UTS UTS 700 ONEMAN Скачать руководство пользователя страница 5

Page 5

 

UTS SALES & REPAIRS LTD

 

• 

User training courses cannot be a substitute for instruction manuals but only complement them.

 

• 

Only the original UTS components specified in the manual shall be used.

 

• 

Mobile access and working towers designed in accordance with BS EN 1004

-

1:2020 are not anchor points for 

personal fall arrest equipment.

 

• 

Working is only permitted on a platform with a complete side protection including guardrails and toe boards.

 

• 

Mobile access and working towers are not designed to be used as edge protection.

 

 

STABILISERS & BALLAST

 

Stabilisers or outriggers and ballast shall always be fitted when specified. When using the MAT externally stabilisers 
must be fitted. Should ballast be required, a platform should be positioned on the lowest rung and the weights should 
be firmly attached to it and evenly distributed. For advice on ballast contact your supplier.

 

 

LIFTING OF EQUIPMENT

 

Tools and other equipment should be hauled up by a person on the platform using rope or similar, through the 
trapdoor of the platform or within the tower footprint.

 

Please see footprint guide on page 16.

 

Safe working loads of platform and tower not to be exceeded.

 

 

MOVING THE TOWER AND LEAVING IT UNATTENDED

 

• 

Adjust the stabilisers to provide ground clearance.

 

• 

Unlock the castor wheels.

 

• 

Move with manual force only, and only from the base.

 

• 

Beware of (overhead) obstructions –

 

live wires, hanging apparatus or other objects.

 

• 

Do not move with people or material on the tower.

 

• 

Do not move the assembled MAT if wind speeds exceed a moderate breeze. Relock the castors and readjust 
the stabilisers once in the new position.

 

• 

When moving the tower over uneven or sloping ground remove all tools.

 

• 

Do not move the assembled tower if over 4 meters high.

 

• 

Recheck that the MAT is vertical or needs readjustment of legs before ascending. (Using spirit level)

 

• 

Mobile access and working towers shall only be moved on a flat and solid ground without obstacles and not on 
a slope of more than 10mm/1m

 

• 

It is recommended that towers should be tied to a solid structure, when left unattended.

 

 

TIES

 

When ties are required, they should be in accordance with table 17 of BS 5973:1990 and table 24 of BS 5975:1982.

 

Always tie to a solid structure.

 

The tie frequency should be at 4 meter intervals or less vertically.

 

 

FITTING TOE

-

BOARDS

 

1 piece folding toe board

, fold out over platform making sure location angle rests fits securely on side of platform.

 

 

LIFTING OF INDIVIDUAL TOWER COMPONENTS

 

Raising and lowering components, tools and/or materials by rope should be conducted within the tower base (i.e. 
within the area bounded by the stabilisers). Ensure that the safe working load of the supporting decks and the tower 
structure is not exceeded.

 

Check for environmental changes before every use. (i.e.: all weather conditions) Refer to next page for wind effects.

 

Содержание UTS 700 ONEMAN

Страница 1: ...ssembly Personnel should be qualified or competent to erect this tower Please consult the PASMA s code of practice for full information on the use of Mobile Access Towers Remember to do a risk assessm...

Страница 2: ...UTS 700 ONEMAN INSTRUCTION MANUAL Page 2...

Страница 3: ...nce 6 Components and Weights 8 Assembly 9 Dismantling 17 Configurations and Weights 18 Risk Assessment Form 19 UTS 700 ONEMAN Instruction Manual Mobile Access Tower UTS SALES REPAIRS LTD UNIT 1A CANTE...

Страница 4: ...efore assembly or erection of this Mobile Access Tower MAT please ensure that A risk assessment has been done and all safety equipment is on site The ground conditions will take the working loads of M...

Страница 5: ...and only from the base Beware of overhead obstructions live wires hanging apparatus or other objects Do not move with people or material on the tower Do not move the assembled MAT if wind speeds exce...

Страница 6: ...ded as a complete structure Always keep this instruction manual safe Broken damaged or incorrect components must never be used The equipment shall be quarantined and assessed for replacement repair or...

Страница 7: ...braces DOWNWARD or from the inside facing OUTWARD BUT NEVER INWARD FITTING ADJUSTABLE LEGS Take the adjustable leg assembly complete with its castors make sure that all the adjusting nuts are positio...

Страница 8: ...em Description Weight Kg 1 150mm Locking Caster 3 4 6 1 3m OMT Brace 6 2 Adjustable Leg 500mm 1 1 7 Complete Toe Board Set 6 3 1m 4 Rung Frame 5 6 8 OMT Hanging Bracket 1 4 1 3m Trapdoor Platform 9 1...

Страница 9: ...e never the outside When working on the platform never overreach The end frames should provide a firm hand hold Insert adjustable leg assembly with castors or base plates into the base of a rung end f...

Страница 10: ...sure bottom clamps are locked refer to page 7 Insert 4 rung sides onto each end of the tower ensure they clip in refer to page 6 Fit OMT Brace to 6th and 8th rungs of towers ensure bottom clamps are l...

Страница 11: ...S SALES REPAIRS LTD Fit a trap door platform to 4th rung of the tower engage the wind locks If completing at 1 2m fit toe boards to the working platform see instructions on page 4 5 If not continue to...

Страница 12: ...ng frames together using the clips then climb the tower on the inside using the rungs of the end frames Fit these double 4 rung ends to each end of the tower as shown Fit a OMT Brace to the 9th and 11...

Страница 13: ...2th rung lock wind locks From a seated position within the trap door of the platform fit a OMT Braces to the 14th and 16th rungs of the tower then ensure the bottom clamps are locked Fit toe boards to...

Страница 14: ...er using the clips then climb the tower on the inside using the rungs of the end frames Insert these onto each end of the tower ensure they clip in refer to page 6 Fit a OMT Brace to the 5th and 7th r...

Страница 15: ...d From a seated position within the trap door of the platform fit a OMT Braces to the 14th and 16th rungs of the tower then ensure the bottom clamps are locked If completing at 2 2m fit toe boards to...

Страница 16: ...hown Add a platform on the 16th rung lock wind locks Fit a OMT Brace to the 13th and 15th rungs of the tower the hang an assembly bracket from it to all the easy moving of components to higher levels...

Страница 17: ...tower at approx 45 degrees The bottom clamp should be fitted as low as possible refer to the diagram opposite Ensure that all four rubber feet are in contact with the ground and that the clamps are s...

Страница 18: ...g 500mm 4 4 4 4 1m 4 Rung Frame 4 6 8 10 1 3m Trapdoor Platform 1 1 2 1 3m Horizontal Brace 1 1 1 3m OMT Brace 3 4 Complete Toe Board Set 1 1 OMT Assembly Tool 0 1 Instruction Manual 1 1 S3 Stabiliser...