background image

PV Connection

Warning:

Note:

PV cable suggestion

Cross-section

4mm²

The hybrid inverter has two MPPT channels, can be connected with two strings of PV panels. 

Please make sure below requirements are followed before connecting PV panels and strings to the 

inverter:

The fatal high voltage may on the DC side, please comply with electric safety 

when connecting.

Please make sure the correct polarity of the cable connected with inverter, other-

wise inverter could be damaged.

• The open-circuit voltage and short-circuit current of PV string should not exceed the reasonable 

range of the inverters.

• The isolation resistance between PV string and ground should exceed 300 kΩ.

• The polarity of PV strings are correct.

• Use the DC plugs in the accessory.

• The lightning protector should be equipped between PV string and inverter.

• Disconnect all of the PV (DC) switch during wiring.

STEP 1

STEP 2

Positive Crimp Contact

Negative Crimp Contact

Note:

Note:

Please use PV connector crimper to pinch the point of the arrow.

You’ll hear click sound when the connector assembly is correct.

Содержание VT-6607136

Страница 1: ...ode to access the manual in multiple languages WEEE Number 80133970 IN CASE OF ANY QUERY ISSUE WITH THE PRODUCT PLEASE REACH OUT TO US AT SUPPORT V TAC EU FOR MORE PRODUCTS RANGE INQUIRY PLEASE CONTAC...

Страница 2: ...n delivery Pay attention to waterproof Do not expose the inverter directly to water rain snow or spray 7 Alternative uses modifications to the inverter not recommended The warranty can become void if...

Страница 3: ...mode is for the regions with low feed in tariff and high electricity prices The energy produced by the PV system is used to optimize self consumption needs The excess energy is used to recharge the ba...

Страница 4: ...de is designed to reward customers who do their part to reduce demand on the electric grid particularly during peak usage periods Use most of your electricity from PV energy and during off peak time p...

Страница 5: ...eriods of time discharge setting the battery will be charged firstly The Selling First mode is suitable for the regions with high feed in tariff When the grid fails the system will automatically switc...

Страница 6: ...ructions Warrenty Card Monitor Quick Installation Instructions No Qty Items No Qty Items 1 1 Hybrid Inverter 11 1 Grounding Terminal 2 1 Certificate Of Inspection 12 1 Wall Mounting Bracket 3 1 Quick...

Страница 7: ...oduct Overview Inverter Terminals No Items No Items 1 DC Switch 5 Communication Port 2 DC Connectors For PV Strings 6 AC Port EPS Port 3 DC Connectors For PV Strings 7 Monitor Module Port 4 Battery Po...

Страница 8: ...olid surface far from flammable or corrosion materials where is suitable for inverter s weight and dimensions The ambient temperature should be within 25 C 60 C between 13 F and 140 F The installation...

Страница 9: ...Mounting STEP 1 STEP 2 Leave the enough space around inverter easy for accessing to the inverter connection points and maintenance...

Страница 10: ...NTC Meter 485A 2 NTC Meter 485B 3 Dry Contact BAT 485A 4 Dry Contact BAT CANH 5 DRM BAT CANL 6 DRM BAT 485B 7 485A CTU 8 485B CTN Note For diesel generators or multi machine parallel use please contac...

Страница 11: ...r other wise inverter could be damaged The open circuit voltage and short circuit current of PV string should not exceed the reasonable range of the inverters The isolation resistance between PV strin...

Страница 12: ...stributor or VTAC for technical support Note Set battery type and manufacturer please refer to Chapter 5 3 BMS Battery Management System communication is needed between inverter and battery Pass the c...

Страница 13: ...ated ter minals parallel with the terminals the crimping screw torque is 2 0 0 1N m A click sound will be heard when the connector assembly is correct Use an open end wrench to tighten the waterproof...

Страница 14: ...BAT CAN RS485 BAT NTC...

Страница 15: ...Multi Inverter Parallel...

Страница 16: ...otector or breaker first before connecting emove insulation sleeve 11mm 0 5 inch length unscrew the bolts insert the AC input wires according to polarities indicated on the terminal block and tighten...

Страница 17: ...STEP 2 STEP 3 GRID EPS Load GRID EPS Load Fix the AC wiring cover with cover screws...

Страница 18: ...nstall the CT Meter and a current sensor CT for short below are used to detect current power direction of the local load and the grid The output control function of the inverters will be activated bas...

