Port Motorised Valve Hot Water 2 Port Motorised Valve Cylinder Stat E BL BR GR OR L N Pump E BL BR GR OR L N HW ON CH ON 2 Channel Programmer...

Страница 20: ...cylinder has reached temperature and all radiators in the system are hot Then once again drain the complete CH system to remove residues from the pipework and refill and vent again as above Reset the...

Страница 21: ...ring frost conditions Advise the user that the immersion heater is provided as a back up means of water heating and is not intended for use at the same time that the boiler is heating the cylinder Fin...

Страница 22: ...g to controls instructions Is 2 port valve in correct position DHW position Does cylinder thermostat operate Replace cylinder thermostat Vent heating coil of air H fig 4 Check replace 2 port valve Is...

Страница 23: ...ansion vessel Does pressure hold Turn off boiler and immersion heater Is discharge still occuring YES NOT OK Is the discharge occuring only when the cylinder is being heated YES NO Is pressure downstr...

Страница 24: ...ty YES Replace TPRV Replace immersion heater NO YES NO Is operation now OK OK Fault remedied NOT OK Check temperature control of boiler Does 2 port valve change to heating position when cylinder reach...

Страница 25: ...limiting valve OK Check pressure limiting valve OK Check sytem for blockage OK Symptoms still persisting YES Check system as for discharge from temperature or expansion relief valve Inform customer t...

Страница 26: ......

Страница 27: ......

Страница 28: ...0020005468_02 GB 042008 Subject to alteration Printed in Germany...

Отзывы: