background image

 

 

 

34 

 

Users should conduct a visual inspection of the RESS monthly. Please refer to the following table for 
monthly maintenance. 

Table 14. Monthly maintenance 

Item 

Refer Standard 

Abnormal Handling Suggestion 

Battery 
appearance 

 

The appearance is neat and clean without 
stains. 

 

The battery terminals are intact. 

 

The battery shell is intact, and there are no 
bumps, breaks, or cracks around it. 

 

The appearance of battery has no leakage. 

 

There is no deformation or bulging of the shell. 

 

If there is dirt on the surface, clean the 
battery module's appearance with a 
cotton cloth. 

 

If the appearance is damaged, leaking, or 
deformed, take a photo and replace the 
problem battery module. 

 

Please contact Vestwoods in time for 
other abnormal situations. 

Operation 
environment 

The operation environment is between 0

-45

Operation humidity range: 

95% RH. 

If temperature and humidity are abnormal, 
check the indoor air conditioner status. 

6.3

 

Quarterly Maintenance 

Please refer to the following table for the quarterly maintenance of RESS. 

Table 15. Quarterly maintenance 

Item 

Refer Standard 

Abnormal Handling Suggestion 

Cable 

 

There is no aging of the connecting 
wire and no cracking of the insulation 
layer. 

 

The bolts at the cable connection are 
not loose. 

 

Replace the faulty cable. 

 

Fasten the screws. 

6.4

 

Yearly Maintenance 

It is recommended to perform trend analysis on recorded data (battery and environment). 

 

 

Содержание VT-204100

Страница 1: ...Thank you for selecting and buying V TAC Product V TAC will serve you the best Please read these instructions carefully keep this user manual handy for future reference If you have any another query p...

Страница 2: ...d with a high level of risk which if not avoided will result in death or serious injury Warning Indicates a hazard with a medium level of risk which if not avoided could result in death or serious inj...

Страница 3: ...VT 204100 VT 204100 VT 204100 VT 204100 VT 204100...

Страница 4: ...oduction 3 1 Battery Cabinet The appearance of the battery cabinet is shown as follows Figure 2 Battery cabinet appearance The battery cabinet dimensions are shown as follows Figure 3 Battery cabinet...

Страница 5: ...I 6 Equalization Negative equalization 300 mA 7 Operation voltage range VEH192100C 168 V 204 V VEH204100C 179 2 V 217 6 V 8 Self discharge 3 per month 9 Max continuous charge current 100 A 10 Max cont...

Страница 6: ......

Страница 7: ...ltage 3 65 V 9 Discharging cut off voltage 2 50 V 10 Operating charging temperature 0 55 11 Operating discharging temperature 20 45 12 Storage temperature 20 45 less than 1 month 0 35 less than 12 mon...

Страница 8: ...ppearance is shown as follows Figure 5 Battery module appearance The battery module s three views are shown as follows Figure 6 Battery module three views unit mm 3 2 2 2 Operation Panel The battery m...

Страница 9: ...2 Running indicator Indicate battery module running status 3 Reset switch Reset BMU 4 Output connectors Battery module output connectors 5 Ground Ground 3 2 2 3 PIN Definition The PIN definition of a...

Страница 10: ......

Страница 11: ......

Страница 12: ...ation panel is shown as follows Table 6 Operation panel definition No Items Remark 1 DC input switch BMS 24V power supply control 2 External communication port Master high voltage box SCADA communicat...

Страница 13: ...t the next high voltage box Optional 4 CAN1L 5 CAN2H Inverter communication 6 CAN2L 7 DI Low voltage wake up 8 DI 9 AC L AC input 10 AC N BMU communication port The PIN definition of the BMU communica...

Страница 14: ...VT 204100...

Страница 15: ...e of the BMS is shown as follows Figure 13 Communication topology 3 3 1 BMU The BMU integrated with the battery module is the initiating unit of the BMS It monitors battery voltage and temperature and...

Страница 16: ...nd trigger protection when alarm and emergency battery module possible failures appear to ensure the safety reliable and stable operation of battery modules BCU s main technical specifications are sho...

Страница 17: ...ter charging current and cluster discharging current in real time SOC estimation Estimated the battery cluster SOC DI DO communication PCU provides multiple DI and DO interfaces CAN and RS485 communic...

Страница 18: ......

Страница 19: ...VT 204100...

Страница 20: ......

Страница 21: ...ight the coil can be removed before assembly Figure 16 Fixing the battery box 2 4 Two sets of battery cabinets are xed install 2 pcs guide rails of battery box 2 then open the battery cabinet doors an...

Страница 22: ...alled against the wall it can be fixed on the wall 7 Use a hammer drill to drill holes for installing the expansion bolts and then install the expansion sleeves in the holes Figure 19 Expansion bolt c...

Страница 23: ...e expansion bolt using a hammer until the expansion sleeve is fully inserted into the hole C Partially tighten the expansion bolt D Remove the bolt spring washer and flat washer 8 Place the cabinet in...

Страница 24: ...and installation The address of the battery module can be automatically assigned after the battery module is powered on 2 Fixing the battery modules to the cabinet with the cross recessed pan head co...

Страница 25: ...king connector are as follows A Adjust the direction of the self locking connector to align with the battery module terminal B Rotate the self locking connector slightly and it will be sucked in autom...

Страница 26: ...ve pole and black corresponds to the negative pole The internal wiring of the battery cabinet is the same This chapter takes a battery cabinet as an example to introduce Please take care of the remove...

Страница 27: ...VT 204100...

Страница 28: ...he inverter to the user side please refer to the inverter user manual 1 Please confirm the usage scenarios of the inverter according to the actual situation For details please refer to the inverter us...

Страница 29: ...VT 204100...

Страница 30: ...system has completed the system parameter settings at the factory and the system will run automatically after power is on The inverter needs to be set according to actual needs For detailed operation...

Страница 31: ...VT 204100...

Страница 32: ...maged leaking or deformed take a photo and replace the problem battery module Please contact Vestwoods in time for other abnormal situations Operation environment The operation environment is between...

Страница 33: ...and Abbreviations AC Alternating Current BMU Battery Management unit BMS Battery Management System BCU Battery Control Unit DC Direct Current PCU Protocol Converter Unit SOC State of Charge SOH State...

Отзывы: