background image

26

Installation and maintenance instructions 0020213395_04

8.7

Connection terminals

8.7.1

X100/S21 ESC contact

A potential-free normally open contact with a breaking capa-
city of 24 V/0.1 A. The function of this contact must be con-
figured in the system control, e.g. switching off the electric
back-up heater when the contact is closed.

8.7.2

X141 signal output for active cooling mode

A contact for connecting a pump for the cooling circuit and/or
an isolation valve for circuits that are not supposed to be
cooled (e.g. bathroom). Max. permitted current: 2 A

8.7.3

X144 external 3-port valve

Contact L has a continuous voltage of 230 V; contact S is a
normally open contact (operated at 230 V) for switching to
the domestic hot water circuit. Max. permitted current at both
connections: 0.2 A

8.7.4

X145 external back-up heater

A contact with potential in order to switch the external heater
on/off on-site via a relay or a contactor. Max. permitted cur-
rent at X145: 0.2 A

8.8

Connecting the system control and
accessories to the electronics system

1.

Install the system control in accordance with the install-
ation instructions supplied.

2.

Open the electronics box. (

Section 8.2)

3.

Carry out the wiring. (

Section 8.9)

4.

Connect controls and accessories in accordance with
the relevant basic system diagrams and installation
instructions.

5.

Install the VRC DCF receiver.

6.

Close the electronics box.

8.9

Carrying out the wiring

Caution.
Risk of material damage caused by incor-
rect installation.

Mains voltage at incorrect terminals and plug
terminals may destroy the electronics.

Do not connect any mains voltage to the
eBUS terminals (+/-).

Only connect the power supply cable to
the terminals marked for the purpose.

1.

Route the connection cables of the components to be
connected through the grommet provided on the rear of
the product on the left.

2.

Use the cable trunking on the top of the product.

3.

Use strain reliefs.

4.

Shorten the connection cables as necessary.

30 mm max.

5.

To prevent short circuits if a strand accidentally comes
loose, only strip the outer sheathing of flexible lines to
a maximum of 30 mm.

6.

Ensure the inner conductor insulation is not damaged
when stripping the outer sheathing.

7.

Only strip inner conductors just enough to establish
good, sound connections.

8.

To avoid short circuits resulting from loose individual
wires, fit conductor end sleeves on the stripped ends of
the conductors.

9.

Screw the respective plug to the supply line.

10.

Check whether all conductors are sitting mechanically
securely in the terminals of the plug. Remedy this if
necessary.

11.

Plug the plug into the associated PCB slot.

8.10

Installing the VRC DCF

Install the VRC DCF receiver in accordance with the in-
stallation instructions for the system control.

8.11

Installing optional accessories

1.

Route the lines through the ducts in the back wall of
the product.

2.

Open the electronics box. (

Section 8.2)

3.

Connect the connection cable to the corresponding
plugs or slots on the power supply PCB or control PCB.

4.

Use the strain reliefs to secure the lines in the product.

8.12

Connecting the circulation pump

1.

Carry out the wiring. (

Section 8.9)

2.

Connect the 230 V connection cable to the plug from
slot X14 and plug it into the slot.

3.

Connect the connection cable for the external button
using terminals 1 (0) and 6 (functional drawing) on the
X41 edge connector, which is supplied with the control.

4.

Plug the edge connector into slot X41 on the control
PCB.

8.13

Connecting the heat pump system to the
photovoltaic installation

1.

You require the following components for the connec-
tion:

External relay box with a relay with one N/O contact
with gold contacts for 24 V/20 mA

2.

Connect the relay contact to the

FB

multi-function input

and to the neutral-ground

0T

on terminal block

X41

on

the heat pump's control PCB.

Contact closed: System saves energy.

Contact open: Heat pump in normal operating
mode

3.

In the basic diagram book, select the

flexoTHERM

/

flexoCOMPACT

basic system diagram and the photo-

voltaic interface.

