25mm
isolation
valve
25mm
barrel union
25mm barrel union
25mm Y-Strainer
Solid level base
100mm
To house
25mm
isolation
valve
Mains pipe
min 25mm
From mains
House wall
VFB-DSU
Discharge pipe
min 25mm
Min 100mm
Flow
25mm
barrel union
Ground level
Solid base
House wall
100mm
Suction pipe
min 25mm
Foot valve
25mm
isolation
valve
25mm
barrel union
To house
25mm
isolation
valve
Mains pipe
min 25mm
From mains
VFB-DSU
Discharge pipe
min 25mm
Min 100mm
29
28
VADA FLOW BOSS
HORIZONTAL MULTISTAGE PUMP
VFB-HM80
INSTALLATION MANUAL
OPERATION
Horizontal Multistage Pump
and Auto Pressure Control/Auto
Pressure Control and Mechanical
Water Switching Unit
Note:
The following images show a set up with
pump, VFB-APC and VFB-MSU, however these
steps apply to all possible set ups.
Ensure that the pump has been
successfully primed.
1. Open the gate valve on the suction line.
2. Slowly open the gate valve on the
discharge line to 50%.
3. Turn the power on at the powerpoint.
4. When the power is turned on the pump
will start to pump water. If you’re using an
VFB-APC, the yellow “Pump On” LED on
the Pressure Control will illuminate.
ON
FLOW BOSS SET UP OPTIONS
Set up 3: Above Ground Digital Water Source Switching
• Vada Flow Boss Horizontal Multistage Pump VFB-HM80
• Vada Flow Boss Digital Water Switching Unit VFB-DSU
Set up 4: Above Ground Digital Water Source Switching
• Vada Flow Boss Horizontal Multistage Pump VFB-HM80
• Vada Flow Boss Digital Water Switching Unit VFB-DSU
10
0m
m
Solid base
OPEN
Flow
Flow
Isolation
valve
To house
Mains water in
10
0m
m
Solid base
Flow
Flow
Isolation
valve
OPEN TO 100%
10
0m
m
Solid base
Flow
Flow
Isolation
valve
OPEN TO 50%
Содержание VFB-HM80
Страница 1: ...HORIZONTAL MULTISTAGE PUMP INSTALLATION MANUAL VFB HM80...
Страница 29: ......