![UTICA BOILERS UB90 125 Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/utica-boilers/ub90-125/ub90-125_installation-operation-and-maintenance-manual_1065206034.webp)
34
System Status
The indicator lights track the operating sequence. If the system locks out, the lights indicate the point in the sequence of
operation were lockout occurs. If this table does not readily provide the reason for boiler malfunction or non-operation,
refer to the following pages for more detailed troubleshooting procedures.
LIGHT
STATUS
INDICATES
POWER
ON
IBC is energized through 24 volt transformer.
OFF
IBC is not energized.
Blinking
IBC receives more than 40 VAC.
PURGE
ON
IBC is energizing the draft inducer and air fl ow is proven.
OFF
Off during purge cycle - draft inducer is not powered on or air fl ow is not proven.
Off during igniter and run cycle - normal operation, purge cycle complete.
Blinking
IBC is locked out. Problem could indicate false positive proof of air fl ow. Blocked vent,
intake air pipe, fl ue way, or orifi ce in negative pressure hose.
IGNITER
ON
IBC is energizing igniter.
OFF
Igniter is not energized.
VALVE
ON
IBC is energizing gas control valve to open.
OFF
Gas control valve is closed.
Blinking
IBC is locked out. Problem is fl ame has not been proven in three (3) ignition attempts.
May be due to broken igniter or lack of/low fl ame signal, or no gas.
FLAME
On Bright
Flame proven.
On Dim
Checking for fl ame signal (during trial for ignition)
OFF
Flame unproven.
TROUBLESHOOTING
Содержание UB90 125
Страница 30: ...30 SERVICE HINTS DETAILED SEQUENCE OF OPERATION ...
Страница 36: ...36 Troubleshooting Chart 2 TROUBLESHOOTING ...
Страница 39: ...39 Troubleshooting Chart 5 TROUBLESHOOTING ...
Страница 42: ...42 This Page Intentionally Left Blank ...
Страница 44: ...UTICA BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...