24
VADA FLOW BOSS
SUBMERSIBLE PUMP
VFB-S75
INSTALLATION MANUAL
OPERATION
Do not run pump dry. Ensure that
the pump is fully submerged.
Submersible Pump &
Auto Pressure Control
1. Slowly open the gate valve on the
discharge line to 50%.
2. Once the pipework is full, open the gate
valve on the discharge line to 100%. This
will assist with removal of unwanted air.
When the power is turned on, the pump
will start to pump water.
3. Open the isolation valve that is connected
to the VFB-APC, then open an outlet. The
pump will start automatically and continue
to run at constant pressure. If you’re using
a VFB-APC, the yellow “Pump On” LED
on the Pressure Control will illuminate.
Note:
Without a VFB-APC or VFB-DSU, the
pump will continue to operate until the power
is switched off.
Note:
On initial start-up the pump will run until
the supply line is primed.
4. Once all pipework has been filled on the
discharge side line, close the valve.
Note:
The pump will run for a short period of
time until the system is again pressurised and
then stop.
OPEN 50%
VFB-APC
32mm Isolation valve
32mm
Y Strainer
32mm
Barrel union
Flow
32mm
Check valve
OPEN 100%
VFB-APC
32mm Isolation valve
32mm
Y Strainer
32mm
Barrel union
Flow
32mm
Check valve
CLOSE
Error
Pump on
Power on
Restart
1~240V 50 Hz
Max 1.5kW 10A
Max 65°C
IP65
Max 1MPa (10 bar)
AUTO PRESSURE CONTROL
VFB-APC
Содержание VFB-S75
Страница 1: ...SUBMERSIBLE PUMP INSTALLATION MANUAL VFB S75...
Страница 48: ......