Maintenance
All technical devices, drives as well, need a certain amount of care-taking and failure preventive
maintenance. To maintain trouble-free operation of the Vacon
®
NX Active Front End,
environmental conditions, as well as load, line power, process control, etc. have to be within
specifications, determined by manufacturer.
If all conditions are in accordance with the manufacturer's specifications, there are no other
concerns, but to provide a cooling capacity high enough for the power- and control circuits. This
requirement can be met by making sure, that the cooling system works properly. Operation of
cooling fans and cleanness of the heat sink should be verified regularly.
Regular maintenance is recommended to ensure trouble free operation and long lifetime of Vacon
®
NX Active Front End. At least the following things should be included in the regular maintenance.
It is also recommended to record all actions and counter values with dates and time for follow up
of maintenance.
Table 3. Maintenance interval
Interval
Maintenance
12 months (if unit is stored)
Capacitor reforming, see seperate instructions.
6 - 24 months (depending on environment)
Check tightening torque of the input and output
terminals and I/O terminals.
Clean the cooling tunnel.
Check operation of the cooling fan, check for
corrosion on terminals, bus bars and other
surfaces.
Check the door filters.
5 - 7 years
Change the cooling fans.
Main fan of the unit.
Fan of the LCL filter.
5 - 10 years
Change the DC bus capacitors if DC voltage ripple
is high.
Содержание NX Active Front End
Страница 1: ...vacon nx ac drives active front end unit afe user manual ...
Страница 2: ......
Страница 96: ...7 vacon 94 Appendices Tel 358 0 201 2121 Fax 358 0 201 212 205 Figure 71 Wiring diagram for FI13 11226 pdf ...
Страница 109: ......