15
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
29
. Insert the center joint (CJC) in between the
top ‘U’ channel (TC1C & TC2C) and wall panel.
See fig.1. Line up the pre drilled holes and secure
with (S1) screw. See fig.2. Line up the pre drilled
holes on the corner column (CCC) and top ‘U’
channel and secure with (S1) screws.
See fig.3&4.
Back
TC1C
TC2C
1 & 2
3
4
Fig.1
Fig.2
Fig.3
Fig.4
TC1C
TC2C
TC2C
TC1C
TC1C
TC2C
CCC
CCC
S1
S1
S1
CJC
30
. Secure the top ‘U’ channels with wall panels
by (S1) screws from inside.
S1
Back Inside