4.

Configure the relevant settings on the system control
( System control installation instructions).

Содержание flexoTHERM exclusive VWF 57/4 230V

Страница 1: ...en Installation and maintenance instructions flexoTHERM exclusive VWF 57 117 4 230V 0020213395_04 26 01 2023...

Страница 2: ...the VRC DCF 26 8 11 Installing optional accessories 26 8 12 Connecting the circulation pump 26 8 13 Connecting the heat pump system to the photovoltaic installation 26 8 14 Checking the electrical ins...

Страница 3: ...linder temperature sensor 51 J Characteristic values internal temperature sensors refrigerant circuit 51 K Characteristic values for the VRC DCF outdoor temperature sensor 52 L Commissioning Checklist...

Страница 4: ...use Any direct commercial or industrial use is also deemed to be improper Caution Improper use of any kind is prohibited 1 2 General safety information 1 2 1 Risk caused by inadequate qualifications T...

Страница 5: ...al filling of R410A refrigerant Escaping refri gerant may cause freezing if the exit point is touched If refrigerant escapes do not touch any components of the product Do not inhale any vapours or gas...

Страница 6: ...6 Installation and maintenance instructions 0020213395_04 1 3 Regulations directives laws standards Observe the national regulations stand ards directives ordinances and laws...

Страница 7: ...gy from a heat source circuit and releasing this into the heating circuit via the internal refrigerant circuit The heat pump can be connected to two different types of heat source geothermal energy an...

Страница 8: ...denser which works as an evaporator when in cooling mode This heat energy is absorbed by the refrigerant and heated to a higher temperature level using the compressor The heat energy is then delivered...

Страница 9: ...5 Pump and valve blocking protection system This function prevents the pumps for heating water and brine and all diverter valves from sticking The pumps and the valves which were out of operation for...

Страница 10: ...n From the heat source to the heat pump hot brine A 3 Hot water return 4 Heating circuit dia phragm expansion ves sel connection 5 Heating return 6 Heating flow 7 Recessed handles and grommet 4 2 Info...

Страница 11: ...the Benchmark Scheme Benchmark places responsibilities on both manufacturers and installers The purpose is to ensure that customers are provided with the correct equipment for their needs that it is i...

Страница 12: ...refri gerant filling volume Minimum in stallation room volume VWF 57 4 230V 1 50 kg 3 41 m VWF 87 4 230V 2 40 kg 5 45 m VWF 117 4 230V 2 50 kg 5 68 m Ensure that the required minimum clearances can b...

Страница 13: ...0020213395_04 Installation and maintenance instructions 13 5 3 Dimensions 671 651 595 600 20 833 1183 18 2 91 100 100 91 25 50 90 115 115 90...

Страница 14: ...that the weight dis tribution is as even as possible Secure the product using a retaining strap Use a ramp to move the product from the pallet using the sack truck e g a piece of square timber and a...

Страница 15: ...tear under load After installing the product render all of the retaining straps unusable To transport the product again at a later time use suitable transport harnesses instead of the attached transpo...

Страница 16: ...ide casings 1 Pull the casing top forwards slightly and remove it by lifting it upwards A A B B 2 To remove a side casing remove the four screws at the front and the three screws at the back 3 Remove...

Страница 17: ...inside the product Take the pressure loss in the magnetite fil ter into account when making your selec tion You must position the filter in direct prox imity to the return line to the heat pump 1 Ins...

Страница 18: ...not get into the heating water Checking the filling and supplementary water Before filling the installation measure the hardness of the filling and supplementary water Treating the filling and supplem...

Страница 19: ...rew 12 Check the heating installation pressure again if re quired repeat the filling procedure 13 Remove the filling hose from the filling draining valve and screw the screw cap back on Moving the hea...

Страница 20: ...ronics Ensure that the brine pump is filled in the direction of flow 7 Use the filling pump 67 to pour the brine fluid from the brine container 66 into the brine circuit 7 2 3 Purging the brine circui...

