0020209589_04 ecoTEC pro Installation and maintenance instructions
31
1
▶
Regulate the pressure using the adjusting screw
(1)
.
Position of the
adjusting screw
Pres-
sure
in MPa
(mbar)
Notes/application
Right-hand stop
(turned all the
way down)
0.035
(350)
If the radiators do not heat
up sufficiently at the default
setting. In this case, you
must set the pump to the
maximum speed.
Mid-position
(5 turns to the
left)
0.025
(250)
Default setting
5 further turns to
the left from the
mid-position
0.017
(170)
If noises are produced in
the radiators or radiator
valves
▶
Install the front casing.
11 Handing over to the end user
▶
At the time of commissioning complete all relevant sec-
tions of the Benchmark commissioning checklist, located
at the rear of this document.
▶
For IE: Complete a “Declaration of Conformity” to indicate
compliance to I.S. 813. An example of this is given in the
current edition of I.S. 813.
▶
When you have finished the installation, affix the en-
closed sticker (which requests that the user reads the
instructions) to the front of the product in the end user's
language.
▶
Draw attention, to the current issue of the Gas Safety
(Installation and Use) Regulations, Section 35, which
imposes a duty of care on all persons who let out any
property containing a gas appliance in the UK.
▶
Explain to the end user how the safety devices work and
where they are located.
▶
Inform the end user how to handle the product.
▶
In particular, draw attention to the safety warnings that
the end user must follow.
▶
Inform the end user that they must have the product
maintained in accordance with the specified intervals.
▶
Pass all of the instructions and documentation for the
product to the end user for safe-keeping.
▶
Inform the end user about measures taken to ensure
the supply of combustion air and flue gas guiding, and
instruct the operator that he must not make any changes.
▶
Inform the end user that they must not store or use explo-
sive or highly flammable substances (such as petrol, pa-
per or paint) in the installation room of the product.
▶
Complete and sign off the Benchmark commissioning
check list.
▶
Complete and sign off the guarantee documentation.
Содержание 0010016538
Страница 1: ...en Installation and maintenance instructions ecoTEC pro VUW 6 5 3 0020209589_04 29 07 2020...
Страница 55: ......