16
Operating instructions VisionLine
16
3�2�2 Direct wall mounting with integrated ball joint without hose assembly
Preparations on the machine tool:
At the chosen position a Ø30mm hole is needed in the machine wall. This should preferably be done
with a step drill or a sheet metal punch.
Installation of the control box:
Carry the wall mount (no. 1) with the attached flat seal (no. 4) from the interior of the machine through
the hole. On the outside of the machine, the control box (no. 5) must now be placed on the wall mount
(no. 1) and tightened with a washer (no. 7) and the nut (no. 2).
The control box must be aligned with the connections in such a way that the hose and cable are opti-
mally routed.
Installation of the wall mount and the camera:
First guide the cables, which hang out of the connecting sleeve (no. 9) of the camera, through the wall
mount (no. 1) into the control box.
Then push the connecting sleeve (no. 9) with the O-ring (no. 8) into the wall mount (no. 1). In this step,
you can already roughly align the camera. The fine adjustment can be done later via the integrated ball
joint. Fix the camera by tightening the union nut (no.6).
1. wall mount
2. nut M30x1,5
3. machine wall
4. flat seal
5. control box
6. union nut
7. washer
8. o-ring
9. connection sleeve