Страница 21: ...ection using the exact values that are specified in the technical data If the local energy supply company requires that the heat pump is controlled using a blocking signal install a cor responding con...

Страница 22: ...y for the back up heater Connect the power supply to the X102 power supply Appendix D 8 4 3 Connecting an external brine pressure switch In some cases e g in potable water protection areas local autho...

Страница 23: ...l and RR injection well terminals Terminal assignment for terminal X200 on the power supply PCB Terminal 1 2 Well inlet temperature Terminal 3 4 Well outlet temperature Note No functions are coupled t...

Страница 24: ...nd 230 V electronics system power supply PCB TB and control PCB HMU 8 X1A 230 V supply for control PCB 9 X144 External 3 port valve 10 X105 Connection for compressor with in rush cur rent limiter 11 L...

Страница 25: ...nsor multi function input can be adjusted in the system con trol 9 X26 Sensor cable harness 230 V L N PE 10 X100 S20 Limit thermostat 11 X100 S21 ESCO contact 12 X100 BUS Bus connection VR 900 13 X20...

Страница 26: ...y 30 mm max 5 To prevent short circuits if a strand accidentally comes loose only strip the outer sheathing of flexible lines to a maximum of 30 mm 6 Ensure the inner conductor insulation is not damag...

Страница 27: ...uctions 3 Check the filling pressure of the heating installation and check for leaks 9 Start up 9 1 Operating concept Operating instructions 9 2 Starting up the heat pump system 50 d kWh reset 1 2 3 4...

Страница 28: ...phase see Appendix A External 2 0 kW 3 5 kW 5 5 kW Output levels for the 230 V auxiliary electric heating when connecting three separate phases see Appendix B 7 kW 9 kW 9 3 5 Purging the building cir...

Страница 29: ...his set ting for every heat pump with cooling function Go to the system control Activate cooling mode Installation instructions for the system control 9 8 Calling up statistics Menu Installer level Te...

Страница 30: ...Ground water heat source A Remaining feed head in hPa mbar B Pump output in 10 2 3 Setting the environment circuit pump If the heat source temperature spread lies below 2 K due to low pressure losses...

Страница 31: ...ing mode target flow temperature 75 4 Confirm this change by pressing OK 10 4 Setting the flow temperature in cooling mode with no control connected 1 Activate manual operation Menu Installer level Co...

Страница 32: ...ternal temperature sensors refrigerant circuit Appendix J Characteristic values for the VRC DCF outdoor temperature sensor Appendix K 11 8 Electric back up heater circuit breaker A circuit breaker is...

Страница 33: ...rectly x x 6 Check that the expansion vessel and the expansion relief valve in the heating circuit are working correctly x x 7 Check for leaks in the brine and heating circuit and re pair these leaks...

Страница 34: ...of the packaging correctly Observe all relevant regulations Disposing of the product and accessories Do not dispose of the product or the accessories with household waste Dispose of the product and al...

Страница 35: ...Z 11 PT 11 TT 14 TT 10 PT 10 TT 17 TT 30 PT 30 TT 31 TT 20 PT 20 TT 21 TZ 21 M C S E D V7 TCE CP2 1 3 2 4 5 6 FLT1 FLT2 1 Heating circuit diaphragm expansion vessel connec tion 2 Circulation connectio...

Страница 36: ...mpressor outlet temperature sensor TT14 Intermediate injection compressor inlet temperature sensor TT17 Electronic expansion valve outlet temperature sensor TT20 Heating return temperature sensor TT21...

Страница 37: ...sor connection 2 X15 internal 3 port diverter valve 3 X13 internal brine pump 4 X16 internal heating pump 5 X11 internal 4 port diverter valve 6 230 V supply to control PCB 7 To the heating pump 8 To...

