![V-TAC VT-204100 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/v-tac/vt-204100/vt-204100_instruction-manual_3085152023.webp)
25
Figure 20. Installing expansion bolts (unit: mm)
A
Drill holes in the ground by using a hammer drill.
B
Partially tighten the expansion bolt and vertically insert it into the hole. Hit the expansion bolt
using a hammer until the expansion sleeve is fully inserted into the hole.
C
Partially tighten the expansion bolt.
D
Remove the bolt, spring washer, and flat washer.
8
Place the cabinet in the installation location. Use M10×90 expansion bolts to fix the expansion
holes of the master cabinet and slave cabinets to the ground.
Figure 21. Location of the mounting holes (unit: mm)
Содержание VT-204100
Страница 3: ...VT 204100 VT 204100 VT 204100 VT 204100 VT 204100...
Страница 6: ......
Страница 10: ......
Страница 11: ......
Страница 14: ...VT 204100...
Страница 18: ......
Страница 19: ...VT 204100...
Страница 20: ......
Страница 27: ...VT 204100...
Страница 29: ...VT 204100...
Страница 31: ...VT 204100...