Level limit switch
Series RF 3000
Technical Information / Instruction manual
page
Manual Function Test (proof test)
Calibration - general items
Reset to "Power up
calibration at first time
operation"
It may be required, that an already calibrated unit shall do a new Power up calibration when the
supply voltage is switched on (e.g. if the unit shall be installed in a different bin or shall be pesetted
and afterwards send to the end user).
To do this, press the CAL button for 3 seconds to initiate a Push button calibration. While the
calibration is running ("CAL" is displayed), switch off the supply voltage. Since the calibration was
startet, but not sucessfully finished, it will automatically start again when power is back.
Note: Only the calibration is affected, the settings in the menus will not change.
Data storage of last valid
calibration values
If power supply is switched off, the last valid calibration values are stored and are still valid when
power is switched on again.
General items
The unit allows to test the internal electronics and the external connected signal evaluation.
Test procedure
In Measurement mode:
Start the test by pressing the TEST button for 3 seconds.
Note: If "Code" is displayed, a Lock Code is required. Set the code number with the arrow buttons
and confirm with the Menu button. Then press again the TEST button for 3 sec to start test procedure.
Test runs for ca. 20 seconds. Display states "TST". Signal output and yellow status LED will change
state for ca. 10 sec and then return to former state (relais on-off-on or off-on-off).
If test result is not okay, the display states "ERR", red LED is on, Relais is set to de-energized.
Electronic is defect and must be changed.