6 Installing the 130 mm diameter system
20
Installation manual Air/flue gas system 0020058722_04
6.2.4
Installing the shaft extension
1
2
3
4
min. 100 mm
min. 300 mm
1.
Install the 130 mm diameter aluminium flue pipe
(4)
that
is included in the scope of delivery.
2.
Remove the line from the shaft.
3.
Slide the shaft extension
(3)
over the aluminium pipe
(4)
and secure it to the shaft side using rawl plugs and
bolts.
4.
Secure the top cover with rear ventilation
(1)
to the alu-
minium pipe using the safety line
(2)
that is included.
5.
Lock the top cover into the shaft extension
(3)
.
6.2.5
Installing the shaft connection
1
4
3
2
1.
Insert the 500 mm flue pipe
(2)
into the support elbow.
2.
Shorten the DN 180 safety pipe for the shaft opening
(1)
to the shaft wall thickness.
3.
Push the safety pipe over the flue pipe in the shaft until
it ends flush with the shaft's external wall.
4.
Secure the safety pipe with mortar and leave it to
harden.
5.
Fit the wall collar
(4)
that is contained within the scope
of delivery over the flue pipe. Only secure the wall collar
to the shaft after completing the installation work.
6.
Create an opening at the foot of the shaft for rear ventil-
ation of the shaft.
Conditions
: Rear ventilation of the shaft required
–
Dimensions: 150 x 150 mm
7.
Secure the ventilation grille
(3)
.
8.
Secure the pipe wall collar.
6.3
Flue gas connection and installing the
horizontal flue gas pipe
6.3.1
Scope of delivery article number
0020060589
1 Transition piece, 130 mm
diameter
2 Elbow 87°
3 Extension with measure-