18
Operating instructions VisionLine
18
3�2�4 Installation of the optional wall bushing „double socket“
1. hose connector
2. double socket
3. machine wall
4.hose connector
Once the camera is positioned, a suitable position must be found for the wall bushing of the cab-
le-hose -package. Ideally, this should be freely accessible so that the coupling nut can then be tighte-
ned with a suitable tool. Furthermore, the position should be determined in such a way that sufficient
space remains outside the machine to position the control box.
At the chosen position a Ø30mm hole is needed in the machine wall (no. 3). This should preferably
be done with a step drill or a sheet metal punch.
Make sure that the contact surfaces on both sides are free of burrs and dirt so that the wall bushing
seals properly. The hose connectors have an integrated sealing lip and do not require any further
sealing elements.
Insert a hose connector (pos. 4) with the thread from the inside of the machine through the hole to
the outside and screw it tight with the double socket (pos. 2). The second hose connector (pos. 1) is
mounted on the other side of the double socket.
Ideally, you should use the side cable duct of the control box for this mounting variant.
You have two possibilities to fix the control box
1. You can use the optionally available magnetic feet for our control box.
2. You attach the control box to your machine with suitable screws.