Страница 19: ...nication The monitoring module could transmit the data to the cloud server and display the data on the PC tablet and smart phone WIFI Ethernet GPRS RS485 communication is applicable to the inverter Pl...

Страница 20: ...module flashes indicating that the monitoring module is successfully connected Note Note A second protective earth PE terminal should be connected to the inverter This prevents electric shock if the...

Страница 21: ...y Fix the grounding screw to the grounding connection of the machine housing STEP 2 Operation Control Panel No Items No Items 1 LCD Display 5 UP Touch Button 2 POWER LED Indicator 6 DOWN Touch Button...

Страница 22: ...e inverter is stand by OFF The inverter is power off GRID ON Green The inverter is feeding power OFF The inverter is not feeding power FAULT ON Red Fault occurred OFF No fault 3 6kW hybrid inverter ha...

Страница 23: ...ter Any doubts please contact distributor for more details Inverter Setting System parameters setting System parameters setting Safety Specifications Note Select the safty according to the requirement...

Страница 24: ...V Mode Operating parameters setting Operating parameters setting 1 No PV connection 2 Independent and Parallel setting for professional installers 5 4 3 2 5 4 3 2 Note Please select the right battery...

Страница 25: ...fer to chapter 3 2 of the user manual Operating parameters setting Operating parameters setting Energy management system parameters setting 1 Self Use 2 Back Up 3 Selling First 4 Maintain In developme...

Страница 26: ...arge discharge power range 10000W 10000W 1 Upper state of charge 2 Lower state of charge 3 Battery Overvoltage Threshold 4 Battery undervoltage threshold 5 Maximum charging current 6 Maximum discharge...

Страница 27: ...e 1 6 AC charging can be set up to three time periods Energy management system parameters setting 5 4 3 2 Energy management system parameters setting Forced Charging Forced charging 5 4 3 2 1 ForceChg...

Страница 28: ...und detection 4 Voltage upper limit 5 Voltage upper limit time 6 Voltage lower limit 7 Voltage lower limit time 8 Frequency upper limit 9 Frequency upper limit time 10 Frequency lower limit 11 Frequen...

Страница 29: ...enEn Diesel generator enable 2 TimeCtr1Em Time control enable 3 TimeDelay Delay time of diesel generator start working 4 StarSoc Battery power percentage when diesel generator start charging the batte...

Страница 30: ...hybrid inverter should be set following Chapter 5 3 at the first time When inverter running under normal mode Running indicator will light up Ref to Chapter 5 1 Restart Hybrid inverter please follow...

Страница 31: ...cation If the fault occurs contin ously and frequently please ask help for local distribu tors A04 Pv1OverVoltFault PV Voltage over Reconfiguration of PV strings reduce the PV number of a PV string to...

Страница 32: ...ault A41 Pv9AbnormalFault A42 Pv10AbnormalFault A43 Pv11AbnormalFault A44 Pv12AbnormalFault A45 Pv13AbnormalFault A46 Pv14AbnormalFault A47 Pv15AbnormalFault A48 Pv16AbnormalFault A49 Pv17AbnormalFaul...

Страница 33: ...atTempSenso rOpen Battery temperature sensor abnormal Check battery temperature sensor and connected wires damage or not then rectifi cation or change new one B08 PcsBatTempSen sorShort B09 BmsBatSyst...

Страница 34: ...will restart au tomatically when the grid return to normal Check inverter connected with grid connectors and ca ble normal or not C02 GridUnbalanVolt Fault Grid Voltage unbal anced The inverter will r...

Страница 35: ...r will restart auto matically when the grid three phase return to normal Contact with local distribu tor or required grid company adjust frequency protection parameters C10 GridUnderFreqFault Grid Fre...

Страница 36: ...urrent over triggered by Software logic Power off power on then restart If those faults occurs continuously and frequent ly please ask help for local distributors E14 Pv2SwOverCurrFault E15 Pv3SwOverC...

Страница 37: ...BalBridge HwOverCurFault Bus Controller cur rent over Power off then restart Ref Chapter8 If those faults continuously and frequently please ask help for local distributors E52 BusBalBridg eSwOverCurF...

Страница 38: ...r local distribu tors F09 PLLFault PLL abnormal Power off then restart Ref Chapter8 If those fault occurs contin uously and frequently please ask help for local distribu tors F10 GridRelayFault Grid r...

