background image

1. SAFETY

    1.1. General

1.2. Safety Warnings
1.2.1 Environment

1.2.2 Safety for persons

Hazardous voltage levels are present within the PCU.
PCU should be opened by qualified engineer only.

After the PCU shut down, a dangerous voltage will be present on the battery
terminals.

1.2.3 Safety for Product

Page: 1

Read safety notes carefully and thoroughly to ensure its correct installation and 
operation. Save this manual properly.
Installation,  maintenance  &  repair  of  the  equipment  should  be  undertaken  by 
trained, experienced and authorized service person.
The  handling,  installation  &  maintenance  of  the  battery  associated  with  this 
equipment,  must  be  done  in  accordance  with  the  instructions  &  safety 
precautions  given by the  battery manufacturer. Risk of a possible  electrocution 
is possible when the battery is connected to the PCU. Therefore, do not forget to 
disconnect  the  batteries  ,grid,  panel,  load  before  any  service  is  to  be  done  on 
the PCU.

To  disconnect,  remove  the  battery  fuse,  disconnect  all  connections  located  at 

the rear of PCU.

We  request  you  to  read  the  Manual  prior  installation,  performing 
start up procedures or system operation or maintenance.

 
For  any  information  regarding  installation/maintenance,  Please 
Call to on our nearest service center.

PCU packing must be recycled in compliance with regulations. Battery contains 
Lead  and  is  dangerous  substance  for  the  environment  hence  same  shall  be 
dispose of by Govt. approved agency only.

The System devices generate a large leakage current, grounding of the PCU & 
panel is necessary before connecting power. Improper connection may damage 
the device and lead to injuries. 

PCU  shall  not  be  installed  near  liquid  or  with  room  exceeding  specified  room 
temperature and humidity. Place the PCU in a room with proper ventilation and 
safe  distance.  All  ventilation  apertures  must  be  kept  free  and  clean.  Refer  to 
manual to perform installation.

Содержание GAMMA+

Страница 1: ...ar Priority of load battery charging Preference to Solar Power over Grid Power Pure sine wave output Protections RBP RSPV OVL BL OBC SC IHV ILV Compatible with DG as an input Source Compatible with IT...

Страница 2: ...f Working Modes Display Panel Details Scrolling Display 6 7 Display Back Light Color Description 8 Factory Setting Procedure 9 Block Diagram Flow Chart 10 11 12 System Description 13 Technical Speci c...

Страница 3: ...rget to disconnect the batteries grid panel load before any service is to be done on the PCU To disconnect remove the battery fuse disconnect all connections located at the rear of PCU We request you...

Страница 4: ...e the arrow on the box is pointing vertically upward direction Store it in dry location Storage temperature must be between 10 to 70 C Suitable handling equipment shall be used for handling of PCU The...

Страница 5: ...t use 2 4 Storage When the System is not installed immediately it must be stored carefully in vertical position as indicated on the packing and conserved in a dry and sheltered room Cover it with an e...

Страница 6: ...m Back View FAN OUTPUT 1 220V 50 60Hz AC INPUT Model No Serial No Capacity DC Volt Nominal Input VE VE BATTERY 12V _ ___ SOLAR 15 45V Max VE VE AC FUSE BATT REV FUSE BLOWN DC FUSE SPV REV 305 5 mm 115...

Страница 7: ...ion Menu SWITCHES PRESS SWITCH FOR 10 SEC Exit from Calibration PCU Smart Hybrid Mode Selection SWITCHES PRESS 1 TIME UP DOWN N A HOLD SAVE RESUME SYSTEM ON OFF SWITCHES PRESS 3 TIMES IT MODE SMF TUB...

Страница 8: ...F shows that Boost Charging is Disabled System ON OFF LED On Pressing Switch 1 time System will get ON and when we want to Switch OFF the System we can Press the Switch 1 time SMF TUB On Pressing Swit...

Страница 9: ...hows PCU mode has been selected as working mode SMT SMT SMT HYB HYB HYB PCU PCU PCU PCU BATT 5 SELECTION OF WORKING MODES HYB SMT PCU View 1 Now on pressing switch in to working modes window This wind...