Страница 38: ...th power The internal electric back up heater at X102 is permanently supplied with power via a separate connection or it can be locked D Power supply 3 PE 230 V wiring diagram 2 IT 1 0 1 X 2 0 1 X 2 P...

Страница 39: ...e injection steps Current value VUV DHW switchings Current value Well pump hours Current value h Well pump starts Current value Im heater pwr cons Current value kWh Im heater switchings Current value...

Страница 40: ...temperature 40 90 0 1 T 82 Building circuit Pressure 0 4 5 bar 0 1 T 83 Building circuit Flow rate 0 4000 l h 1 T 84 Lockout contact S20 Open Closed Open closed Closed T 85 Safety cut out immersion he...

Страница 41: ...alidate DCF signal Valid DCF signal T 148 System temperature 40 90 0 1 T 149 MPI input Closed Open Closed Open Open Installer level Configuration Language Current language Languages available for sele...

Страница 42: ...PCB Software version of the in rush current limiter ICL Software version of the first fan unit OMU1 Software version of the second fan unit OMU2 xxxx xx xx Installer level Resets Cancel switch on del...

Страница 43: ...S 101 Heating Compressor shutdown S 102 Heating Compressor blocked S 103 Heating Pre run S 104 Heating Compressor active S 107 Heating Overrun S 111 Cooling Compressor shutdown S 112 Cooling Compresso...

Страница 44: ...w temperature too low S 274 Building circuit Pressure too low S 275 Building circuit Flow rate too low S 276 Building circuit Lockout contact S20 open S 277 Building circuit Pump fault Displays relati...

Страница 45: ...plug contact on the PCB and on the cable harness check that the pressure sensor is working correctly and if required replace the pressure sensor M 49 Only with the heat source Air Environment circuit...

Страница 46: ...ing circuit Check the building circuit flow rate Check the quality of the plug contact on the PCB and on the cable har ness Check that the sensor is working correctly resistance measurement using sens...

Страница 47: ...environment circuit Brine fluid viscosity is too high Switch the heat pump off for at least 30 seconds no current Check the quality of the plug contact on the PCB Check that the pump functions cor rec...

Страница 48: ...Evaporation temperature too low No flow rate in the environment cir cuit heating mode Energy input too low in the environ ment circuit heating mode or build ing circuit cooling mode Check the flow ra...

Страница 49: ...ronment circuit Check the sensors Reduce or stop the external heat that is entering F 743 Building circuit Return temp too high Return temperature in the building circuit too high for the compressor t...

Страница 50: ...xternal heat into the building circuit Check the circulation in the building circuit pump If required open the stopcocks The safety cut out is automatically reset as soon as the temperature at the fus...

Страница 51: ...35 1764 40 1439 45 1180 50 973 7 55 807 5 60 673 2 65 563 9 70 474 6 75 401 3 80 340 8 85 290 6 90 248 8 95 213 9 100 184 6 105 160 0 J Characteristic values internal temperature sensors refrigerant...

Страница 52: ...256 85 1070 90 916 95 786 100 678 105 586 110 509 115 443 120 387 125 339 130 298 135 263 140 232 145 206 150 183 K Characteristic values for the VRC DCF outdoor temperature sensor Temperature C Resis...

Страница 53: ...hould be made aware it is ultimately their responsibility to register with the manufacturer within the allotted time period It is essential that the heat pump is serviced in line with the manufacturer...

Страница 54: ...V VWHP KDV EHHQ XVKHG DQG FOHDQHG LQ DFFRUGDQFH ZLWK 6 DQG KHDW SXPS PDQXIDFWXUHU V LQVWUXFWLRQV Yes What system cleaner was used What inhibitor was used Quantity litres Is the system adequately frost...

Страница 55: ...ompany name Telephone No 2SHUDWLYH 1R Comments Signature SERVICE 05 Date Engineer name Company name Telephone No 2SHUDWLYH 1R Comments Signature SERVICE 07 Date Engineer name Company name Telephone No...

