17
Installation and maintenance instructions ecoTEC plus 0020031552_03
4
Sequence of operations during
installation
4.1 Transporting
the
appliance
a
Important:
With regards to the Manual Handling Operations,
1992 Regulations, the following lift operation
exceeds the recommended weight for a one man
lift.
General recommendations when handling
• Clear the route before attempting the lift.
• Ensure safe lifting techniques are used – keep back
straight – bend using legs.
• Keep load as close to body as possible. Do not twist –
reposition feet instead.
• If 2 persons performing lift, ensure co-ordinated
movements during lift.
• Avoid upper body/top heavy bending - do not lean
forward/sideways.
• Recommend wear suitable cut resistant gloves with
good grip to protect against sharp edges and ensure
good grip.
• Always use assistance if required.
Removal of carton from delivery van
• Recommend 2 person lift or 1 person with use of sack truck.
• If 1 person is performing lift, straddle the load, tilt and
place carton into position on truck.
• Recommend secure appliance onto truck with suitable
straps.
• Ensure safe lifting techniques are used – keep back
straight – bend using legs.
• Keep load as close to body as possible.
• If 2 persons performing lift, ensure co-ordinated
movements during lift.
• Always use assistance if required.
Carriage of carton from point of delivery to point of
installation – ground floor.
• Recommend 2 person lift or 1 person with use of sack truck.
• If 1 person is performing lift, straddle the load, tilt and
place carton into position on truck.
• Recommend secure appliance onto truck with suitable
straps.
• Ensure safe lifting techniques are used – keep back
straight – bend using legs.
• Keep load as close to body as possible.
• If 2 persons performing lift, ensure co-ordinated
movements during lift.
• Clear the route before attempting the lift.
• If removing boiler from truck straddle the load and tilt
forwards to facilitate secure grip.
• Ensure safe lifting techniques are used – keep back
straight – bend using legs.
• Do not twist – reposition feet instead.
• Take care to avoid trip hazards, slippery or wet
surfaces and climbing steps and stairs.
• Always use assistance if required.
Carriage of carton from point of delivery to point of
installation – first or higher floor, cellar.
• Recommend 2-person lift or 1 person with use of sack
truck.
• If 1 person is performing lift, straddle the load, tilt and
place carton into position on truck.
• Recommend secure appliance onto truck with suitable
straps.
• Ensure safe lifting techniques are used – keep back
straight – bend using legs.
• Keep load as close to body as possible.
• If 2 persons performing lift, ensure co-ordinated
movements during lift.
• Avoid upper body/top heavy bending - do not lean
forward/sideways.
• Clear the route before attempting the lift.
• If removing boiler from truck straddle the load and tilt
forwards to facilitate secure grip.
• Ensure safe lifting techniques are used – keep back
straight – bend using legs.
• Do not twist – reposition feet instead.
• Take care to avoid trip hazards, slippery or wet
surfaces and climbing steps and stairs.
• Always use assistance if required.
Carriage of carton from point of delivery to point
of installation – roofspace.
• Recommend 2-person lift.
• Ensure co-ordinated movements during lift.
• Avoid upper body/top heavy bending - do not lean
forward/sideways.
• Clear the route before attempting the lift.
• Take care to avoid trip hazards, slippery or wet
surfaces and climbing steps and stairs.
• When transferring appliance into roofspace,
recommend 1 person to be in roofspace to receive the
appliance and other person to be below to pass up
and support appliance.
• Ensure safe lifting techniques are used – keep back
straight – bend using legs.
• Keep load as close to body as possible.
• Always use assistance if required.
• It is assumed safe access, flooring and adequate
lighting are provided in the roof space.
• It is recommended a risk assessment of the roof space
area be carried out before moving the appliance into the
area to take into account access, stability of flooring, ligh-
ting and other factors, and appropriate measures taken.
Unpacking of appliance from carton.
• Recommend 2 persons unpack appliance from carton.
• Always keep working area clear.
• Recommend straps and open carton flaps, then remove
items from the top including the polystyrene packing
and remove carton by sliding up over the boiler.
Sequence of operations during installation 4
Содержание ecoTEC plus 937
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ...0020031552_03 GB 052008...