6. Install the float switch provided. The float
switch greatly reduces the risk of the pump
losing prime, which could cause damage to
the pump. For more information, view the
full VFB-DSU manual.
PART 6: CONNECT
TO A POWER SUPPLY
Once your submersible pump is positioned
and pipework is completed, it’s time to connect
to power.
Note:
Do not use extension cords. These can
cause a voltage drop.
1. Before plugging the power supply cord
into the power point, ensure the power point
is in a dry and flood free location.
2. Plug the power supply cord into the
10 Amp power point. Do not switch on.
OFF
OFF
In accordance with AS 3350.2.41
we are obliged to inform you
that this pump is not to be used
by children or infirm persons and
must not be used as a toy.
22
VADA FLOW BOSS
SUBMERSIBLE PUMP
VFB-S75
INSTALLATION MANUAL
INSTALLATION
Household
Min 100mm
Mains
Cable
tie
Min 70mm above suction
32mm
Y Strainer
32mm
Barrel union
Flow
Ground level
VFB-S75
100mm
Содержание VFB-S75
Страница 1: ...SUBMERSIBLE PUMP INSTALLATION MANUAL VFB S75...
Страница 48: ......