Страница 56: ...hould be made aware it is ultimately their responsibility to register with the manufacturer within the allotted time period It is essential that the heat pump is serviced in line with the manufacturer...

Страница 57: ...accordance with BS7593 2019 Yes Heat Pump outdoor unit Tick the appropriate boxes Measure and Record Is the heating system adequately frost protected and pipes insulated to prevent heat loss Yes Spli...

Страница 58: ...issioning l min Additional heat sources connected Gas Boiler Oil Boiler Electric Heater Solar Thermal Other ALL INSTALLATIONS All electrical work complies with the appropriate Regulations Yes The heat...

Страница 59: ...been checked and appropriate action taken in accordance with BS 7593 and heat pump manufacturers instructions Yes N a Comments Signature SERVICE 01 Date Engineer name Company name Telephone No Operat...

Страница 60: ...not have under taken this if the service engineers attendance visit was in between annual services to attend a non water facing component SERVICE 01 Date Engineer name Company name Telephone No Operat...

Страница 61: ...impedance Z max with in rush current limiter 0 472 0 472 0 472 Required network impedance Z max for auxiliary heater 0 472 0 472 0 472 Fuse type characteristic C slow blow three pole switching disconn...

Страница 62: ...70 bar Max brine fluid operating pressure 0 3 MPa 3 0 bar 0 3 MPa 3 0 bar 0 3 MPa 3 0 bar Max electrical power consumption brine circuit pump 76 W 76 W 130 W Brine pump type High efficiency pump High...

Страница 63: ...4 230 V Installation site Interior dry Interior dry Interior dry Installation room volume complying with EN 378 3 41 m 5 45 m 5 68 m Permissible environmental temperature at the installation site 7 t...

Страница 64: ...kW 11 32 kW Effective power consumption B0 W45 T 5 K 1 58 kW 2 51 kW 3 28 kW Coefficient of performance B0 W45 T 5 K EN 14511 3 35 3 27 3 45 Heat output B0 W55 T 8 K 5 37 kW 8 64 kW 11 67 kW Effective...

Страница 65: ...ar Nominal flow with T 8 K 710 l h 1 120 l h 1 510 l h Max remaining feed head with T 8 K 0 062 MPa 0 620 bar 0 2103 MPa 2 1030 bar 0 4045 MPa 4 0450 bar Min volume flow during continuous oper ation a...

Страница 66: ...B A 49 4 dB A 50 7 dB A Sound power level W10 W55 EN 12102 EN 14511 LWI in heating mode 45 7 dB A 52 6 dB A 52 6 dB A Application limits for the heat pump Heating heat source ground water At the same...

Страница 67: ...15 2 0 0 15 2 19 1 19 1 5 5 kW 23 9 19 1 20 9 8 7 15 2 19 1 19 1 7 0 kW 15 2 15 2 26 3 19 1 19 1 9 0 kW 20 9 20 9 26 3 19 1 19 1 X12 max 1 3 X14 max 0 9 X141 X143 X144 X145 max 2 5 A 0 0 kW 0 0 23 8 0...

Страница 68: ...5X 4 heat pump with a nominal heat output of 5 kW is 23 9 A if connected in accordance with wiring diagram 1 in compressor mode with the electric back up heater activated and an output of 5 5 kW enabl...

Страница 69: ...18 Disposal accessories 34 Disposal brine fluid 34 Disposal packaging 34 Disposal product 34 Disposing of refrigerant 34 Documents 7 E eBUS lines routing 21 Electric back up heater circuit breaker 32...

Страница 70: ...rvice number 28 Scope of delivery 11 Sensor test 32 Serial number 11 Service message checking 33 Service number saving 28 Setting parameters 29 Setting building circuit pump 29 Setting cooling technol...

Страница 71: ......

Страница 72: ...isher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 49 2191 18 0 Fax 49 2191 18 2810 info vaillant de www vaillant de These instructions or parts thereof are protected by copyrigh...

Отзывы: