25
7.5.5 Settings
By entering the password (1234) and touching the Log in button the Settings menu is opened.
In this menu you can choose to show the orange zone of the ShaPoLi gauge in the ShaPoLi Home
screen. This orange zone represents the Power area between the green and red zone on the ShaPoLi
gauge. If this is enabled, the start power value can be filled in.
Figure 30
– Settings – Date / Time and orange zone can be
set
Figure 31
– Settings – Date / Time and orange zone can be
set
NOTE:
The orange zone is not linked to the Digital Output!
8.
MAINTENANCE
No special maintenance is needed for the Bridge Panel PC.
The screen can be cleaned with a dry and clean cloth.
Do not use any cleaning product or chemical on the screen.
When removing the SDB-3 and Bridge Panel PC precautions must be taken to prevent
personal injuries and damage to the SDB-3 and Bridge Panel PC.
9.
REPAIR
SDB-3 and Bridge Panel PC cannot be repaired on site.
10.
TAKE OUT OF SERVICE
Switch off the 24VDC and/or 115/230VAC power supply.
11.
REMOVAL AND STORAGE OF EQUIPMENT
Switch off the 24VDC and 115/230VAC power supply.
Make sure that all wires that are connected to the SDB-3 and Bridge Panel PC are labelled correctly so
that re-installation of the SDB-3 and Bridge Panel PC can be done without any errors.
Disconnect all the input and output wires.
Store the SDB-3 and Bridge Panel PC in a box in a cool and dry place, so that the SDB-3 and Bridge
Panel PC system cannot be damaged.