Страница 39: ...If those faults occurs continuously and frequent ly please ask help for local distributors G02 PV2CurAdChanFault G03 PV3CurAdChanFault G04 PV4CurAdChanFault G05 PV5CurAdChanFault G06 PV6CurAdChanFaul...

Страница 40: ...nt temperature over or low Change or improve the installation environment temperature make running temperature suitable Power off then restart Ref Chapter8 If those faults occurs continuously and freq...

Страница 41: ...er CPU abnormal I10 HmiComWarning HMI abnormal I11 FreqCalcCon flictWarning Frequency value ab normal I12 UnsetModel Running model is not initial Contact with local distrib utor Outside Warnning J01 M...

Страница 42: ...ef Chapter8 If this those faults continu ously and frequently please ask help for local distribu tors J05 ParallelComWarn ing Communication be tween master invert er and slaver ones abnormal in parall...

Страница 43: ...40 60 Battery Type Li ion Lead acid etc AC GRID Max Continuous Current A 17 0 Max Continuous Power kVA 3 6 Nominal Grid Current A 16 4 15 7 Nominal Grid Voltage V 198 to 242 220 207 to 253 230 Nominal...

Страница 44: ...tion Yes Enclosure Protect Level IP65 NEMA4X GENRAL DATA VT 6607136 Dimensions L x W x H mm 370 x 513 x 192 Weight kg 17 Topology Transformerless Cooling Intelligent Fan Relatively Humidity 0 100 Oper...

Страница 45: ...gh London UK Postcode SL1 6BW Thank you for selecting and buying V TAC Product V TAC will serve you the best Please read these instructions carefully keep this user manual handy for future reference I...

Страница 46: ...therwise agreed herein this manual will only be used as guidance Any statement information or suggestion in this manual will not take any form of responsibility Without written permission any content...

Страница 47: ...ove the Module 1 WIFI MODULE INSTALLATION Implication Lights Status Description All lights are single green lights Communication with router Communication with inverter WIFI Module running status 1 Li...

Страница 48: ...cess to the network 2 Check the router s setting if the connection is limited 3 Contact our customer service 1 Check the connection between WIFI Module and inverter Remove the WIFI Module and install...

Страница 49: ...ethods and key press descriptions for Reset button NOTICES FOR RESET BUTTON USER MANUAL FOR SOLARMAN SMART APP Notice Do not remove waterproof plug Key press Status Descrip on Light Status Short press...

Страница 50: ...packaging or on the logger body 4 Network Configuration After the logger is added please configure the network to ensure normal operation Go to Plant Details Device List find the target SN and click...

Страница 51: ...heck plant data Usually the data will be updated in 10 mins If configuration failure occurs please check the following reason and try it again 1 Make sure WLAN is ON 2 Make sure WiFi is normal 3 Make...

Страница 52: ...V DUUDQW DUG 0RQLWRULQJ 4XLFN Q DOODWLRQ Q UXFWLRQV DOO 0RXQWLQJ UDFNHW LULQJ RYHU 6FUHZ 6HFXULW 6FUHZ 1 1 1 1 1 2 3 3 1 1 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 CT LULQJ 7HUPLQDO AC WDW...

Страница 53: ...UUHFW Note 3OHDVH XVH 39 FRQQHFWRU FULPSHU WR SLQFK WKH SRLQW RI WKH DUURZ 1 2 Note DWWHU FDEOH VXJJH LRQ URVV VHFWLRQ 19 1mm 3DVV WKH FULPSHG EDWWHU KDUQHVV WKURXJK WKH ZDWHUSURRI FRQQHFWRU DQG WKH F...

Страница 54: ...2 3 RS485A 6 4 5 56 BAT 485 CAN 485 1 2 Note DEOH VXJJH LRQ URVV VHFWLRQ Note 7KH 0D SRZHU ORDG FRQQHFWV WR 36 SRUW VKRXOG QRW H FHHG WKH LQYHUWHU V 36 0D RXWSXW SRZHU UDQJH Note 7KH ZLULQJ WHUPLQDOV...

Страница 55: ...version PRO version WIFI CONNECTION GROUND CONNECTION Con gure the Monitor Module router account registration etc Please check the WiFi connection manual for details 2 1 Note DUWK FDEOH 3 VXJJH LRQ U...