20
VADA FLOW BOSS
JET PUMP
VFB-J90
INSTALLATION MANUAL
INSTALLATION
4. Check the set up so far. Ensure that the
VFB-APC is braced or fixed so minimal
movement occurs once in operation. If the
distance between the pump and highest
outlet exceeds 15m, adjust the cut-in
pressure on the VFB-APC.
32mm Y Strainer
Barrel union
Solid base
10
0m
m
Flow
Isolation
valve
2. Position the Auto Pressure Control
(VFB-APC) between the pump and the first
outlet.
Note:
If you are installing the VFB-APC directly
onto the Jet Pump, use a 25mm barrel union.
If you are installing the VFB-APC between the
pump and first outlet, use pipework with a
minimum internal diameter of 25mm.
Note:
Do not install an outlet between the
pump and VFB-APC.
Note:
the pipe must have an internal diameter
no smaller than 25mm until the first tee branch.
3. Ensure the VFB-APC is installed with the
arrows pointing up.
Solid base level