3. SYSTEM HANDLING
If the period of PCU installation is over 6 months, be sure to charge batteries for
at least 8 hours before the first use.
2.4 Storage
When the System is not installed immediately, it must be stored carefully in
vertical position, as indicated on the packing and conserved in a dry and
sheltered room. Cover it with an envelope so that it is protected from dust.
● Load will run on Inverter Output.
● After Connecting Mains Supply switch ON the GRID.
Page: 3
Содержание GAMMA+
Страница 25: ...Page 23...