39
Installation and maintenance instructions ecoCRAFT 0020055744_08
• Open the gas valve and check for leaks up to the gas
fitting.
• Switch the boiler on.
• Use a gas sensing instrument to check for leaks in the
gas/air combination behind the gas fitting and along
the burner gaskets.
• Tighten the screws to 12 Nm if necessary.
8.11
Changing the ignition and ionisation/
monitoring electrodes
a
Caution!
Danger of malfunctions caused by deposits!
Deposits on the electrodes can cause impair-
ments to the function of the unit.
The ignition and ionisation/monitoring elec-
trodes should therefore be replaced annually.
Cleaning is not sufficient and is therefore not
acceptable.
1
7
2
6
4
5
3
Fig. 8.9 Removing the ignition and ionisation/monitoring elec-
trodes
• Carefully pull off the connecting cable (
1
, Fig. 8.9)
from the ignition electrode (
7
, Fig. 8.9).
• Loosen the two fixing nuts (
2
, Fig. 8.9) on the ignition
electrode and remove the entire electrode.
• Replace the gasket (
3
, Fig. 8.9) and fit the new igni-
tion electrode.
• Carefully pull off the connecting cable from the ionisa-
tion/monitoring electrode (
3
, Fig. 8.9).
• Loosen the two fixing nuts (
4
, Fig. 8.9) on the ionisa-
tion/monitoring electrode and remove the entire elec-
trode.
• Replace the gasket (
5
, Fig. 8.9) and fit the new ionisa-
tion/monitoring electrode.
• Tighten the fixing nuts (
2
and
4
, Fig. 8.9) to 2 Nm and
reconnect the leads.
8.12
Checking the safety thermostat
1
Fig. 8.11 Reset button
Key
1 STL reset button with cover cap
• Switch on the mains switch.
• Turn the heating circuit off.
• Set the unit to maximum feed temperature and heat
the unit up to switch-off by the controller.
• After waiting for two minutes (temperature equalisa-
tion) start the "
P.5
" test program.
As a result of starting the "
P.5
" test program, the boiler
remains in operation until the safety temperature limit-
er responds.
To call up the "
P.5
" test program, proceed as follows:
• Switch the mains "
on
" and simultaneously keep the
"
+
" button pressed for 5 seconds.
• Using "
+
" or "
-
", select the "
P.5
" test program.
• Confirm your selection by pressing the "
Info
" button.
The test program and hence the boiler will be started
for the STL test.
h
Note
The internally connected heating pump is
switched off during the STL test.
The boiler must switch off at 110 ºC.
• Reset the safety thermostat after the boiler has
cooled down (see Section 9.4).
h
Note
The test program is automatically exited after
15 minutes. The test must be performed within
this time period.
8.13
Check the dust filter
• Check the dust filter annually for contamination.
• Clean the dust filter or replace it with a new one.
8.14 Functional
check
After completion of all inspection and maintenance
work, always carry out a function check as described in
Section 6.6.
Inspection and maintenance 8