background image

92077r14

V200 POSITIONER

www.vacaccessories.com

5

2.3  4-20mA transmitter installation

2.3.1 Gearwheel installation

1. Remove the front cover and indicator

  on the V200 positioner. (see page 4)

2. Remove Indicator screw(1).

3. Install the gearwheel(2) so that it aligns over   

  the cam locking nut screw(3).

4. Secure the gearwheel with the 

  Indicator screw(1). 

2.3.2 Potentiometer installation

1. Install the potentiometer module(4) in 

  the designed section of the unit as 

  shown. Tighten the screw that secures

  the pot arm and spring. 

  The pot gearwheel should be aligned 

  and secured to the larger gearwheel. 

 

2. Install the potentiometer board(5) or the 

  4-20mA transmitter module(6) into the 

  designed position and tighten the respective   

 screws.

3. When used for the 4-20mA feedback, secure  

  the potentiometer connector(7) to the

  transmitter (6). For potentiometer use only,

  the connector(7) will attach to the terminal    

  block(5) and be used with an external position 

 transmitter. 

1

4

3

2

1

5

6

7

Содержание V200 POSITIONER

Страница 1: ...92077r14 V200 POSITIONER www vacaccessories com 1 V200 FEEDBACK OPTION...

Страница 2: ...2 3 1 Gearwheel installation 6 2 3 2 Potentiometer installation 6 2 3 3 4 20mA Transmitter setup 7 2 3 4 Connecting the control signal 7 2 3 5 4 20mA Transmitter Calibration 8 2 3 6 Trouble shooting R...

Страница 3: ...for on off or open closed indication The 4 20mA position transmitter mkII 3 responds to changes proportionally in the actuator valve package It is recommended that the V200 positioner be calibrated b...

Страница 4: ...cover Loosen the two screws 1 and remove the front cover 2 2 2 Removing the indicator Pull the indicator 2 straight up it is a friction fit Important Note Note the indicator s position so it can be in...

Страница 5: ...Install the potentiometer module 4 in the designed section of the unit as shown Tighten the screw that secures the pot arm and spring The pot gearwheel should be aligned and secured to the larger gear...

Страница 6: ...h the Black or Blue colored lead facing to the left 4 CW rotation the potentiometer lead connector 2 fitted with the Black or Blue colored lead facing to the right The position transmitter can be cali...

Страница 7: ...tiometer 7 marked zero so that the meter reads 4mA 6 Set the valve actuator to the open position 20mA 7 Adjust the trim potentiometer 8 marked span until the meter reads 20mA 8 Re check the zero posit...

Страница 8: ...pot 3 10 12 turns clockwise 5 Turn the FEEDBACK pot 1 until 3 7 3 9 mA is achieved 6 Adjust the ZERO pot 2 clockwise to 4mA 7 Open the valve 8 Adjust the SPAN pot 3 to 20mA 9 Close the valve 10 Repea...

Страница 9: ...allation Connect your control system equipment cables to the terminal blocks 6 Maximum cable size AWG 11 4 mm2 2 4 3 Switch calibration The switch activating points can be adjusted by turning the fric...

Страница 10: ...92077r14 www vac se V200 POSITIONER 10 3 1 Exploded drawing Feedback options 3 SPARE PARTS...

Страница 11: ...ck 3 terminals 92064 2 Spacer DRN 3260x7 5 Plastic PA 3260075 2 Screw ISO 7045 MRX3x12 Steel Zinc plated 7045031212 2 Screw ISO 7045 MRX3x20 Steel Zinc plated 7045032020 2 Screw ISO 7045 MRX3x25 Steel...

Страница 12: ...nical and electrical life Over 100 million operations Inductive Sensors NAMUR module Type NAMUR 2 wire V3 P F NJ2 V3 N Power supply 5 25 VDC 2 wire Output signal Target absent off 3mA 15mA max Target...

Страница 13: ......

Страница 14: ......

Отзывы: