The Utile Engineering Co. Ltd.
05/02/07
Irthlingborough, Northamptonshire. England
Tel: +44 (0) 1933 650216
Fax: +44 (0) 1933 652738
10 IC090CL
2.
To Re–assemble
Use Dow Corning Silastoseal 738RTV or equivalent as a jointing compound on
faces of volute casing (3) and body (2) to seal against gas leakage. Proceed as
follows:
2.1
Position circlip (12) in body (2).
2.2
Fit seal (9) into the body from the inner side, taking care not to damage
the sealing lip, fit with the spring side facing the impeller. Ensure that the
seal is pressed in approx. 2mm below the inner face of the housing (see
photo D).
2.3
Position the two bearings (8) on the shaft (4) using a mandrel press. Fit o-
ring (18) into seal ring (5) and push the seal ring onto the shaft with the
chamfered edge facing the impeller. Press the shaft assembly from the
pulley side into the housing (see photo C). Ensure the thrust washer (11)
is replaced before fitting end cap (6).
2.4
If renewing the shaft seal (10) in end cap (6) press in flush with outer
edge and with tension spring facing bearing. Refit end cap (6) with gasket
(17).
2.5
Fit shaft key (16), slide impeller (1) onto shaft, replace washer (7) and
firmly tighten left-hand nut (15) (see photo A).
2.6
Fit o-ring (13) into groove in body (2) and position housing assembly on
the volute casing studs (24). Replace nuts and washers (25 & 26).
2.7
Ensure the machine turns freely.
Leak test after assembly with nitrogen or air at a max. pressure of 0.3 bar (4.3 psi)
3.
Spare Parts
A stock of the main wearing parts at the installation site is important to the
constant availability and smooth running of the machine. We recommend the
following parts and quantities to be kept in stock at the installation site.
Description Part
Number
Quantity
Ball Bearing
H 1091
2
Oil Seal - Shaft Seal
F 1046/V
1
Oil Seal - Bearing Seal
F 1082/V
1
O-Ring - Shaft
F 1028/V
1
O-Ring - Body
F 1217
1
Gasket – End Cap
K 1103
1
Drive Belt
1
Always quote the machine serial number when ordering spare parts.
After Sales Service
Contact the address or telephone number shown at the bottom of each page or
our local distributor, for any after sales service, maintenance or service problems.
Contract maintenance, service exchange machines or a site visit by a Utile Engineering Service Engineer can also
be arranged in the same manner.
Utile Engineering can also provide Training Programs for all your requirements, from maintenance repair to
operator and supervisor training. They are structured to give specialist knowledge of our products and procedures
including use of authorised spares. The enacting of the Health and Safety at Work Act focused attention on the
responsibility of all parties, manufacturers, users and repairers on the repair of equipment. We strongly recommend
that repairs should be carried out to the original specification using authorised replacement parts where necessary.
Spare Parts
After Sales Service
To Re-assemble,
Spare Parts,
After Sales Service
B
C
D