Operations
MTC Coring Unit. Operator’s Manual
© 2016 Utilicor Technologies Inc.
18
ATTENTION
1. Has the mini track loader or skid-steer been refueled?
2. Is the water tank full?
3. Are all other fluid levels topped up?
4. Are the pilot bit and coring drum in good condition? Examine both for excess wear and
replace if necessary. Check to make sure that you have spares of both items.
5. Do you have all necessary personal protection equipment?
6. Is the equipment secured to the trailer for transit?
7. When loading the mini track loader or skid-steer and MTC on the trailer, ensure that MTC is
raised high enough to clear the trailer in loading forwards or to clear the ground if loading
backwards, otherwise serious damage to the unit may result.
8. Are your Driver's Licensed, H2S, WHIMIS, First Aid certificates and are other necessary
documents available and current?
9. Have you completed all other pre-departure checks and procedures mandated by your
company?
This checklist is designed to make your job and your day run much smoother. You
may find it helpful to keep a copy of this list in the coring unit. Feel free to add to it
as you see fit.