Страница 10: ...otection Indication Display Display Parameter System ON IT Mode SMF TUB Grid Charging Disable Boost Charging Over Heat Mains Low High DG Mode Battery Low High Over Load Frequency Out Under Over voltag...

Страница 11: ...V PCU SPV FLT a 2 0 PCU SPV Kwh MAINS ON FLT FLT 0 1 250v PCU View 7 PCU Mode Mains Input Frequency is 50 0Hz FLT MAINS ON PCU Hz 50 0 PCU SPV View 3 PCU Mode SPV Voltage 34 7V FLT 34 7v PCU BATT FLT...

Страница 12: ...OR DESCRIPTION View 1 Inverter Open Circuit Error View 2 Grid Charger Open Circuit Error View 3 NTC Open Circuit Error View 4 Feed Back Transformer Error View 5 Fuse Blown Zero Crossing Error View 6 R...

Страница 13: ...Present When Mains Present When SPV Mains Present When SPV and Mains OFF and Only System ON Error E1 to E8 Protection RED SOLID GLOW RED BLINK LIGHT ORANGE SOLID GLOW ORANGE SOLID GLOW GREEN SOLID GL...

Страница 14: ...s Factory Setting Mode Simultaneously Simultaneously View 1 After Pressing Switchs for 15 sec First window will Appear as shown in its adjacent Fig which shows Battery Low Set point in CALIBRATION MOD...

Страница 15: ...age through solar window In this window by default 13 7V in oat and boost for SMF battery you can get variable voltage range 13 5 14 5V and Tubular Battery by default 15V boost 14 2V oat and variable...

Страница 16: ...ous procedure to change charging voltage from mains is similar as in case of view 1 1 1 2 1 3 After saving battery charging voltage through mains we will get battery charging current through solar win...

Страница 17: ...ote If you want to go next parameter without saving previous You should press switch After change parameter follow previous procedure 1 1 1 2 1 3 For changing the frequency Follow previous procedure 1...

Страница 18: ...AC Converter Output Load Battery Mains Grid Input PCU Page 16 13 FLOW CHART 13 1 Hybrid Mode PV OFF GRID OFF Load On Batt PV OFF GRID ON PV ON GRID OFF Load on Batt PV START CHG ON PV CHG on PV PV Gri...

Страница 19: ...LOAD ON PV BATT CHG BY PV PV ON GRID ON LOAD ON PV BATT LOAD ON GRID NO YES NO YES START BATT VOLT 15V 13 7V OR 13 5V WITH 100 CURR PV POWER LOAD POWER YES NO YES LOAD ON PV BATT CHG BY PV LOAD ON PV...

Страница 20: ...BATT LOAD ON BATT NO YES NO YES START LOAD ON GRID If BATT VOLT 11 2V Yes No LOAD ON GRID BATT CHG BY GRID BATT VOLT 15V 13 7V OR 13 5V WITH 100 CURR PV POWER LOAD POWER YES NO YES LOAD ON PV BATT CHG...

Страница 21: ...battery charging as well as take care of output load and su cient battery charge level 14 2 Priority Solar Battery Grid Solar Grid Battery Automatic Select System Comprises the following boards 1 Cont...

Страница 22: ...rature Cooling Max Relative Humidity 25 C Non Condensing Noise 1meter Standard Compliance Dimension LXWXH mm 12V Mosfet Boost Mosfet 230V 10 8V 10 5V 16 5 18A 13 7V 15V 13 7V 14 2V 13 5V 14 5V 13 5V 1...

Страница 23: ...ction from the system Page 21 17 PREVENTIVE MAINTENANCE Checkpoints Check points Check Electrical power connections for tightness on terminals Battery inter cell connectors for tightness and corrosion...

Страница 24: ...vi i ii i ii iii iv v vi i ii Check Solar PCU room ventilation is proper Reduce the load Contact Our Service Center Contact Our Service Center Contact Our Service Center Clean ventilation input by bl...

Страница 25: ...Page 23...

Страница 26: ...Any Support 91 9250 885 885 E mail service utlups com Website www upsINVERTER com Manufacturing Unit Village Naryal Near Sec 4 Barrier Parwanoo 173220 Himachal Pradesh INDIA MADE IN INDIA For Solar U...

Отзывы: