PAGE 19
INSTRUCTIONS FOR OPENING BURNER SWING DOOR
INSTRUCTIONS FOR OPENING BURNER SWING DOOR
INSTRUCTIONS FOR OPENING BURNER SWING DOOR
INSTRUCTIONS FOR OPENING BURNER SWING DOOR
INSTRUCTIONS FOR OPENING BURNER SWING DOOR
1. Turn off power to boiler.
2. Allow boiler to cool down.
3. Disconnect power cable at factory supplied burner electrical disconnect.
See figure 19 below.
4. Loosen screws on the sides of the lower front jacket panel. See figure 19 below.
5. Pull the bottom part of the lower front panel forward.
6. Lift the lower front panel up and off the boiler. See figure 19 below.
7. Close oil valve. See figures 15, and 16 on page 13.
8. Disconnect oil line from burner.
9. Do not try to swing door with oil line attached.
10. Remove nut from swing door stud on right hand side of door.
11. Swing open burner and door to the left.
Using a flue brush, brush the soot and scale into the combustion space where it can be
removed through the swing door opening.
CAUTION:
CAUTION:
CAUTION:
CAUTION:
CAUTION:
USE CAUTION WHEN VACUUMING IN THE CHAMBER AREA.
DAMAGE TO CHAMBER COULD RESULT.
It is recommended to replace the nozzle at the start of each heating season. Lubricate
the burner motor and circulator motor - if required - with a few drops of a good grade of light
motor oil. Do not over oil. Have a competent service person service the burner and check
the controls and check the electrodes for carbon or cracks in the insulators. Burners should
be adjusted to produce the conditions shown in Start-up and Adjustment of Oil Burner
procedure.
INSTRUCTIONS FOR CLOSING
INSTRUCTIONS FOR CLOSING
INSTRUCTIONS FOR CLOSING
INSTRUCTIONS FOR CLOSING
INSTRUCTIONS FOR CLOSING
BURNER SWING DOOR.
BURNER SWING DOOR.
BURNER SWING DOOR.
BURNER SWING DOOR.
BURNER SWING DOOR.
1. Swing burner and door to the right until
insulation is slightly compressed and
the stud is exposed.
2. Attach nut to the stud and tighten it
until the built in stop contacts the
mounting door.
3. Replace oil line to burner.
4. Replace lower jacket panel, and tighten
the screws.
5. Connect the power cable at the factory
supplied burner electrical disconnect.
6. Turn on power to boiler.
7. Bleed oil line.
FIGURE 19