![UTICA BOILERS MGB-100J Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/utica-boilers/mgb-100j/mgb-100j_installation-operation-and-maintenance-manual_1065177015.webp)
15
9 - ELECTRICAL SECTION
ELECTRICAL WIRING
See wiring diagrams on the following two pages for
details.
Electrically bond boiler to ground in accordance with
requirements of authority having jurisdiction. Refer to
National Electrical Code, ANSI/NFPA 70.
THERMOSTAT INSTALLATION
1.
Thermostat should be installed on inside wall about
four feet above
fl
oor.
2.
NEVER install thermostat on outside wall.
3.
Do not install thermostat where it will be affected by
drafts, hot or cold pipes, sunlight, lighting
fi
xtures,
televisions,
fi
replace, or chimney.
4.
Check thermostat operation by raising and lowering
thermostat setting as required to start and stop
burners.
5.
Instructions for
fi
nal adjustment of thermostat
are packaged with thermostat (adjusting heating
anticipator, calibration, etc.)
WARNING
Electrical shock hazard. Turn OFF electrical power
supply at service panel before making electrical
connections. Failure to do so could result in death
or serious injury.
!
Содержание MGB-100J
Страница 17: ...17 10 WIRING DIAGRAM Figure 14 Integrated High Limit Electronic Ignition Control 240008781 ...
Страница 18: ...18 10 WIRING DIAGRAM Figure 15 Integrated High Limit Electronic Ignition Control 240008781 ...
Страница 28: ...UTICA BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...