
Installation and maintenance instructions ecoTEC plus 0020031552_03
12
3.3
Scope of supply and accessories
1 1
10
9
8
7
6
5
4
3
2
1
Fig. 3.1 Scope of supply and accessories
The shift load storage tank and the combi boiler are
delivered pre-assembled in one packaging unit.
Check that all parts have been delivered undamaged
(see Fig. 3.1 and Table 3.1 ).
h
Note
At this stage do not yet remove the combi
boiler and the shift load storage tank from
the expanded polystyrene base to prevent any
damage.
Pos. Quantity Name
1
1
Combi boiler ecoTEC plus
2
1
Bottom cover ecoTEC plus
3
1
Installation template
4
4
Isolating valves and filling loop
5
6
Connecting pipes (gas, heating, water, safety
valve)
6
5
Adapter set, consisting of connecting pipes bet-
ween the shift load storage tank and the combi
boiler for gas, heating flow and return and water
flow and return
7
2
Installation and connection accessories:
8
3
User, installation and service, flue installation ma-
nuals
9
1
Bottom cover for shift load storage tank
10
1
Shift load storage tank
11
1
Hanging bracket
Table 3.1 Scope of supply and accessories
3.4 Installation
location
h
Note
When selecting the installation location observe
the regulations and recommendations for combi
boilers!
The installation location for the combi boiler and shift
load storage tank must permit proper connection of the
flue gas system to the combi boiler. In addition there
must be sufficient space for maintenance work and air
circulation around the combi boiler and the shift load
storage tank.
The Combi boiler and shift load storage tank can be
mounted together in any room you wish to choose.
In rooms with a bath or a shower, the special require-
ments of BS 7671 (IEE Regulations), the electro-technical
stipulations of the Building Standards (Scotland) Regula-
tions and, in IE, the current issue of IS 813 and the cur-
rent ETCI Stipulations must especially be observed.
e
Danger!
Danger of death by electric shock!
If a room-sealed combi boiler is installed in
a room with a bath or a shower, the electrical
switches and the boiler controller, which
operate at mains voltage, must be mounted
in locations where any person in the bath or
in the shower cannot reach them.
In the event of installation in unusual locations, special
provisions may have to be made. Detailed instructions
for this can be found in BS 5546 and in BS 6798.
The ecoTEC plus 937 must be mounted on a flat, vertical
wall which is sufficiently strong to hold the weight of
the shift load storage tank and the combi boiler.
It is possible to mount onto a wall made of flammable
material if the regulations of the Local Authority and
the legal building regulations are fulfilled. In this case
3 General requirements
Содержание ecoTEC plus 937
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ...0020031552_03 GB 052008...